← Back
Predominantly retail with other uses
2162 3 AVENUE
MANHATTAN · BIN 1081475
💬 Discuss this project
1930Year Built
4Stories
K4Building Class
C4-6Zoning
29,607 sfGross Floor Area
8Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: NEW LIFE HOLDING CORP · 11,395 sf lot · 2.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/15/2025$15.0M—— → —$507/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL SJ MAZZELLA, RA110/23/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK BUENO EXPEDITING203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH BOTTA, PE, PC1139110/23/2020
Building Lifecycle
All (8)Filed (1)Special Inspection (7)
10/23/2020
Filed — Alteration
INSTALLATION OF(4) MINI-SPLIT HVAC UNITS AT FIRST FLOOR
M00416687-I1
10/21/2020
Special inspection requirement — Mechanical Systems
JOSEPH BOTTA
10/21/2020
Special inspection requirement — Final
JOSEPH BOTTA
10/21/2020
Special inspection requirement — Energy Code Compliance Inspections
Michael Mazzella
10/21/2020
Special inspection requirement — HVAC and service water heating system controls
Michael Mazzella
10/21/2020
Special inspection requirement — HVAC and service water heating equipment
Michael Mazzella
10/21/2020
Special inspection requirement — Maintenance information
Michael Mazzella
10/21/2020
Special inspection requirement — HVAC insulation and sealing
Michael Mazzella
Nothing on file for this building.
1 project · most recent 10/23/2020
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/23/2020Signed-offSYMMETRICAL CONSTRUC CORPAir Conditioning Systems
Cooling
Comfort Aire INVERTEFLEX 24,000 BTU ×6
INVERTERFLEX 42,000 BTU · Condensing Unit ×3
Cooper & Hunter MULTI-ZONE 18,000 BTU · Ahu ×2
MULTI-ZONG 18,000 BTU ×1
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/21/2020Mechanical SystemsJOSEPH BOTTAspecial
10/21/2020FinalJOSEPH BOTTAprogress
10/21/2020Energy Code Compliance InspectionsMichael Mazzellaprogress
10/21/2020HVAC and service water heating system controls Michael Mazzellaenergy_progress
10/21/2020HVAC and service water heating equipment Michael Mazzellaenergy_progress
10/21/2020Maintenance informationMichael Mazzellaenergy_progress
10/21/2020HVAC insulation and sealing Michael Mazzellaenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00416687-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature6
08/26/2026M00416687-I1Open ↗
08/26/2026M00416687-I1Open ↗
08/26/2026M00416687-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/04/2026M00416687-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026M00416687-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/04/2026M00416687-I1Open ↗