← Back
BuildNYC
Two family frame
2163 QUIMBY AVENUE
BRONX · Castle Hill-Unionport · BIN 2022952
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
R3-2Zoning
2,724 sfGross Floor Area
2Units
0 Active Violations 2 old, status unconfirmed ▸
Two family frame · 2,575 sf lot · 1.06 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Boiler, HW Tank, Washer, Dryer Installation and Fixture Repl4p · 2 filings · 20 docs
Floor 1Interior renovation due to fire damage1 filing · 5 docs
CellarBoiler, HW Tank, Washer, Dryer Installation and Fixture Repl6p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/21/2018$650K—Private party → Private party$239/sf building
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Architect803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nationwide MechanicalPlumbing207/08/2026
Four Borough ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Arc-HI-Tech Associates6963411/30/2023
Building Lifecycle
06/21/2024
Closed: Illegal class a apartment created in cellar with inadequate ventilation, lighting and inadequate / legal secondary means of egress. These…
DOB violation · closed on the city's record
06/21/2024
Closed: Premise rendered non-compliant due to a fire from 2165 and fire fighting operations causing damage to roof,2ND floor entire rendering the premise…
DOB violation · closed on the city's record
05/06/2024
Signed off — Alteration
INSTALL 1 NEW BOILER, 1 NEW H.W.T., 1 NEW DRYER, AND 1 NEW WASHER IN THE CELLAR. REMOVE AND CAP SHOWER AT CELLAR. ALSO REPLACE EXISTING BATHROOMS & KITCHEN PLUMBING FIXTURES AS PER PLAN NO CHANGE IN USE, EGRESS, OR OCCUPANCY
X00822317-I1
01/30/2024
Signed off — Alteration
X00806653-I1
01/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
39 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNationwide Mechanical05/26/2023
DOB NOWPlumbingSigned-offNationwide Mechanical04/12/2023
DOB NOWGeneral ConstructionSigned-offFour Borough Construction04/07/2023
1 project · most recent 07/11/2024
General Wiring
FiledStatusContractorScope
07/11/2024Permit IssuedA & S Master ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
11/30/2023Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
11/30/2023Energy Code Compliance InspectionsIGOR LISOVENKOprogress
11/23/2023Energy Code Compliance InspectionsIGOR LISOVENKOprogress
11/23/2023Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
05/12/2023Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
05/12/2023Energy Code Compliance InspectionsIGOR LISOVENKOprogress
01/23/2023Energy Code Compliance InspectionsIGOR LISOVENKOprogress
01/23/2023Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
01/23/2023Fire-Resistance Rated ConstructionIGOR LISOVENKOprogress
01/03/2023FinalIGOR LISOVENKOprogress
20 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account