Fiorentino Plaza-1
2165 PITKIN AVENUE · BIN 3336981
💬 Discuss this project
1970Year Built
4Stories
C1Building Class
R7AZoning
35,180 sfGross Floor Area
30Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Over six families without stores · Owner of record: NYC Housing Authority · 20,000 sf lot · 1.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof71p · 6 filings · 20 docs
Floor 473p · 4 filings · 20 docs
Floor 373p · 4 filings · 20 docs
Floor 273p · 4 filings · 20 docs
Floor 1Curb cut installation81p · 8 filings · 20 docs
Cellar60p · 4 filings · 20 docs
Site & exteriorTemporary fence installation47p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority5307/08/2026
Boulevard Together Developer2603/22/2026
Capital Projects203/21/2026
Property Resources Group103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Peter Clements Architect1311/04/2025
EP Engineering907/02/2025
Ashraf412/09/2022
Joel Phagoo P.E311/11/2022
Bohler Engineering NY101/18/2022
M. Hamdi Gunal, PE, P110/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Betro Design Group2303/21/2026
Bohler Engineering NY203/21/2026
Rennon Construction803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.M.K. ContractingGeneral Contractor2107/08/2026
Rennon ConstructionScaffold603/21/2026
Thanasi ElectricalElectrical403/21/2026
Skyline RestorationScaffold403/21/2026
Royalton DevelopmentGeneral Contractor404/08/2026
Thanasi ElectricalGeneral Contractor403/22/2026
MNK EnterprisesScaffold303/21/2026
M & M Piping and HeatingPlumbing207/08/2026
Neelam ConstructionScaffold107/08/2026
Selectric Electrical Cont Co IElectrical103/21/2026
Interstate ElectricElectrical103/22/2026
Innovation PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Amaracon Testing & Inspec5842905/30/2025
EP Inspections and Commis70791305/30/2025
M. Hamdi Gunal, PE3000110/15/2021
Building Lifecycle
All (179)Filed (31)Permit Issued (26)Signed Off (12)Violation (21)Inspection (7)Objection (52)Special Inspection (30)
06/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/17/2026
Signed off — Alteration
REPLACE ALL EXISTING ROOF EXHAUST FANS, INSTALL NEW LOUVER AND CEILING EXHAUST FANS, INSTALL NEW RADIATOR COVERS AND REPLACE EXISTING GRILLE AS PER PLANS FILED.
B00539303-I1
12/05/2025
Signed off — Alteration
B00724496-S1
11/04/2025
Filed — Alteration CO
FILING TO AMEND CURRENT C of O TO CORRECT NUMBER OF PROPOSED PARKING SPACES TO EXSITING PARKING LOT AND TO CREATE A WASTE MANAGEMENT AREA AND FENCING AS INDICATED. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY TO EXISTING RESIDENTIAL BUILDING.
B00564023-P2
10/22/2025
Signed off — Alteration
INSTALL NEW CURB CUT (16' TOTAL LENGTH) FACING BRADFORD STREET AS PER PLANS FILED.
B01215821-I1
10/22/2025
Signed off — Alteration
INSTALL NEW CURB CUT (36' TOTAL LENGTH INCLUDING TWO 2'-6" SPLAYS) FACING BRADFORD STREET AS PER PLANS FILED.
B01215815-I1
10/09/2025
Signed off — Alteration
REPLACEMENT OF ALL FIXTURES THROUGHOUT WITHIN EXISTING ROUGHING AT FLOORS 1 THRU 4 AS PER PLANS FILED.
B00534858-I1
10/06/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/23/2025
Permit issued — Curb Cut
B01215821-I1-CC
09/23/2025
Permit issued — Curb Cut
B01215815-I1-CC
08/22/2025
Objection raised — Admin
08/22/2025
Objection resolved — Addressed
08/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/21/2025
Objection resolved — Addressed
08/19/2025
Objection raised — Admin
08/19/2025
Objection resolved — Addressed
08/18/2025
Objection raised — Other
07/31/2025
Objection resolved — Addressed
07/30/2025
Objection raised — Scope
07/29/2025
Objection resolved — Addressed
07/25/2025
Objection raised — Admin
07/22/2025
Permit issued — Plumbing
B00534858-I1-PL
07/15/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/02/2025
Filed — Alteration
REPLACEMENT OF ALL FIXTURES THROUGHOUT WITHIN EXISTING ROUGHING AT FLOORS 1 THRU 4 AS PER PLANS FILED.
B00534858-P4
06/24/2025
Signed off — Alteration
B00595655-I1
06/20/2025
Signed off — Alteration
ROOF AND PARAPET RECONSTRUCTRION, WINDOW REPLACEMENT, WINDOW LINTEL WHERE DAMAGED OR DETERIORATED, BRICK POINTING AND REPLACEMENT WHERE CRACKED OR DAMAGED AND FIRE ESCAPE REPAIR / RECONSTRUCTION WHERE DAMAGED OR DETERIORATED AS PER PLANS FILED.
B00527262-I1
06/14/2025
Signed off — Alteration
B00355455-I1
06/12/2025
Signed off — Alteration
B08018788-I1
05/30/2025
Filed — Alteration
ROOF AND PARAPET RECONSTRUCTRION, WINDOW REPLACEMENT, WINDOW LINTEL WHERE DAMAGED OR DETERIORATED, BRICK POINTING AND REPLACEMENT WHERE CRACKED OR DAMAGED AND FIRE ESCAPE REPAIR / RECONSTRUCTION WHERE DAMAGED OR DETERIORATED AS PER PLANS FILED.
B00527262-P3
05/19/2025
Special inspection requirement — Masonry
CONNIE PISANI
05/19/2025
Special inspection requirement — Insulation placement and R values
Christopher Burgess
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
05/19/2025
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
05/19/2025
Special inspection requirement — Final
Christopher Burgess
05/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
05/09/2025
Objection raised — Zoning
05/09/2025
Objection raised — Zoning
05/08/2025
Objection raised — Admin
05/07/2025
Violation issued (HPD, closed)
A
05/07/2025
Violation issued (HPD, closed)
C
05/05/2025
Permit issued — Mechanical Systems
B00539303-I1-MS
04/28/2025
Filed — Alteration
INSTALL NEW CURB CUT (16' TOTAL LENGTH) FACING BRADFORD STREET AS PER PLANS FILED.
B01215821-I1
04/28/2025
Filed — Alteration
INSTALL NEW CURB CUT (36' TOTAL LENGTH INCLUDING TWO 2'-6" SPLAYS) FACING BRADFORD STREET AS PER PLANS FILED.
B01215815-I1
04/21/2025
Objection resolved — Addressed
04/21/2025
Objection resolved — Addressed
04/21/2025
Objection resolved — Addressed
03/20/2025
Signed off — Alteration
REMOVAL & INSTALL ALL WALL, FLOOR FINISHES, LINTELS, KITCHEN APPLIANCES & CABINETS, DOORS & FRAMES TO BE DEMOLISHED & REPLACED. PROVIDE & INSTALL NEW METAL LADDER & SECURE TO EXISTING CONCRETE AREAWAY WALL AS PER PLANS FILED.
B00741150-I1
03/12/2025
Objection raised — Structural
03/12/2025
Objection raised — Zoning
03/12/2025
Objection raised — Structural
03/12/2025
Objection raised — Scope
03/06/2025
Filed — Alteration CO
FILING TO AMEND CURRENT C of O TO CORRECT NUMBER OF PROPOSED PARKING SPACES TO EXSITING PARKING LOT AND TO CREATE A WASTE MANAGEMENT AREA AND FENCING AS INDICATED. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY TO EXISTING RESIDENTIAL BUILDING.
B00564023-P1
01/09/2025
Permit issued — General Construction
B00741150-I1-GC
10/14/2024
Signed off — Alteration
B00724496-I1
08/07/2024
Permit issued — Structural
B00595655-I1-ST
07/09/2024
Permit issued — Structural
B00527262-I1-ST
Latest 60 of 179 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offRoyalton Development09/23/2025
DOB NOWCurb CutSigned-offRoyalton Development09/23/2025
DOB NOWPlumbingSigned-offM & M Piping and Heating07/22/2025
DOB NOWMechanical SystemsSigned-offA.M.K. Contracting05/05/2025
DOB NOWGeneral ConstructionSigned-offA.M.K. Contracting01/09/2025
DOB NOWStructuralSigned-offA.M.K. Contracting08/07/2024
DOB NOWStructuralSigned-offA.M.K. Contracting07/09/2024
DOB NOWGeneral ConstructionSigned-offA.M.K. Contracting07/09/2024
DOB NOWGeneral ConstructionPermit IssuedA.M.K. Contracting06/11/2024
DOB NOWPlumbingSigned-offM & M Piping and Heating04/29/2024
DOB NOWSupported ScaffoldSigned-offRennon Construction03/19/2024
DOB NOWPlumbingSigned-offInnovation Plumbing02/08/2024
DOB NOWMechanical SystemsSigned-offA.M.K. Contracting01/24/2024
DOB NOWGeneral ConstructionSigned-offA.M.K. Contracting01/11/2024
DOB NOWStructuralSigned-offA.M.K. Contracting08/16/2023
DOB NOWGeneral ConstructionSigned-offA.M.K. Contracting07/13/2023
DOB NOWStructuralSigned-offA.M.K. Contracting07/12/2023
DOB NOWConstruction FenceSigned-offSkyline Restoration02/16/2023
DOB NOWConstruction FenceSigned-offSkyline Restoration11/14/2022
DOB NOWProtection and Mechanical MethodsSigned-offRennon Construction11/09/2022
DOB NOWSidewalk ShedSigned-offMNK Enterprises10/14/2022
DOB NOWStructuralSigned-offA.M.K. Contracting08/18/2022
DOB NOWGeneral ConstructionSigned-offA.M.K. Contracting08/17/2022
DOB NOWStructuralSigned-offA.M.K. Contracting08/17/2022
DOB NOWSupported ScaffoldSigned-offRennon Construction04/28/2022
DOB NOWConstruction FenceSigned-offNeelam Construction06/12/2020
BISEQISSUEDSkyworx Contracting05/03/2022
BISOTISSUEDRocon03/23/2021
BISEQISSUEDSkyworx Contracting03/19/2021
BISPLISSUEDRocon11/16/2020
BISOTISSUEDRocon03/18/2020
BISEQISSUEDSkyworx Contracting02/26/2020
BISPLISSUEDRocon11/19/2019
BISOTISSUEDRocon11/19/2019
BISEQISSUEDSkyworx Contracting03/04/2019
BISEQISSUEDSkyworx Contracting03/08/2018
BISEQISSUEDSkyworx Contracting03/07/2017
BISPLISSUEDNeptune Mechanical10/01/2012
BISPLISSUEDNeptune Mechanical04/27/2011
5 projects · most recent 11/26/2024
General Wiring Lighting
FiledStatusContractorScope
11/26/2024Permit IssuedInterstate Electric—
02/08/2023CompleteThanasi ElectricalGeneral Wiring
05/13/2021Permit IssuedAmin Electrical—
06/25/2019CompleteTru-Val ElectricGeneral Wiring, Lighting
01/10/2019CompleteGilston Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/06/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/12/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/08/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/03/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
05/19/2025Insulation placement and R valuesChristopher Burgessenergy_progress
05/19/2025FinalChristopher Burgessprogress
05/19/2025Energy Code Compliance InspectionsChristopher Burgessprogress
05/19/2025Structural Steel - DetailsCONNIE PISANIspecial
05/19/2025Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
05/19/2025MasonryCONNIE PISANIspecial
05/19/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
02/26/2024Insulation placement and R valuesChristopher Burgessenergy_progress
02/26/2024Fire-Resistant Penetrations and JointsChristopher Burgessspecial
02/26/2024Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
02/26/2024Energy Code Compliance InspectionsChristopher Burgessprogress
02/26/2024FinalChristopher Burgessprogress
02/26/2024Lighting in dwelling unitsChristopher Burgessenergy_progress
02/15/2024HVAC-R and service water piping design and insulationChristopher Burgessenergy_progress
02/15/2024Shutoff dampersChristopher Burgessenergy_progress
02/15/2024Fire-Resistant Penetrations and JointsChristopher Burgessspecial
02/15/2024Mechanical SystemsChristopher Burgessspecial
02/15/2024Energy Code Compliance InspectionsChristopher Burgessprogress
02/15/2024FinalChristopher Burgessprogress
02/15/2024Maintenance informationChristopher Burgessenergy_progress
02/15/2024HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
02/15/2024HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
02/15/2024Duct leakage testing, insulation and designChristopher Burgessenergy_progress
01/26/2024Maintenance informationChristopher Burgessenergy_progress
01/26/2024Duct leakage testing, insulation and designChristopher Burgessenergy_progress
Latest 25 of 75.
▾Documents — 245 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch30
09/01/2026B00527262-P1Request digital key ↗
09/01/2026B00527262-P3Request digital key ↗
09/01/2026B00595655-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00355455-I1Request digital key ↗
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION15
01/20/2022340760778Open ↗
01/20/2022340760769Open ↗
12/03/2020340760769Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION10
05/07/2022340479084Open ↗
03/22/2021340479084Open ↗
03/21/2020321820026Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/13/2019321820026Open ↗
▸Seals & Professional Certifications83
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/01/2026B00527262-P2Open ↗
09/01/2026B00527262-I1Open ↗
09/01/2026B00527262-P1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/02/2026B00741150-I1Open ↗
09/02/2026B00741150-I1Open ↗
08/30/2026B00741150-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026B00741150-I1Open ↗
09/02/2026B00741150-I1Open ↗
08/30/2026B00741150-P1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
03/13/2020321820026Open ↗
11/19/2019321820026Open ↗
10/18/2018321820026Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
09/01/2020340760769Open ↗
08/31/2020340760778Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/06/2017340479084Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/06/2017340479084Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/27/2011320301197Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/06/2017340479084Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/27/2011320301197Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING5
10/23/2020321820026Open ↗
09/21/2020321820026Open ↗
08/17/2020321820026Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/08/2018321820026Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
10/16/2012320301197Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
10/16/2012320301197Open ↗
▸Safety & Tenant Protection9
▸BISTENANT PROTECTION PLAN AND NOTES4
09/01/2020340760769Open ↗
08/31/2020340760778Open ↗
03/06/2017340479084Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Checklist3
08/20/2026B00564023-I1Open ↗
08/20/2026B00564023-P2Open ↗
08/15/2026B00564023-P1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/07/2020340760778Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00355455-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/01/2026B00595655-I1Open ↗
08/27/2026B00534858-I1Open ↗
08/27/2026B00539303-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/28/2011320301197Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/30/2021321820026Open ↗
09/01/2020340760769Open ↗
08/31/2020340760778Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
08/27/2026B00539303-I1Open ↗
08/13/2026B00527262-I1Open ↗
08/13/2026B00741150-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/19/2019321820026Open ↗
08/08/2018321820026Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/30/2021321820026Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY7
03/30/2021321820026Open ↗
12/01/2020340760769Open ↗
10/19/2020340760769Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
05/21/2021321820026Open ↗
09/25/2019321820026Open ↗
▸Approvals, Objections & Sign-offs42
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter25
09/01/2026B00527262-P1Open ↗
09/01/2026B00527262-P3Open ↗
09/01/2026B00595655-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/27/2026B00539303-P2Open ↗
08/27/2026B00539303-I1Open ↗
08/13/2026B00527262-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/27/2026B00539303-I1Open ↗
08/13/2026B00564023-I1Open ↗
08/13/2026B00595655-I1Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/27/2011320301197Open ↗
04/27/2011320301197Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/21/2021321820026Open ↗
02/11/2013320301197Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/27/2011320301197Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT5
09/01/2020340760769Open ↗
08/31/2020340760778Open ↗
08/08/2018321820026Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/18/2021321820026Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION6
12/01/2020340760769Open ↗
10/19/2020340760769Open ↗
10/07/2020340760778Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/01/2020340760769Open ↗
08/31/2020340760778Open ↗
03/06/2017340479084Open ↗
▸BISEFILING COVER SHEET2
08/08/2018321820026Open ↗
04/27/2011320301197Open ↗
▸BISBOROUGH INTAKE FORM1
03/22/2021340479084Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00527262-P3Open ↗
08/13/2026B00527262-P1Open ↗
08/13/2026B00527262-P2Open ↗
Showing 3 of 4 on file for this type