← Back
Bungalow colony - cooperatively owned land
217-02 BREEZY POINT BLVD
QUEENS · BIN 4465800
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered60 Open Violations 2 unresolved · 58 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 12,253,428 sf lot · 0.13 FAR built · Flood zone X500
Locations of Work
Architecture
Roof2p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.1807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NORMAN C. LOK, PE611/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NORTHEAST EXPEDITING LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMERSON BROTHERS LLCGeneral Contractor603/21/2026
JOSEPH O'GRADY P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818311/09/2023
Building Lifecycle
All (49)Filed (6)Permit Issued (3)Signed Off (3)Violation (1)Inspection (6)Objection (30)
11/30/2023
Signed off — Alteration
Vertical enlargement of single family dwelling.
Q00517922-I1
11/09/2023
Filed — Alteration
Vertical enlargement of single family dwelling.
Q00517922-P2
08/15/2022
Filed — Alteration
Vertical enlargement of single family dwelling.
Q00517922-P1
07/18/2022
Signed off — Alteration
Construction fence
Q00517925-I1
07/15/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
07/14/2022
Signed off — Alteration
Plumbing associated with enlargement of single family dwelling.
Q00517924-I1
07/10/2022
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
07/08/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/28/2022
Filed — Alteration
Plumbing associated with enlargement of single family dwelling.
Q00517924-P1
04/01/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/01/2022
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
04/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/01/2022
Violation issued (ECB, closed)
Construction
11/03/2021
Permit issued — Plumbing
Q00517924-I1-PL
10/28/2021
Permit issued — Construction Fence
Q00517925-I1-FN
10/12/2021
Permit issued — General Construction
Q00517922-I1-GC
08/23/2021
Filed — Alteration
Construction fence
Q00517925-I1
08/11/2021
Objection raised — Scope
08/11/2021
Objection resolved — Addressed
08/09/2021
Objection raised — Structural
08/09/2021
Objection resolved — Addressed
08/09/2021
Objection raised — Structural
08/09/2021
Objection resolved — Addressed
08/05/2021
Objection raised — Structural
08/05/2021
Objection resolved — Addressed
08/04/2021
Filed — Alteration
Plumbing associated with enlargement of single family dwelling.
Q00517924-I1
07/02/2021
Objection raised — Zoning
07/02/2021
Objection resolved — Addressed
07/02/2021
Objection raised — Scope
07/02/2021
Objection resolved — Addressed
07/02/2021
Objection raised — Structural
07/02/2021
Objection resolved — Addressed
07/02/2021
Objection raised — Admin
07/02/2021
Objection resolved — Addressed
07/02/2021
Objection raised — Zoning
07/02/2021
Objection resolved — Addressed
07/02/2021
Objection raised — Zoning
07/02/2021
Objection resolved — Addressed
07/02/2021
Objection raised — Structural
07/02/2021
Objection resolved — Addressed
07/02/2021
Objection raised — Zoning
07/02/2021
Objection resolved — Addressed
07/02/2021
Objection raised — Zoning
07/02/2021
Objection resolved — Addressed
07/02/2021
Objection raised — Zoning
07/02/2021
Objection resolved — Addressed
07/02/2021
Objection raised — Zoning
07/02/2021
Objection resolved — Addressed
06/20/2021
Filed — Alteration
Vertical enlargement of single family dwelling.
Q00517922-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOSEPH O'GRADY P & H INC11/03/2021
DOB NOWConstruction FenceSigned-offEMERSON BROTHERS LLC10/28/2021
DOB NOWGeneral ConstructionSigned-offEMERSON BROTHERS LLC10/12/2021
1 project · most recent 11/07/2022
General Wiring
FiledStatusContractorScope
11/07/2022CompleteDANIEL T. O'LEARYGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/15/2022Pass-Final Fence Non-Directive 14PassView ↗
07/10/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
07/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/01/2022Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
04/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
11/29/2023Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)NORMAN LOKspecial
11/29/2023Fire-Resistant Penetrations and JointsNORMAN LOKspecial
11/29/2023Structural Stability – Alterations of existing buildingsNORMAN LOKspecial
11/29/2023FinalMOHAMMAD AHEADprogress
11/29/2023Permanent certificateNORMAN LOKenergy_progress
11/29/2023Maintenance informationNORMAN LOKenergy_progress
11/29/2023Fenestration air leakageNORMAN LOKenergy_progress
11/29/2023Fenestration areasNORMAN LOKenergy_progress
11/29/2023Insulation placement and R valuesNORMAN LOKenergy_progress
11/29/2023Air barrier - visual inspectionNORMAN LOKenergy_progress
11/29/2023Fenestration and door U-factor and product ratingsNORMAN LOKenergy_progress
11/06/2023Fire-Resistant Penetrations and JointsNORMAN LOKspecial
11/06/2023Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)NORMAN LOKspecial
11/06/2023Structural Stability – Alterations of existing buildingsNORMAN LOKspecial
11/06/2023FinalMOHAMMAD AHEADprogress
11/06/2023Permanent certificateNORMAN LOKenergy_progress
11/06/2023Fenestration and door U-factor and product ratingsNORMAN LOKenergy_progress
11/06/2023Insulation placement and R valuesNORMAN LOKenergy_progress
11/06/2023Fenestration air leakageNORMAN LOKenergy_progress
11/06/2023Maintenance informationNORMAN LOKenergy_progress
11/06/2023Fenestration areasNORMAN LOKenergy_progress
11/06/2023Air barrier - visual inspectionNORMAN LOKenergy_progress
08/12/2022Fire-Resistant Penetrations and JointsNORMAN LOKspecial
08/12/2022Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)NORMAN LOKspecial
08/12/2022Structural Stability – Alterations of existing buildingsNORMAN LOKspecial
Latest 25 of 32.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00517925-I1Request digital key ↗
08/26/2026Q00517924-P1Request digital key ↗
08/23/2026Q00517922-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00517922-P1Open ↗
08/13/2026Q00517922-I1Open ↗
08/13/2026Q00517922-P2Open ↗
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature23
09/01/2026Q00517922-I1Open ↗
09/01/2026Q00517922-I1Open ↗
09/01/2026Q00517922-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026Q00517922-I1Open ↗
09/01/2026Q00517922-I1Open ↗
09/01/2026Q00517922-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00517925-I1Open ↗
08/26/2026Q00517924-P1Open ↗
08/26/2026Q00517924-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026Q00517924-P1Open ↗
08/15/2026Q00517924-I1Open ↗
08/13/2026Q00517922-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWACP5/20/21 or V51
08/13/2026Q00517922-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00517922-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWHydraulic Flow Calculations2
08/13/2026Q00517924-P1Open ↗
08/13/2026Q00517924-I1Open ↗
▸DOB NOWHydrant Flow Test Letter2
08/26/2026Q00517924-P1Open ↗
08/15/2026Q00517924-I1Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial3
08/13/2026Q00517922-P1Open ↗
08/13/2026Q00517922-P2Open ↗
08/13/2026Q00517922-I1Open ↗
▸DOB NOWPD1 Document3
08/13/2026Q00517922-P2Open ↗
08/13/2026Q00517922-I1Open ↗
08/13/2026Q00517922-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00517922-P2Open ↗
08/13/2026Q00517922-P1Open ↗
08/13/2026Q00517922-I1Open ↗
▸DOB NOWSURVEY: INITIAL3
08/13/2026Q00517922-P1Open ↗
08/13/2026Q00517922-P2Open ↗
08/13/2026Q00517922-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00517922-P2Open ↗
08/13/2026Q00517922-P1Open ↗
08/13/2026Q00517922-I1Open ↗