Bungalow colony - cooperatively owned land
217-02 BREEZY POINT BLVD
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered60 Open Violations 2 unresolved · 58 paperwork only ▸
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 12,253,428 sf lot · 0.13 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC111/25/2024
BUNGALOW DESIGN & ENGINEERING PC105/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272111/25/2024
BUNGALOW DESIGN & ENGINEE4105105/23/2023
Building Lifecycle
All (17)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (13)
03/10/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01147394-I1
11/29/2024
Permit issued — Solar
Q01147394-I1-SL
11/25/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01147394-I1
11/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/25/2024
Special inspection requirement — Final
Walid Abdulla
11/25/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/23/2023
Filed — New Building
New structural work associated with NB Q00643745 including wood framing.
Q00643745-P4
05/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Deidre Duffy
05/22/2023
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
Deidre Duffy
05/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Deidre Duffy
05/22/2023
Special inspection requirement — Maintenance information
Deidre Duffy
05/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Deidre Duffy
05/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
Deidre Duffy
05/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
Deidre Duffy
05/22/2023
Special inspection requirement — Permanent certificate
Deidre Duffy
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC11/29/2024
1 project · most recent 05/23/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/23/2023Signed-offSAND-BAR CONTRACTORS INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Trane TRANE 4TTR3036H 3 tons · Condensing Unit ×2
Heating
Navien NAVIEN NCB 240/130H 120,000 BTU · Boiler ×1
Ventilation
Broan HE SERIES 200 CFM · Erv ×1
1 project · most recent 05/23/2023
Sprinkler System
FiledStatusContractorScope
05/23/2023——Sprinkler System
1 project · most recent 05/23/2023
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
05/23/2023Signed-offJOSEPH O'GRADY P & H INCGas, Plumbing-Sprinkler, Water/Sanitary
1 project · most recent 11/25/2024
FiledStatusContractorScope
11/25/2024CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 05/23/2023
Wood
FiledStatusContractorScope
05/23/2023Signed-offSAND-BAR CONTRACTORS INCWood
1 project · most recent 05/23/2023
Earthwork
FiledStatusContractorScope
05/23/2023Signed-offSAND-BAR CONTRACTORS INCEarthwork
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
11/25/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/25/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/25/2024Energy Code Compliance InspectionsWalid Abdullaprogress
11/25/2024FinalWalid Abdullaprogress
11/25/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
05/22/2023Fire-Resistant Penetrations and JointsDeidre Duffyspecial
05/22/2023On-Site Private Sewage Disposal Systems InstallationDeidre Duffyspecial
05/22/2023Energy Code Compliance InspectionsDeidre Duffyprogress
05/22/2023Maintenance informationDeidre Duffyenergy_progress
05/22/2023HVAC-R and service water piping design and insulationDeidre Duffyenergy_progress
05/22/2023HVAC-R and service water heating equipmentDeidre Duffyenergy_progress
05/22/2023HVAC-R and service water heating system controlsDeidre Duffyenergy_progress
05/22/2023Permanent certificateDeidre Duffyenergy_progress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01147394-I1Request digital key ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026Q00643745-P2Open ↗
09/02/2026Q01147394-I1Open ↗
09/02/2026Q01147394-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026Q00643745-P2Open ↗
09/02/2026Q01147394-I1Open ↗
09/02/2026Q01147394-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01147394-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01147394-I1Open ↗