1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered60 Open Violations 2 unresolved · 58 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 12,253,428 sf lot · 0.13 FAR built · Flood zone AE
Locations of Work
Architecture
Floor 181p · 1 filing · 18 docs
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.1803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC210/24/2024
CMC DESIGN ARCHITECT, P.C.207/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AC BUILDING CONSULTANTS, INC.203/21/2026
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
JOSEPH O'GRADY P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272210/24/2024
CMC DESIGN ARCHITECT, P.C2984207/01/2021
Building Lifecycle
All (30)Filed (4)Permit Issued (2)Signed Off (2)Special Inspection (22)
08/07/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01121503-I1
10/25/2024
Permit issued — Solar
Q01121503-I1-SL
10/24/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01121503-P1
10/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/24/2024
Special inspection requirement — Final
Walid Abdulla
10/24/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/24/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/24/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Walid Abdulla
10/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/22/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/22/2024
Special inspection requirement — Final
Walid Abdulla
10/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/22/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Walid Abdulla
10/04/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01121503-I1
11/13/2023
Signed off — Alteration
Installation of water service piping. Installation of gas piping, gas meter and gas fixtures. Installation of water & sanitary piping and plumbing fixtures. Installation of two floor drains. Installation of twelve sprinkler heads.
Q00245632-I1
07/13/2021
Special inspection requirement — HVAC and service water heating equipment
Gary Lenhart
07/13/2021
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
Gary Lenhart
07/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Lenhart
07/13/2021
Special inspection requirement — HVAC and service water heating system controls
Gary Lenhart
07/13/2021
Special inspection requirement — HVAC insulation and sealing
Gary Lenhart
07/01/2021
Filed — Alteration
Installation of water service piping. Installation of gas piping, gas meter and gas fixtures. Installation of water & sanitary piping and plumbing fixtures. Installation of two floor drains. Installation of twelve sprinkler heads.
Q00245632-P1
06/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Lenhart
06/14/2021
Special inspection requirement — HVAC and service water heating system controls
Gary Lenhart
06/14/2021
Special inspection requirement — HVAC and service water heating equipment
Gary Lenhart
06/14/2021
Special inspection requirement — HVAC insulation and sealing
Gary Lenhart
06/14/2021
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
Gary Lenhart
11/25/2020
Permit issued — Plumbing
Q00245632-I1-PL
05/22/2020
Filed — Alteration
Installation of water service piping. Installation of gas piping, gas meter and gas fixtures. Installation of water & sanitary piping and plumbing fixtures. Installation of two floor drains. Installation of twelve sprinkler heads.
Q00245632-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/25/2024
DOB NOWPlumbingSigned-offJOSEPH O'GRADY P & H INC11/25/2020
BIS—ISSUEDMALBRO CONST SERVICES INC04/25/2022
BIS—ISSUEDMALBRO CONST SERVICES INC08/17/2021
BIS—ISSUEDMALBRO CONST SERVICES INC04/19/2021
BIS—ISSUEDMALBRO CONST SERVICES INC04/19/2021
BIS—ISSUEDMALBRO CONST SERVICES INC09/24/2020
BIS—ISSUEDMALBRO CONST SERVICES INC09/24/2020
BIS—ISSUEDMALBRO CONST SERVICES INC06/23/2020
BIS—ISSUEDMALBRO CONST SERVICES INC06/23/2020
2 projects · most recent 10/04/2024
General Wiring
FiledStatusContractorScope
10/04/2024CompleteSUNRUN SOLAR ELECTL CORP—
11/12/2020CompletePAPPAS & FODERA ELECT'LGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
10/24/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/24/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/24/2024FinalWalid Abdullaprogress
10/24/2024Energy Code Compliance InspectionsWalid Abdullaprogress
10/24/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
10/24/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Walid Abdullaspecial
10/22/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/22/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
10/22/2024FinalWalid Abdullaprogress
10/22/2024Energy Code Compliance InspectionsWalid Abdullaprogress
10/22/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/22/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Walid Abdullaspecial
07/13/2021HVAC and service water heating equipment Gary Lenhartenergy_progress
07/13/2021On-Site Private Sewage Disposal Systems InstallationGary Lenhartspecial
07/13/2021Fire-Resistant Penetrations and JointsGary Lenhartspecial
07/13/2021HVAC and service water heating system controls Gary Lenhartenergy_progress
07/13/2021HVAC insulation and sealing Gary Lenhartenergy_progress
06/14/2021Fire-Resistant Penetrations and JointsGary Lenhartspecial
06/14/2021HVAC and service water heating system controls Gary Lenhartenergy_progress
06/14/2021HVAC and service water heating equipment Gary Lenhartenergy_progress
06/14/2021HVAC insulation and sealing Gary Lenhartenergy_progress
06/14/2021On-Site Private Sewage Disposal Systems InstallationGary Lenhartspecial
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026Q00245632-I1Request digital key ↗
08/15/2026Q00245632-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/21/2026Q01121503-P1Request digital key ↗
08/21/2026Q01121503-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION4
05/06/2025421910187Open ↗
11/08/2023421910187Open ↗
07/02/2021421910187Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
07/13/2020421910187Open ↗
07/13/2020421910187Open ↗
07/13/2020421910187Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
12/13/2022421910187Open ↗
03/17/2021421910187Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISVERIFY TAX LOT1
01/24/2022421910187Open ↗
▸BISFLOOD ZONE COMPLIANCE1
09/19/2023421910187Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/17/2021421910187Open ↗
▸BISZONING DIAGRAM1
02/25/2020421910187Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026Q00245632-P1Open ↗
08/31/2026Q00245632-P1Open ↗
08/31/2026Q00245632-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/31/2026Q00245632-P1Open ↗
08/31/2026Q00245632-P1Open ↗
08/26/2026Q01121503-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
07/13/2020421910187Open ↗
07/13/2020421910187Open ↗
02/10/2020421910187Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026Q01121503-I1Open ↗
08/13/2026Q00245632-I1Open ↗
08/13/2026Q00245632-P1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWFDNY: Letter of No Objection2
08/13/2026Q00245632-I1Open ↗
08/13/2026Q00245632-P1Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
09/19/2023421910187Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
09/19/2023421910187Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/01/2025421910187Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/04/2019421910187Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
09/09/2022421910187Open ↗
01/24/2022421910187Open ↗
01/03/2022421910187Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/13/2020421910187Open ↗
07/13/2020421910187Open ↗
10/04/2019421910187Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/19/2023421910187Open ↗
▸BISINTERIOR LIGHTING POWER1
09/19/2023421910187Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/03/2022421910187Open ↗
▸BIS* SOLAR READY REQUIREMENTS1
10/17/2023421910187Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/19/2023421910187Open ↗
▸BISFENESTRATION AREAS1
09/19/2023421910187Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
09/19/2023421910187Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
09/19/2023421910187Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/19/2023421910187Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/25/2025421910187Open ↗
▸BIS* HVAC INSULATION AND SEALING1
09/19/2023421910187Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
09/19/2023421910187Open ↗
▸BISFENESTRATION AIR LEAKAGE1
09/19/2023421910187Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY5
09/19/2023421910187Open ↗
01/24/2022421910187Open ↗
01/03/2022421910187Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
07/13/2020421910187Open ↗
06/17/2020421910187Open ↗
06/16/2020421910187Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
07/13/2020421910187Open ↗
06/17/2020421910187Open ↗
06/16/2020421910187Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
10/14/2025421910187Open ↗
10/14/2022421910187Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/19/2023421910187Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/19/2023421910187Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
09/19/2023421910187Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
09/19/2023421910187Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
02/10/2020421910187Open ↗
▸BISMECHANICAL SYSTEMS1
09/19/2023421910187Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
09/19/2023421910187Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/19/2023421910187Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSCHEDULE A - OCCUPANCY / USE1
10/04/2019421910187Open ↗
▸BISS I SEPTIC APPROVAL1
09/29/2022421910187Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
10/10/2025421910187Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01121503-I1Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION9
10/31/2023421910187Open ↗
08/25/2023421910187Open ↗
09/29/2022421910187Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET1
10/04/2019421910187Open ↗
▸BISBOROUGH INTAKE FORM1
07/13/2020421910187Open ↗
▸Other Documents12
▸BISPLOT DIAGRAM2
03/17/2021421910187Open ↗
10/04/2019421910187Open ↗
▸BISSHUTOFF DAMPERS1
09/19/2023421910187Open ↗
▸BISLOWEST FLOOR ELEVATION1
09/19/2023421910187Open ↗
▸BISMAINTENANCE INFORMATION1
09/19/2023421910187Open ↗
▸BISPERMANENT CERTIFICATE1
09/19/2023421910187Open ↗
▸BISON-SITE PRIVATE SEWAGE DISPOSAL SYSTEMS INSTALLATION1
09/19/2023421910187Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/13/2020421910187Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
10/04/2022421910187Open ↗
▸BISWOOD - PREFABRICATED I-JOISTS1
09/19/2023421910187Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q00245632-I1Open ↗
▸DOB NOWLowest Floor Elevation Plan1
08/27/2026Q00245632-I1Open ↗