← Back
Bungalow colony - cooperatively owned land
217-02 BREEZY POINT BLVD
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered60 Open Violations 2 unresolved · 58 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 12,253,428 sf lot · 0.13 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY D. SACHS, PE109/10/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPOWER CES LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PACIFICO ENGINEERING PC3157109/10/2025
Building Lifecycle
All (15)Filed (1)Permit Issued (2)Signed Off (1)Objection (6)Special Inspection (5)
03/16/2026
Signed off — Alteration
Installation of roof mounted solar panels. No change in use, egress or occupancy
Q01284631-I1
10/20/2025
Permit issued — Solar
Q01284631-I1-SL
10/14/2025
Permit issued — Solar
Q01284631-I1-SL
09/25/2025
Objection raised — Admin
09/25/2025
Objection resolved — Addressed
09/25/2025
Objection raised — Admin
09/25/2025
Objection resolved — Addressed
09/25/2025
Objection raised — Admin
09/25/2025
Objection resolved — Addressed
09/10/2025
Filed — Alteration
Installation of roof mounted solar panels. No change in use, egress or occupancy
Q01284631-I1
09/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
09/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Pacifico
09/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
09/09/2025
Special inspection requirement — Final
Ralph Pacifico
09/09/2025
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offEMPOWER CES LLC10/20/2025
DOB NOWSolarSigned-offGREGORY D. SACHS, PE10/14/2025
1 project · most recent 08/15/2025
FiledStatusContractorScope
08/15/2025CompleteHIGH QUALITY ELEC.OF NYC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/09/2025Fire-Resistant Penetrations and JointsRalph Pacificospecial
09/09/2025Structural Stability – Alterations of existing buildingsRalph Pacificospecial
09/09/2025Energy Code Compliance InspectionsRalph Pacificoprogress
09/09/2025FinalRalph Pacificoprogress
09/09/2025Air barrier - visual inspectionRalph Pacificoenergy_progress
▾Documents — 5 on file (BIS + DOB NOW)
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026Q01284631-I1Open ↗
09/02/2026Q01284631-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q01284631-I1Open ↗
09/02/2026Q01284631-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01284631-I1Open ↗