Bungalow colony - cooperatively owned land
217-02 BREEZY POINT BLVD
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered60 Open Violations 2 unresolved · 58 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 12,253,428 sf lot · 0.13 FAR built · Flood zone AE
Locations of Work
ArchitecturePlumbingGeneral
Roof3p · 1 filing · 19 docs
Floor 21p · 1 filing · 19 docs
Floor 1
Cellar1p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NORMAN C. LOK, PE405/10/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NORTHEAST EXPEDITING LLC303/21/2026
Building Lifecycle
All (56)Filed (4)Objection (22)Special Inspection (30)
05/20/2026
Objection raised — Other
05/20/2026
Objection raised — Other
05/10/2026
Filed — New Building
PROPOSED SINGLE FAMILY DWELLING
Q00964816-P1
05/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/02/2026
Special inspection requirement — Concrete - Cast-In-Place
05/02/2026
Special inspection requirement — Metering
05/02/2026
Special inspection requirement — Air barrier - visual inspection
05/02/2026
Special inspection requirement — Permanent certificate
05/02/2026
Special inspection requirement — Maintenance information
05/02/2026
Special inspection requirement — Fenestration areas
05/02/2026
Special inspection requirement — Air barrier — testing
05/02/2026
Special inspection requirement — Fenestration air leakage
05/02/2026
Special inspection requirement — Lighting in dwelling units
05/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/02/2026
Special inspection requirement — Electric vehicle service equipment requirements
05/02/2026
Special inspection requirement — Insulation placement and R values
05/02/2026
Special inspection requirement — Structural Wood Frame
05/02/2026
Special inspection requirement — Lowest Floor Elevation
05/02/2026
Special inspection requirement — Footing and Foundation
05/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/02/2026
Special inspection requirement — Final
05/02/2026
Special inspection requirement — Energy Code Compliance Inspections
05/02/2026
Special inspection requirement — Wood – Prefabricated I-Joists
05/02/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/02/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
05/02/2026
Special inspection requirement — Subgrade Inspections
07/29/2025
Objection resolved — Addressed
06/23/2025
Objection raised — Other
05/29/2025
Objection resolved — Addressed
05/15/2025
Objection raised — Other
05/15/2025
Objection resolved — Addressed
05/14/2025
Objection resolved — Addressed
05/13/2025
Objection raised — Other
05/13/2025
Objection resolved — Addressed
05/12/2025
Objection resolved — Addressed
05/12/2025
Objection resolved — Addressed
05/12/2025
Objection resolved — Addressed
05/12/2025
Objection resolved — Addressed
05/07/2025
Objection raised — Other
05/07/2025
Objection raised — Other
05/07/2025
Objection raised — Other
05/07/2025
Objection raised — Other
05/07/2025
Objection raised — Other
04/18/2025
Objection resolved — Addressed
09/23/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
12/20/2023
Objection raised — Other
12/20/2023
Objection raised — Other
12/15/2023
Filed — New Building
PROPOSED SINGLE FAMILY DWELLING
Q00964816-I1
12/15/2023
Filed — New Building
PROPOSED SINGLE FAMILY DWELLING
Q00964816-S2
12/15/2023
Filed — New Building
PROPOSED SINGLE FAMILY DWELLING
Q00964816-S1
11/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/19/2023
Special inspection requirement — Concrete - Cast-In-Place
11/19/2023
Special inspection requirement — Metering
11/19/2023
Special inspection requirement — Permanent certificate
11/19/2023
Special inspection requirement — Maintenance information
11/19/2023
Special inspection requirement — Fenestration air leakage
Nothing on file for this building.
1 project · most recent 05/10/2026
Sprinkler System
FiledStatusContractorScope
05/10/2026——Sprinkler System
1 project · most recent 05/10/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
05/10/2026——Gas, Plumbing-Sprinkler, Water/Sanitary
1 project · most recent 05/10/2026
Wood
FiledStatusContractorScope
05/10/2026——Wood
1 project · most recent 05/10/2026
Fence
FiledStatusContractorScope
05/10/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
05/02/2026Fire-Resistant Penetrations and Joints—special
05/02/2026Concrete - Cast-In-Place—special
05/02/2026Metering—energy_progress
05/02/2026Air barrier - visual inspection—energy_progress
05/02/2026Permanent certificate—energy_progress
05/02/2026Maintenance information—energy_progress
05/02/2026Fenestration areas—energy_progress
05/02/2026Air barrier — testing —energy_progress
05/02/2026Fenestration air leakage—energy_progress
05/02/2026Lighting in dwelling units—energy_progress
05/02/2026Fenestration and door U-factor and product ratings—energy_progress
05/02/2026Electric vehicle service equipment requirements—energy_progress
05/02/2026Insulation placement and R values—energy_progress
05/02/2026Structural Wood Frame—progress
05/02/2026Lowest Floor Elevation—progress
05/02/2026Footing and Foundation—progress
05/02/2026Fire-Resistance Rated Construction—progress
05/02/2026Final—progress
05/02/2026Energy Code Compliance Inspections—progress
05/02/2026Wood – Prefabricated I-Joists—special
05/02/2026Subsurface Investigations (Borings/Test Pits)—special
05/02/2026Subsurface Conditions – Fill Placement & In-Place Density—special
05/02/2026Subgrade Inspections—special
09/23/2024Subsurface Investigations (Borings/Test Pits)—special
11/26/2023Fire-Resistant Penetrations and Joints—special
Latest 25 of 47.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/16/2026Q00964816-S1Request digital key ↗
08/16/2026Q00964816-I1Request digital key ↗
08/16/2026Q00964816-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026Q00964816-P1Open ↗
08/13/2026Q00964816-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/16/2026Q00964816-P1Open ↗
08/13/2026Q00964816-I1Open ↗
08/13/2026Q00964816-S1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/14/2026Q00964816-P1Open ↗
08/13/2026Q00964816-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00964816-I1Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification2
08/14/2026Q00964816-P1Open ↗
08/13/2026Q00964816-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/14/2026Q00964816-P1Open ↗
08/13/2026Q00964816-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/14/2026Q00964816-P1Open ↗