← Back
Bungalow colony - cooperatively owned land
217-02 BREEZY POINT BLVD
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered60 Open Violations 2 unresolved · 58 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 12,253,428 sf lot · 0.13 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.1004/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC301/20/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272301/20/2026
Building Lifecycle
All (20)Filed (3)Permit Issued (1)Signed Off (1)Special Inspection (15)
03/06/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01332276-I1
01/22/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
01/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
01/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
01/22/2026
Special inspection requirement — Final
Walid Abdulla
01/20/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01332276-P2
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
01/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
01/20/2026
Special inspection requirement — Final
Walid Abdulla
01/20/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
01/16/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01332276-P1
01/16/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
01/16/2026
Special inspection requirement — Final
Walid Abdulla
01/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
01/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
01/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/18/2025
Permit issued — Solar
Q01332276-I1-SL
12/15/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01332276-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC12/18/2025
BISEQISSUEDRWG DEVELOPMENT CORP11/21/2005
BIS—ISSUEDRWG DEVELOPMENT CORP11/21/2005
1 project · most recent 12/15/2025
FiledStatusContractorScope
12/15/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
01/22/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
01/22/2026Energy Code Compliance InspectionsWalid Abdullaprogress
01/22/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
01/22/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
01/22/2026FinalWalid Abdullaprogress
01/20/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
01/20/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
01/20/2026Energy Code Compliance InspectionsWalid Abdullaprogress
01/20/2026FinalWalid Abdullaprogress
01/20/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
01/16/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
01/16/2026FinalWalid Abdullaprogress
01/16/2026Energy Code Compliance InspectionsWalid Abdullaprogress
01/16/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
01/16/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026Q01332276-I1Request digital key ↗
08/17/2026Q01332276-P2Request digital key ↗
08/17/2026Q01332276-P1Request digital key ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature9
08/31/2026Q01332276-I1Open ↗
08/31/2026Q01332276-I1Open ↗
08/31/2026Q01332276-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026Q01332276-I1Open ↗
08/31/2026Q01332276-I1Open ↗
08/28/2026Q01332276-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026Q01332276-I1Open ↗
08/17/2026Q01332276-P1Open ↗
08/13/2026Q01332276-P2Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026Q01332276-I1Open ↗
08/17/2026Q01332276-P1Open ↗
08/13/2026Q01332276-P2Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01332276-I1Open ↗