← Back
Bungalow colony - cooperatively owned land
217-02 BREEZY POINT BLVD
QUEENS · BIN 4621079
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered60 Open Violations 2 unresolved · 58 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 12,253,428 sf lot · 0.13 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUNGALOW DESIGN & ENGINEERING PC105/02/2026
PARKER AND WEST ENGINEERING, PLLC111/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUNGALOW DESIGN & ENGINEE4105105/02/2026
PARKER AND WEST ENGINEERI5272111/17/2025
Building Lifecycle
All (33)Filed (2)Permit Issued (1)Special Inspection (30)
05/02/2026
Filed — New Building
New plumbing work associated with NB Q00974801
Q00974801-P1
04/26/2026
Special inspection requirement — Concrete - Cast-In-Place
Deidre Duffy
04/26/2026
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Deidre Duffy
04/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Deidre Duffy
04/26/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Deidre Duffy
04/26/2026
Special inspection requirement — Heating Systems
Deidre Duffy
04/26/2026
Special inspection requirement — Mechanical Systems
Deidre Duffy
04/26/2026
Special inspection requirement — Subgrade Inspections
Deidre Duffy
04/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Deidre Duffy
04/26/2026
Special inspection requirement — Wood – Prefabricated I-Joists
Deidre Duffy
04/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Deidre Duffy
04/26/2026
Special inspection requirement — Final
Deidre Duffy
04/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
Deidre Duffy
04/26/2026
Special inspection requirement — Footing and Foundation
Deidre Duffy
04/26/2026
Special inspection requirement — Lowest Floor Elevation
Deidre Duffy
04/26/2026
Special inspection requirement — Structural Wood Frame
Deidre Duffy
04/26/2026
Special inspection requirement — Maintenance information
Deidre Duffy
04/26/2026
Special inspection requirement — Fenestration air leakage
Deidre Duffy
04/26/2026
Special inspection requirement — Metering
Deidre Duffy
04/26/2026
Special inspection requirement — Fireplaces
Deidre Duffy
04/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
Deidre Duffy
04/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
Deidre Duffy
04/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Deidre Duffy
04/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Deidre Duffy
04/26/2026
Special inspection requirement — Permanent certificate
Deidre Duffy
04/26/2026
Special inspection requirement — Air barrier — testing
Deidre Duffy
04/26/2026
Special inspection requirement — Insulation placement and R values
Deidre Duffy
04/26/2026
Special inspection requirement — Fenestration areas
Deidre Duffy
04/26/2026
Special inspection requirement — Ventilation and air distribution system
Deidre Duffy
04/26/2026
Special inspection requirement — Air barrier - visual inspection
Deidre Duffy
04/26/2026
Special inspection requirement — Interior lighting power
Deidre Duffy
11/18/2025
Permit issued — Solar
Q01319452-I1-SL
11/17/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01319452-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC11/18/2025
1 project · most recent 05/02/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/02/2026Permit IssuedSAND-BAR CONTRACTORS INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Trane ×2
Heating
Navien ×1
Ventilation
Broan ×1
1 project · most recent 05/02/2026
Sprinkler System
FiledStatusContractorScope
05/02/2026——Sprinkler System
1 project · most recent 05/02/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/02/2026Permit IssuedJOSEPH O'GRADY P & H INCGas, Water/Sanitary
2 projects · most recent 05/14/2026
General Wiring
FiledStatusContractorScope
05/14/2026CompleteG.E.O. ELECTRIC CORPGeneral Wiring
11/17/2025CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 05/02/2026
Wood
FiledStatusContractorScope
05/02/2026Permit IssuedJOSEPH O'GRADY P & H INCWood
1 project · most recent 11/17/2025
FiledStatusContractorScope
11/17/2025Signed-offSUNRUN INSTALLATION SVC20 panels, 8.2 kw, 210.23 roof_area_sqft
1 project · most recent 05/02/2026
Earthwork
FiledStatusContractorScope
05/02/2026Permit IssuedJOSEPH O'GRADY P & H INCEarthwork
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
04/26/2026Concrete - Cast-In-PlaceDeidre Duffyspecial
04/26/2026Construction Utilizing CLT or SCL, Type IVDeidre Duffyspecial
04/26/2026Fire-Resistant Penetrations and JointsDeidre Duffyspecial
04/26/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Deidre Duffyspecial
04/26/2026Heating SystemsDeidre Duffyspecial
04/26/2026Mechanical SystemsDeidre Duffyspecial
04/26/2026Subgrade InspectionsDeidre Duffyspecial
04/26/2026Subsurface Investigations (Borings/Test Pits)Deidre Duffyspecial
04/26/2026Wood – Prefabricated I-JoistsDeidre Duffyspecial
04/26/2026Energy Code Compliance InspectionsDeidre Duffyprogress
04/26/2026FinalDeidre Duffyprogress
04/26/2026Fire-Resistance Rated ConstructionDeidre Duffyprogress
04/26/2026Footing and FoundationDeidre Duffyprogress
04/26/2026Lowest Floor ElevationDeidre Duffyprogress
04/26/2026Structural Wood FrameDeidre Duffyprogress
04/26/2026Maintenance informationDeidre Duffyenergy_progress
04/26/2026Fenestration air leakageDeidre Duffyenergy_progress
04/26/2026MeteringDeidre Duffyenergy_progress
04/26/2026FireplacesDeidre Duffyenergy_progress
04/26/2026Duct leakage testing, insulation and designDeidre Duffyenergy_progress
04/26/2026HVAC-R and service water heating system controlsDeidre Duffyenergy_progress
04/26/2026Fenestration and door U-factor and product ratingsDeidre Duffyenergy_progress
04/26/2026HVAC-R and service water piping design and insulationDeidre Duffyenergy_progress
04/26/2026Permanent certificateDeidre Duffyenergy_progress
04/26/2026Air barrier — testing Deidre Duffyenergy_progress
Latest 25 of 31.
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026Q01319452-I1Request digital key ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026Q00974801-I1Open ↗
09/02/2026Q00974801-I1Open ↗
09/02/2026Q00974801-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q00974801-I1Open ↗
09/02/2026Q00974801-I1Open ↗
09/02/2026Q00974801-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026Q01319452-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01319452-I1Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00974801-I1Open ↗