← Back
Bungalow colony - cooperatively owned land
217-02 BREEZY POINT BLVD
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered60 Open Violations 2 unresolved · 58 paperwork only ▸
Bungalow colony - cooperatively owned land · Owner of record: BREEZY POINT COOPERATIVE, INC · 12,253,428 sf lot · 0.13 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.1603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CMC DESIGN ARCHITECT, P.C.304/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AC BUILDING CONSULTANTS, INC.303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GERARD LEIBElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CMC DESIGN ARCHITECT, P.C2984204/13/2021
Building Lifecycle
All (25)Filed (3)Signed Off (2)Violation (1)Objection (8)Special Inspection (11)
10/20/2021
Signed off — Alteration
Installation of plumbing fixtures, sprinkler heads (PL) and related piping as per plans filed herewith in conjunction with New Building Application #421796881. Installation of gas-fired emergency generator.
Q00218749-I1
10/15/2021
Signed off — Alteration
Q00220128-I1
05/20/2021
Special inspection requirement — HVAC insulation and sealing
Gary Lenhart
05/20/2021
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
Gary Lenhart
05/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Lenhart
05/20/2021
Special inspection requirement — HVAC and service water heating equipment
Gary Lenhart
05/20/2021
Special inspection requirement — HVAC and service water heating system controls
Gary Lenhart
04/13/2021
Filed — Alteration
Installation of plumbing fixtures, sprinkler heads (PL) and related piping as per plans filed herewith in conjunction with New Building Application #421796881. Installation of gas-fired emergency generator.
Q00218749-P1
03/26/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Lenhart
03/26/2021
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
Gary Lenhart
03/26/2021
Special inspection requirement — HVAC insulation and sealing
Gary Lenhart
03/26/2021
Special inspection requirement — HVAC and service water heating equipment
Gary Lenhart
03/26/2021
Special inspection requirement — HVAC and service water heating system controls
Gary Lenhart
05/29/2020
Objection raised — Structural
05/29/2020
Objection resolved — Addressed
05/29/2020
Objection raised — Structural
05/29/2020
Objection resolved — Addressed
05/29/2020
Objection raised — Scope
05/29/2020
Objection resolved — Addressed
05/29/2020
Objection raised — Inspections
05/29/2020
Objection resolved — Addressed
05/28/2020
Filed — Alteration
Installation of plumbing fixtures, sprinkler heads (PL) and related piping as per plans filed herewith in conjunction with New Building Application #421796881. Installation of gas-fired emergency generator.
Q00218749-I1
09/04/2019
Filed — Alteration
Q00220128-I1
09/04/2019
Special inspection requirement — Final
Gary Lenhart
11/13/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—ISSUEDSAND-BAR CONTRACTORS INC03/11/2021
BIS—ISSUEDSAND-BAR CONTRACTORS INC12/04/2020
BIS—ISSUEDSAND-BAR CONTRACTORS INC11/18/2020
BIS—ISSUEDSAND-BAR CONTRACTORS INC07/27/2020
BIS—ISSUEDSAND-BAR CONTRACTORS INC07/23/2020
1 project · most recent 11/04/2020
General Wiring
FiledStatusContractorScope
11/04/2020CompleteG.E.O. ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
05/20/2021HVAC insulation and sealing Gary Lenhartenergy_progress
05/20/2021On-Site Private Sewage Disposal Systems InstallationGary Lenhartspecial
05/20/2021Fire-Resistant Penetrations and JointsGary Lenhartspecial
05/20/2021HVAC and service water heating equipment Gary Lenhartenergy_progress
05/20/2021HVAC and service water heating system controls Gary Lenhartenergy_progress
03/26/2021Fire-Resistant Penetrations and JointsGary Lenhartspecial
03/26/2021On-Site Private Sewage Disposal Systems InstallationGary Lenhartspecial
03/26/2021HVAC insulation and sealing Gary Lenhartenergy_progress
03/26/2021HVAC and service water heating equipment Gary Lenhartenergy_progress
03/26/2021HVAC and service water heating system controls Gary Lenhartenergy_progress
09/04/2019FinalGary Lenhartprogress
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026Q00218749-P1Request digital key ↗
08/14/2026Q00218749-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00220128-I1Request digital key ↗
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION3
08/17/2020421796881Open ↗
08/17/2020421796881Open ↗
07/27/2020421796881Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
06/07/2021421796881Open ↗
05/28/2021421796881Open ↗
09/05/2019421796881Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/15/2021421796881Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/17/2021421796881Open ↗
▸BISZONING DIAGRAM1
03/12/2020421796881Open ↗
▸BISVERIFY TAX LOT1
10/15/2021421796881Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026Q00218749-P1Open ↗
08/27/2026Q00218749-P1Open ↗
08/27/2026Q00218749-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026Q00218749-P1Open ↗
08/27/2026Q00218749-P1Open ↗
08/24/2026Q00218749-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/17/2020421796881Open ↗
03/18/2020421796881Open ↗
03/18/2020421796881Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026Q00220128-I1Open ↗
08/27/2026Q00218749-P1Open ↗
08/27/2026Q00218749-I1Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
09/05/2019421796881Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/24/2021421796881Open ↗
06/04/2021421796881Open ↗
05/04/2021421796881Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/04/2021421796881Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/17/2020421796881Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY4
10/19/2021421796881Open ↗
06/24/2021421796881Open ↗
06/04/2021421796881Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
09/17/2021421796881Open ↗
06/04/2021421796881Open ↗
08/17/2020421796881Open ↗
▸DOB NOWHydrant Flow Test Letter2
08/27/2026Q00218749-P1Open ↗
08/14/2026Q00218749-I1Open ↗
▸DOB NOWHydraulic Flow Calculations2
08/13/2026Q00218749-P1Open ↗
08/13/2026Q00218749-I1Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/18/2020421796881Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
08/17/2020421796881Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
10/15/2021421796881Open ↗
▸Approvals, Objections & Sign-offs10
▸BISLETTERS - SUPPORTING DOCUMENTATION6
08/17/2020421796881Open ↗
03/18/2020421796881Open ↗
03/18/2020421796881Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
05/28/2021421796881Open ↗
09/05/2019421796881Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
10/15/2021421796881Open ↗
▸BISSEPTIC TANK APPROVAL1
10/15/2021421796881Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION8
06/29/2021421796881Open ↗
06/24/2021421796881Open ↗
06/15/2021421796881Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET1
09/05/2019421796881Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM2
09/17/2021421796881Open ↗
09/05/2019421796881Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1