ECB07/12/1999FAILURE TO PROVIDE ADEQUATE PROTECTION FOR SIDEWALKS & WALKWAYS DURINGCONSTRUCITON OPERATION. AT TIME OF INSPECTION MORTAR PREPARING ON THESIDEWALK. BRICKS & OTHER MATERIAL SLOPING ON THE STREET.Nothing owed — awaiting certificate of correction
One story - permanent living quarter · 3,600 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.