← Back
BuildNYC
Two stories - detached, small or mid-size
217-12 PECK AVENUE
QUEENS · BIN 4164790
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
1,800 sfGross Floor Area
1Units
1 Active Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,168 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 18 docs
Floor 2Under Construction15p · 1 filing · 18 docs
Floor 1Under Construction19p · 1 filing · 18 docs
CellarUnder Construction19p · 1 filing · 18 docs
Site & exteriorUnder Construction22p · 1 filing · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Just Consulting Engineering208/20/2026
Gerald Caliendo Architects407/28/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gerald J. Caliendo R.A.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Design R USGeneral Contractor310/22/2026
Design R USScaffold310/22/2026
Lal ConstructionGeneral Contractor103/21/2026
Four Points P & HPlumbing108/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616508/20/2026
Building Lifecycle
10/21/2026
Permit renewed — Construction Fence
Renewed without changes
Q01342346-S1-FN
10/21/2026
Permit renewed — General Construction
Renewed without changes
Q01342346-I1-GC
10/19/2026
Permit renewed — Construction Fence
Renewed without changes
Q01342346-S1-FN
10/18/2026
Permit expired, never signed off — Structural
The city's record still shows this permit as issued, with no sign-off on its filing
Q01342346-S3-GC-CX
10/02/2026
Obs closed 2 story alt site with const.fence on @ expos 1,2,4. Viewing panels are missing on the extension area of work on expo 1, contrary to bc…
ECB violation · open
58 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedDesign R US10/21/2026
DOB NOWGeneral ConstructionPermit IssuedDesign R US10/21/2026
DOB NOWConstruction FencePermit IssuedDesign R US10/19/2026
DOB NOWPlumbingPermit IssuedFour Points P & H08/20/2026
DOB NOWStructuralPermit IssuedDesign R US07/29/2026
DOB NOWGeneral ConstructionPermit IssuedDesign R US07/23/2026
DOB NOWConstruction FencePermit IssuedDesign R US07/17/2026
BISOTISSUEDLal Construction03/11/2005
BISOTISSUEDN/A06/11/1997
1 project · most recent 08/20/2026
Water/Sanitary
FiledStatusContractorScope
08/20/2026Permit IssuedFour Points P & HWater/Sanitary
1 project · most recent 08/20/2026
Steel Wood
FiledStatusContractorScope
08/20/2026Permit IssuedDesign R USSteel, Wood
1 project · most recent 08/20/2026
Fence
FiledStatusContractorScope
08/20/2026Permit IssuedDesign R USFence
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
07/28/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
07/28/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
07/28/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
07/28/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
07/28/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
07/28/2026Air barrier — testing SHAHRIAR QUAYYUMenergy_progress
07/28/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
07/28/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
07/28/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
07/28/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
07/28/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
07/28/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
07/28/2026Permanent certificateSHAHRIAR QUAYYUMenergy_progress
07/28/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
07/28/2026Electric vehicle service equipment requirementsSHAHRIAR QUAYYUMenergy_progress
04/03/2026Structural Wood FrameSHAHRIAR QUAYYUMprogress
04/03/2026Wood – Seismic ResistanceSHAHRIAR QUAYYUMspecial
01/28/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
01/28/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
01/28/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
01/09/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
01/09/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
01/09/2026Subgrade InspectionsSHAHRIAR QUAYYUMspecial
01/09/2026FinalSHAHRIAR QUAYYUMprogress
01/09/2026Footing and FoundationSHAHRIAR QUAYYUMprogress
Latest 25 of 26.
23 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account