← Back
Two family converted from one family
217-30 138 ROAD
QUEENS · BIN 4280470
💬 Discuss this project
1960Year Built
1Stories
B3Building Class
R3XZoning
2,194 sfGross Floor Area
2Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 29p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Cellar10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROXY DEVELOPMENT203/21/2026
217-30 138 ROAD LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/02/2023$1.0M—— → —$474/sf building
10/25/2021$558K—— → —$254/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN411/08/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor807/08/2026
INDY ELECTRIC CORP.Electrical103/22/2026
TOP DOG PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616311/08/2022
Building Lifecycle
All (82)Filed (4)Permit Issued (5)Signed Off (2)Violation (27)Inspection (8)Objection (8)Special Inspection (28)
11/25/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
08/09/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/29/2023
Violation issued (HPD, open)
I
01/24/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/20/2023
Signed off — Alteration
Q00630878-I1
01/18/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/05/2022
Permit issued — Structural
Q00617827-I1-GC-CX
12/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/02/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
12/02/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/02/2022
Special inspection requirement — Final
FAHAD FATEH
12/02/2022
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/02/2022
Special inspection requirement — Structural Wood Frame
FAHAD FATEH
12/02/2022
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
12/02/2022
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
12/02/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
12/02/2022
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
12/02/2022
Special inspection requirement — Fenestration areas
FAHAD FATEH
12/02/2022
Special inspection requirement — Permanent certificate
FAHAD FATEH
12/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
12/02/2022
Special inspection requirement — Interior lighting power
FAHAD FATEH
12/01/2022
Permit issued — Construction Fence
Q00630878-I1-FN
11/29/2022
Objection resolved — Addressed
11/18/2022
Violation issued (HPD, closed)
I
11/11/2022
Objection raised — Admin
11/08/2022
Filed — Alteration CO
Existing one family dwelling to be vertically enlarged and converted into a two family dwellings. New drywall partitions ,and plumbing fixtures as per plans. File hereby to answer DOB violation #4784581,and to take over ALT I application #401701119.
Q00617827-P1
10/31/2022
Signed off — Alteration
installation of new gas fired equipment,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app#Q00617827-I1
Q00631133-I1
10/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/28/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
10/28/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
10/28/2022
Special inspection requirement — Final
FAHAD FATEH
10/28/2022
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
10/28/2022
Special inspection requirement — Structural Wood Frame
FAHAD FATEH
10/28/2022
Special inspection requirement — Interior lighting power
FAHAD FATEH
10/28/2022
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
10/28/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
10/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
10/28/2022
Special inspection requirement — Permanent certificate
FAHAD FATEH
10/28/2022
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
10/28/2022
Special inspection requirement — Fenestration areas
FAHAD FATEH
10/28/2022
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
06/13/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/02/2022
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
03/28/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/01/2022
Permit issued — Plumbing
Q00631133-I1-PL
01/10/2022
Filed — Alteration
installation of new gas fired equipment,and plumbing fixtures for the renovation and conversion of the existing one family dwelling into a two family dwelling. Filed in conjunction with ALT I app#Q00617827-I1
Q00631133-I1
12/02/2021
Permit issued — General Construction
Q00617827-I1-GC-CX
12/01/2021
Permit issued — Construction Fence
Q00630878-I1-FN
11/22/2021
Filed — Alteration
Q00630878-I1
11/08/2021
Objection raised — Scope
11/08/2021
Objection resolved — Addressed
11/08/2021
Objection raised — Zoning
11/08/2021
Objection resolved — Addressed
11/08/2021
Objection raised — Scope
11/08/2021
Objection resolved — Addressed
11/03/2021
Filed — Alteration CO
Existing one family dwelling to be vertically enlarged and converted into a two family dwellings. New drywall partitions ,and plumbing fixtures as per plans. File hereby to answer DOB violation #4784581,and to take over ALT I application #401701119.
Q00617827-I1
08/12/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedJ&J DESIGNS INC12/05/2022
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC12/01/2022
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP02/01/2022
DOB NOWGeneral ConstructionPermit IssuedJ&J DESIGNS INC12/02/2021
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC12/01/2021
BIS—ISSUEDVINTAGE HOMES INC07/24/2003
BISEQISSUEDVINTAGE HOMES INC07/24/2003
1 project · most recent 10/13/2022
General Wiring
FiledStatusContractorScope
10/13/2022CompleteINDY ELECTRIC CORP.General Wiring
1 project · most recent 11/08/2022
Wood
FiledStatusContractorScope
11/08/2022Permit IssuedJ&J DESIGNS INCWood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/09/2024Fail-Final General Construction Non-Directive 14FailView ↗
01/24/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/18/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/13/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/02/2022No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/28/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
12/02/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/02/2022Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
12/02/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
12/02/2022FinalFAHAD FATEHprogress
12/02/2022Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/02/2022Structural Wood FrameFAHAD FATEHprogress
12/02/2022Fenestration air leakageFAHAD FATEHenergy_progress
12/02/2022Insulation placement and R valuesFAHAD FATEHenergy_progress
12/02/2022Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
12/02/2022Air barrier - visual inspectionFAHAD FATEHenergy_progress
12/02/2022Fenestration areasFAHAD FATEHenergy_progress
12/02/2022Permanent certificateFAHAD FATEHenergy_progress
12/02/2022HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
12/02/2022Interior lighting powerFAHAD FATEHenergy_progress
10/28/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/28/2022Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
10/28/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
10/28/2022FinalFAHAD FATEHprogress
10/28/2022Fire-Resistance Rated ConstructionFAHAD FATEHprogress
10/28/2022Structural Wood FrameFAHAD FATEHprogress
10/28/2022Interior lighting powerFAHAD FATEHenergy_progress
10/28/2022Air barrier - visual inspectionFAHAD FATEHenergy_progress
10/28/2022Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
10/28/2022HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
10/28/2022Permanent certificateFAHAD FATEHenergy_progress
Latest 25 of 28.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00630878-I1Request digital key ↗
08/26/2026Q00631133-I1Request digital key ↗
08/15/2026Q00617827-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION8
07/24/2023401701119Open ↗
06/20/2023401701119Open ↗
06/20/2023401701119Open ↗
Showing 3 of 8 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT1
09/26/2019401701119Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00617827-P1Open ↗
08/13/2026Q00617827-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00617827-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/30/2026Q00617827-I1Open ↗
08/30/2026Q00617827-I1Open ↗
08/30/2026Q00617827-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00631133-I1Open ↗
08/13/2026Q00617827-I1Open ↗
08/13/2026Q00630878-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026Q00617827-I1Open ↗
08/26/2026Q00617827-P1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00617827-I1Open ↗
08/13/2026Q00617827-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00617827-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00631133-I1Open ↗
08/13/2026Q00617827-I1Open ↗
08/13/2026Q00617827-P1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00617827-I1Open ↗
08/13/2026Q00631133-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial2
08/13/2026Q00617827-P1Open ↗
08/13/2026Q00617827-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00617827-P1Open ↗
08/13/2026Q00617827-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00617827-P1Open ↗
08/13/2026Q00617827-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/13/2026Q00617827-I1Open ↗
08/13/2026Q00617827-P1Open ↗
▸DOB NOWSURVEY: INITIAL2
08/13/2026Q00617827-P1Open ↗
08/13/2026Q00617827-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00617827-I1Open ↗