Two stories - detached, small or mid-size
217-36 77 AVENUE
QUEENS · Oakland Gardens-Hollis Hills · BIN 4164043
💬 Discuss this project
1945Year Built
2Stories
A1Building Class
R2AZoning
2,997 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 5,995 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingCivil
Floor 213p · 1 filing · 20 docs
Floor 115p · 1 filing · 20 docs
Cellar15p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC212/17/2025
JLS DESIGNS709/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JLS DESIGNS403/21/2026
LS EXPEDITOR303/21/2026
ACA ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARCHLINK DESIGN CORPGeneral Contractor1004/09/2026
TRINITY SOLAR LLCGeneral Contractor303/21/2026
LG ELITE PLUMBING INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036212/17/2025
JLS DESIGNS1377609/26/2024
SD TESTING & INSPECTION S7010111/17/2023
Building Lifecycle
All (93)Filed (9)Permit Issued (7)Signed Off (4)Violation (1)Inspection (6)Objection (36)Special Inspection (30)
04/29/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
Proposed 2nd floor addition to an existing 1 1/2 story one family dwelling with cellar and renovate interior.
Q00803705-S3
03/11/2026
Permit issued — Structural
Q00803705-S3-ST
02/26/2026
Signed off — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Q01169852-I1
02/19/2026
Special inspection requirement — Final
Ayracon Almaraz
02/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUL AHSAN
02/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
02/19/2026
Special inspection requirement — Air barrier - visual inspection
Ayracon Almaraz
12/17/2025
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Q01169852-P1
11/21/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Proposed 2nd floor addition to an existing 1 1/2 story one family dwelling with cellar and renovate interior.
Q00803705-S2
01/31/2025
Permit issued — Plumbing
Q00803705-S2-PL
01/27/2025
Permit issued — Solar
Q01169852-I1-SL
01/23/2025
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Q01169852-I1
10/10/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOSEPH SULTANA, JR
10/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH SULTANA, JR
10/04/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed 2nd floor addition to an existing 1 1/2 story one family dwelling with cellar and renovate interior.
Q00803705-P5
09/22/2024
Signed off — Alteration
temp wood construction fence
Q00803913-I1
09/18/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOSEPH SULTANA, JR
09/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH SULTANA, JR
06/10/2024
Permit issued — Earth Work
Q00803705-I1-GC-CX
02/26/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/26/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/26/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/07/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed 2nd floor addition to an existing 1 1/2 story one family dwelling with cellar and renovate interior.
Q00803705-P4
02/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH SULTANA, JR
02/01/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOSEPH SULTANA, JR
01/22/2024
Objection resolved — Addressed
01/22/2024
Objection resolved — Addressed
01/22/2024
Objection resolved — Addressed
01/22/2024
Objection resolved — Addressed
01/22/2024
Special inspection requirement — Masonry
JOSEPH SULTANA, JR
01/22/2024
Special inspection requirement — Structural Steel - Welding
XIUCHENG LI
01/22/2024
Special inspection requirement — Subgrade Inspections
JOSEPH SULTANA, JR
01/22/2024
Special inspection requirement — Concrete - Cast-In-Place
JOSEPH SULTANA, JR
01/22/2024
Special inspection requirement — Structural Steel - High Strength Bolting
XIUCHENG LI
12/19/2023
Permit issued — Plumbing
Q00803705-S2-PL
11/22/2023
Objection raised — Structural
11/22/2023
Objection raised — Admin
11/22/2023
Objection raised — Inspections
11/22/2023
Objection raised — Admin
11/17/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed 2nd floor addition to an existing 1 1/2 story one family dwelling with cellar and renovate interior.
Q00803705-S3
10/24/2023
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH SULTANA, JR
10/24/2023
Special inspection requirement — Footing and Foundation
JOSEPH SULTANA, JR
10/24/2023
Special inspection requirement — Mechanical Systems
JOSEPH SULTANA, JR
10/24/2023
Special inspection requirement — Final
JOSEPH SULTANA, JR
10/24/2023
Special inspection requirement — Insulation placement and R values
JOSEPH SULTANA, JR
10/24/2023
Special inspection requirement — Preliminary
JOSEPH SULTANA, JR
10/24/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SAMER ABOU-GHAIDA
10/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH SULTANA, JR
10/24/2023
Special inspection requirement — Duct leakage testing, insulation and design
JOSEPH SULTANA, JR
10/24/2023
Special inspection requirement — Air barrier - visual inspection
JOSEPH SULTANA, JR
10/24/2023
Special inspection requirement — Maintenance information
JOSEPH SULTANA, JR
10/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH SULTANA, JR
10/24/2023
Special inspection requirement — Ventilation and air distribution system
JOSEPH SULTANA, JR
10/24/2023
Special inspection requirement — Shutoff dampers
JOSEPH SULTANA, JR
10/24/2023
Special inspection requirement — Permanent certificate
JOSEPH SULTANA, JR
10/10/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed 2nd floor addition to an existing 1 1/2 story one family dwelling with cellar and renovate interior.
Q00803705-P2
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offARCHLINK DESIGN CORP03/11/2026
DOB NOWPlumbingSigned-offLG ELITE PLUMBING INC01/31/2025
DOB NOWSolarSigned-offTRINITY SOLAR LLC01/27/2025
DOB NOWEarth WorkPermit IssuedARCHLINK DESIGN CORP06/10/2024
DOB NOWPlumbingSigned-offLG ELITE PLUMBING INC12/19/2023
DOB NOWGeneral ConstructionPermit IssuedARCHLINK DESIGN CORP08/02/2023
DOB NOWConstruction FenceSigned-offARCHLINK DESIGN CORP08/01/2023
1 project · most recent 09/26/2024
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/26/2024Signed-offARCHLINK DESIGN CORPHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Lg ARUN060GSS4 64,000 BTU · Vrf Outdoor ×4
ARUM036GSS5 42,000 BTU · Vrf Outdoor ×2
Heating
Rinnai RU160IN 160,000 BTU · Boiler ×2
Ventilation
Lg ARVU063ZEA2 590 CFM · Vrf Outdoor ×4
1 project · most recent 09/26/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/26/2024Signed-offLG ELITE PLUMBING INCGas, Storm, Water/Sanitary
3 projects · most recent 05/03/2025
General Wiring
FiledStatusContractorScope
05/03/2025CompleteREDLINE ELECTRIC INC—
03/13/2024CompleteR & T ELECTRICAL CORPGeneral Wiring
10/04/2023CompleteR & T ELECTRICAL CORP—
1 project · most recent 09/26/2024
Wood
FiledStatusContractorScope
09/26/2024Signed-offARCHLINK DESIGN CORPWood
1 project · most recent 09/26/2024
Earthwork
FiledStatusContractorScope
09/26/2024Signed-offARCHLINK DESIGN CORPEarthwork
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/04/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/26/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/26/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/26/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
02/19/2026Energy Code Compliance InspectionsAyracon Almarazprogress
02/19/2026Air barrier - visual inspectionAyracon Almarazenergy_progress
02/19/2026Fire-Resistant Penetrations and JointsKAMRUL AHSANspecial
02/19/2026FinalAyracon Almarazprogress
10/10/2024Fire-Resistant Penetrations and JointsJOSEPH SULTANA, JRspecial
10/10/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOSEPH SULTANA, JRspecial
09/18/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOSEPH SULTANA, JRspecial
09/18/2024Fire-Resistant Penetrations and JointsJOSEPH SULTANA, JRspecial
02/01/2024Fire-Resistant Penetrations and JointsJOSEPH SULTANA, JRspecial
02/01/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOSEPH SULTANA, JRspecial
01/22/2024Subgrade InspectionsJOSEPH SULTANA, JRspecial
01/22/2024MasonryJOSEPH SULTANA, JRspecial
01/22/2024Structural Steel - WeldingXIUCHENG LIspecial
01/22/2024Structural Steel - High Strength BoltingXIUCHENG LIspecial
01/22/2024Concrete - Cast-In-PlaceJOSEPH SULTANA, JRspecial
10/24/2023Interior lighting powerJOSEPH SULTANA, JRenergy_progress
10/24/2023Fenestration air leakageJOSEPH SULTANA, JRenergy_progress
10/24/2023Fenestration areasJOSEPH SULTANA, JRenergy_progress
10/24/2023HVAC-R and service water heating system controlsJOSEPH SULTANA, JRenergy_progress
10/24/2023Permanent certificateJOSEPH SULTANA, JRenergy_progress
10/24/2023HVAC-R and service water piping design and insulationJOSEPH SULTANA, JRenergy_progress
10/24/2023Insulation placement and R valuesJOSEPH SULTANA, JRenergy_progress
10/24/2023Duct leakage testing, insulation and designJOSEPH SULTANA, JRenergy_progress
10/24/2023Air barrier - visual inspectionJOSEPH SULTANA, JRenergy_progress
10/24/2023Maintenance informationJOSEPH SULTANA, JRenergy_progress
Latest 25 of 73.
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026Q00803705-P5Request digital key ↗
08/23/2026Q00803705-S3Request digital key ↗
08/23/2026Q00803705-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00803705-P2Open ↗
08/13/2026Q00803705-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q00803705-I1Open ↗
08/13/2026Q00803705-P2Open ↗
▸Seals & Professional Certifications70
▸DOB NOWProgress Inspector Seal & Signature36
08/28/2026Q00803705-P2Open ↗
08/28/2026Q00803705-P2Open ↗
08/28/2026Q00803705-P2Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
08/30/2026Q00803705-S2Open ↗
08/28/2026Q00803705-P2Open ↗
08/28/2026Q00803705-P2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/18/2026Q01169852-P1Open ↗
08/18/2026Q01169852-I1Open ↗
08/13/2026Q00803705-P4Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00803705-I1Open ↗
08/13/2026Q00803705-P2Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00803705-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/18/2026Q01169852-I1Open ↗
08/18/2026Q01169852-P1Open ↗
08/13/2026Q00803705-P2Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00803705-S2Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q00803705-P2Open ↗
08/13/2026Q00803705-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00803705-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01169852-I1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/13/2026Q00803705-P2Open ↗
08/13/2026Q00803705-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00803705-I1Open ↗
08/13/2026Q00803705-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/13/2026Q00803705-I1Open ↗
08/13/2026Q00803705-P2Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00803705-S3Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00803705-I1Open ↗