Two family frame
217-41 HOLLIS AVENUE
QUEENS · BIN 4239276
💬 Discuss this project
1940Year Built
2.5Stories
B2Building Class
R3-2Zoning
2,725 sfGross Floor Area
2Units
Two family frame · 3,936 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI103/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
POWER SURGE ELECTRIC, INCElectrical103/22/2026
NYSS LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841103/23/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
04/13/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01376261-I1
03/31/2026
Permit issued — Solar
Q01376261-I1-SL
03/23/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01376261-I1
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
03/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
03/23/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
03/23/2026
Special inspection requirement — Final
ROBERT MASONE
03/23/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC03/31/2026
2 projects · most recent 04/06/2026
General Wiring
FiledStatusContractorScope
04/06/2026CompleteNY SOLAR ELECTRICAL LLC—
09/10/2020Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/23/2026Fire-Resistant Penetrations and JointsROBERT MASONEspecial
03/23/2026Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
03/23/2026Energy Code Compliance InspectionsROBERT MASONEprogress
03/23/2026FinalROBERT MASONEprogress
03/23/2026Air barrier - visual inspectionROBERT MASONEenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/29/2026Q01376261-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q01376261-I1Open ↗
08/25/2026Q01376261-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/29/2026Q01376261-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q01376261-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/29/2026Q01376261-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01376261-I1Open ↗