Fac Joe Shelter Retrofit Ghpp
217 50TH STREET · BIN 3012864
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
M1-2DZoning
6,800 sfGross Floor Area
8Units
Rent Stabilized19 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: Fac Cluster Housing Development Fund Corp Poration · 2,504 sf lot · 2.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRoof mounted photovoltaic system installationUnder Construction20p · 2 filings · 20 docs
Floor 4Under Construction16p · 1 filing · 20 docs
Floor 3Under Construction16p · 1 filing · 20 docs
Floor 2Under Construction17p · 1 filing · 20 docs
Floor 1Under Construction17p · 1 filing · 20 docs
CellarUnder Construction20p · 1 filing · 20 docs
Sub-BasementRoof mounted photovoltaic system installationUnder Construction1 filing · 7 docs
Site & exteriorRoof mounted photovoltaic system installationUnder Construction8p · 3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fifth Ave Committee2710/13/2026
Fac Cluster Housing Development Fund Corp Poration103/22/2026
Joe Fac Infinity103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NKM Engineering108/31/2026
Old Structures Engineering203/19/2026
Msla USA201/31/2025
Agarabi Engineering201/13/2025
Cycle Architecture105/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kna Consulting803/21/2026
Rigging Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CVM ConstructionScaffold407/08/2026
CVM ConstructionGeneral Contractor307/08/2026
Brooklyn SolarworksGeneral Contractor109/12/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244108/31/2026
Metric Consulting and Ins1803603/19/2026
Building Lifecycle
All (112)Filed (9)Permit Issued (10)Violation (60)Inspection (3)Special Inspection (30)
09/10/2026
Permit issued — Solar
B01440041-I1-SL
08/31/2026
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01440041-I1
08/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
08/26/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
08/03/2026
Special inspection requirement — Final
NARESH MAHANGU
07/14/2026
Violation issued (HPD, closed)
C
07/14/2026
Violation issued (HPD, open)
C
07/14/2026
Violation issued (HPD, open)
A
05/28/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/15/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
05/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/01/2026
Violation issued (HPD, closed)
A
03/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
03/26/2026
Special inspection requirement — Structural Cold-Formed Steel
SAMI HAJJAR P.E
03/26/2026
Special inspection requirement — Masonry
SAMI HAJJAR P.E
03/26/2026
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
03/26/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
03/26/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
03/26/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
03/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
03/26/2026
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
03/19/2026
Filed — Alteration
PROPOSED REPAIRS TO EXISTING EXTERIOR WALLS, FACADE ATTACHMENTS TO PANELIZED EXTERIOR WALL SYSTEM AND REPAIR AND EXTEND FIRE ESCAPE PLATFORMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01043787-P1
03/18/2026
Permit issued — Mechanical Systems
B01043787-S3-MS
03/12/2026
Special inspection requirement — Structural Cold-Formed Steel
SAMI HAJJAR P.E
03/12/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
03/12/2026
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
03/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
03/12/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
03/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/12/2026
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
03/12/2026
Special inspection requirement — Masonry
SAMI HAJJAR P.E
03/12/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
02/27/2026
Permit issued — Suspended Scaffold
B01184200-I1-SC
12/18/2025
Permit issued — Sidewalk Shed
B01166513-I1-SH
12/18/2025
Permit issued — Supported Scaffold
B01166454-I1-SF
12/18/2025
Permit issued — General Construction
B01043787-I1-GC
08/09/2025
Violation issued (HPD, closed)
C
04/14/2025
Filed — Alteration
PROPOSED REPAIRS TO EXISTING EXTERIOR WALLS, FACADE ATTACHMENTS TO PANELIZED EXTERIOR WALL SYSTEM AND REPAIR AND EXTEND FIRE ESCAPE PLATFORMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01043787-S1
04/04/2025
Permit issued — General Construction
B01043787-I1-GC
02/26/2025
Permit issued — Suspended Scaffold
B01184200-I1-SC
02/24/2025
Filed — Alteration
Suspended Scaffolding for Facade Repair
B01184200-I1
01/31/2025
Filed — Alteration
INSTALLATION OF SUPPORTED SCAFFOLDING AS PER DRAWINGS.
B01166454-I1
01/31/2025
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER DRAWINGS.
B01166513-I1
01/31/2025
Permit issued — Sidewalk Shed
B01166513-I1-SH
01/31/2025
Permit issued — Supported Scaffold
B01166454-I1-SF
01/13/2025
Filed — Alteration
PROPOSED REPAIRS TO EXISTING EXTERIOR WALLS, FACADE ATTACHMENTS TO PANELIZED EXTERIOR WALL SYSTEM AND REPAIR AND EXTEND FIRE ESCAPE PLATFORMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01043787-S2
01/13/2025
Filed — Alteration
PROPOSED REPAIRS TO EXISTING EXTERIOR WALLS, FACADE ATTACHMENTS TO PANELIZED EXTERIOR WALL SYSTEM AND REPAIR AND EXTEND FIRE ESCAPE PLATFORMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01043787-S3
01/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
10/14/2024
Violation issued (HPD, closed)
B
10/14/2024
Violation issued (HPD, closed)
A
10/14/2024
Violation issued (HPD, closed)
C
10/14/2024
Violation issued (HPD, closed)
B
10/14/2024
Violation issued (HPD, closed)
B
06/10/2024
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
06/10/2024
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
06/10/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
06/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
06/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedBrooklyn Solarworks09/10/2026
DOB NOWMechanical SystemsPermit IssuedCVM Construction03/18/2026
DOB NOWSuspended ScaffoldPermit IssuedSPD Construction02/27/2026
DOB NOWSidewalk ShedPermit IssuedCVM Construction12/18/2025
DOB NOWSupported ScaffoldPermit IssuedCVM Construction12/18/2025
DOB NOWGeneral ConstructionPermit IssuedCVM Construction12/18/2025
DOB NOWGeneral ConstructionPermit IssuedCVM Construction04/04/2025
DOB NOWSuspended ScaffoldPermit IssuedSPD Construction02/26/2025
DOB NOWSidewalk ShedPermit IssuedCVM Construction01/31/2025
DOB NOWSupported ScaffoldPermit IssuedCVM Construction01/31/2025
BISOTISSUEDJ & V GNRL Contrng10/26/2006
BISPLISSUEDFlint Mechanical09/22/2006
BISOTISSUEDJ & V GNRL Contrng03/28/2006
BISBLISSUEDEast Coast Mechanical12/23/1999
BISPLISSUEDEast Coast Mechanical12/23/1999
1 project · most recent 03/19/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/19/2026Permit IssuedCVM ConstructionHeating and Air Conditioning Systems
Heat / Cool
Ephoca APE10R3H2 9,086 BTU · Heat Pump Outdoor ×8
AWE10R3H2 8,712 BTU · Heat Pump Outdoor ×8
King 2K1205 1 kW · Baseboard ×8
Stiebel Eltron CNS 100-1 TREND 1 kW · Electric Heater ×3
CNS 50-2 3 1 kW ×1
Aldes E-150-TRG 125 CFM ×1
1 project · most recent 03/19/2026
Water/Sanitary
FiledStatusContractorScope
03/19/2026——Water/Sanitary
3 projects · most recent 08/26/2026
General Wiring
FiledStatusContractorScope
08/26/2026Permit IssuedBrooklyn Solar Electric—
08/20/2026Permit IssuedNion ElectricGeneral Wiring
03/19/2025Permit IssuedBorowide Elect'l Contractors—
1 project · most recent 03/19/2026
Steel Masonry
FiledStatusContractorScope
03/19/2026Permit IssuedCVM ConstructionSteel, Masonry
1 project · most recent 08/31/2026
FiledStatusContractorScope
08/31/2026Permit IssuedBrooklyn Solarworks16 panels, 7.04 kw, 1,647 roof_area_sqft
2 projects · most recent 01/31/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
01/31/2025Permit IssuedCVM ConstructionSidewalk Shed
01/31/2025Permit IssuedCVM ConstructionScaffold
1 project · most recent 02/24/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
02/24/2025Permit IssuedSPD ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/28/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/15/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
05/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
08/26/2026Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
08/26/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
08/03/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
08/03/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
08/03/2026FinalNARESH MAHANGUprogress
03/26/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
03/26/2026Structural Cold-Formed SteelSAMI HAJJAR P.Especial
03/26/2026MasonrySAMI HAJJAR P.Especial
03/26/2026Structural Steel - WeldingSAMI HAJJAR P.Especial
03/26/2026Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
03/26/2026Post-installed AnchorsSAMI HAJJAR P.Especial
03/26/2026FinalSAMI HAJJAR P.Eprogress
03/26/2026Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
03/26/2026Structural Steel - DetailsSAMI HAJJAR P.Especial
03/12/2026Structural Cold-Formed SteelSAMI HAJJAR P.Especial
03/12/2026Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
03/12/2026Structural Steel - DetailsSAMI HAJJAR P.Especial
03/12/2026Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
03/12/2026FinalSAMI HAJJAR P.Eprogress
03/12/2026Tenant Protection Plan Compliance—special
03/12/2026Structural Steel - WeldingSAMI HAJJAR P.Especial
03/12/2026MasonrySAMI HAJJAR P.Especial
03/12/2026Post-installed AnchorsSAMI HAJJAR P.Especial
01/09/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
06/10/2024Maintenance informationSAMI HAJJAR P.Eenergy_progress
Latest 25 of 47.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
10/13/2026B01440041-I1Request digital key ↗
08/23/2026B01166513-I1Request digital key ↗
08/23/2026B01166454-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/11/2026B01440041-I1Open ↗
08/23/2026B01166513-I1Open ↗
08/21/2026B01043787-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B01043787-S1Open ↗
08/29/2026B01043787-S3Open ↗
08/29/2026B01043787-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B01043787-S1Open ↗
09/01/2026B01043787-S1Open ↗
08/29/2026B01043787-S3Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/21/2026B01043787-S2Open ↗
08/21/2026B01043787-S3Open ↗
08/21/2026B01043787-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/11/2026B01440041-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
09/11/2026B01440041-I1Open ↗
08/13/2026B01043787-P1Open ↗
08/13/2026B01043787-S2Open ↗
Showing 3 of 8 on file for this type
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026B01184200-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01184200-I1Open ↗