217-63 77 AVENUE
QUEENS · Oakland Gardens-Hollis Hills · BIN 4164024
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
2,348 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 7,140 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 10 docs
Floor 12p · 1 filing · 10 docs
Cellar1p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY D. SACHS, PE101/16/2024
AMINOV DESIGN ENGINEER, PC112/10/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A D BUILDING SOLUTIONS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KM CONTRACTORS, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PACIFICO ENGINEERING PC3157101/16/2024
Building Lifecycle
All (35)Filed (2)Permit Issued (2)Signed Off (1)Inspection (5)Objection (12)Special Inspection (13)
06/03/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/22/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/24/2024
Signed off — Alteration
Installation of roof mounted solar. No change in use, egress, or occupancy.
Q00982773-I1
05/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/23/2024
Permit issued — General Construction
Q00974462-I1-GC
02/06/2024
Permit issued — Solar
Q00982773-I1-SL
01/16/2024
Filed — Alteration
Installation of roof mounted solar. No change in use, egress, or occupancy.
Q00982773-I1
12/27/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Pacifico
12/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
12/27/2023
Special inspection requirement — Final
Ralph Pacifico
12/27/2023
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
12/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
12/15/2023
Objection resolved — Addressed
12/15/2023
Objection resolved — Addressed
12/15/2023
Objection resolved — Addressed
12/15/2023
Objection resolved — Addressed
12/15/2023
Objection resolved — Addressed
12/15/2023
Objection resolved — Addressed
12/15/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
12/15/2023
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
12/14/2023
Objection raised — Other
12/14/2023
Objection raised — Scope
12/14/2023
Objection raised — Other
12/14/2023
Objection raised — Other
12/14/2023
Objection raised — Other
12/14/2023
Objection raised — Other
12/10/2023
Filed — Alteration CO
Application filed to convert garage into a bedroom on the first floor. No change to bulk and egress is proposed.
Q00974462-I1
12/10/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
12/10/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/10/2023
Special inspection requirement — Fenestration areas
FAHAD FATEH
12/10/2023
Special inspection requirement — Interior lighting power
FAHAD FATEH
12/10/2023
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
12/10/2023
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKM CONTRACTORS, INC02/23/2024
DOB NOWSolarSigned-offGREGORY D. SACHS, PE02/06/2024
BISOTISSUEDATLAS RESTORATION CORP08/12/1999
3 projects · most recent 06/21/2024
General Wiring
FiledStatusContractorScope
06/21/2024CompleteB.D. ELECTRIC INCGeneral Wiring
05/16/2024CompleteB.D. ELECTRIC INCGeneral Wiring
01/26/2024CompleteISLAND ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/22/2024Fail-Final CND-Occupancy InspectionFailView ↗
05/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
12/27/2023Structural Stability – Alterations of existing buildingsRalph Pacificospecial
12/27/2023Fire-Resistant Penetrations and JointsRalph Pacificospecial
12/27/2023FinalRalph Pacificoprogress
12/27/2023Air barrier - visual inspectionRalph Pacificoenergy_progress
12/27/2023Energy Code Compliance InspectionsRalph Pacificoprogress
12/15/2023Maintenance informationFAHAD FATEHenergy_progress
12/15/2023Insulation placement and R valuesFAHAD FATEHenergy_progress
12/10/2023Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
12/10/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
12/10/2023Fenestration areasFAHAD FATEHenergy_progress
12/10/2023Interior lighting powerFAHAD FATEHenergy_progress
12/10/2023Air barrier - visual inspectionFAHAD FATEHenergy_progress
12/10/2023Fenestration air leakageFAHAD FATEHenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q00974462-I1Request digital key ↗
08/23/2026Q00982773-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00974462-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026Q00982773-I1Open ↗
09/01/2026Q00982773-I1Open ↗
08/28/2026Q00974462-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026Q00974462-I1Open ↗
08/13/2026Q00982773-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q00982773-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00974462-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026Q00974462-I1Open ↗
08/13/2026Q00982773-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00982773-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/23/2026Q00974462-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00974462-I1Open ↗