Two family converted from one family
217 BEDFORD PARK BLVD
BRONX · BIN 2017212
💬 Discuss this project
1925Year Built
2.5Stories
B3Building Class
R8Zoning
1,963 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Two family converted from one family · Owner of record: 217 BEDFORD LLC · 2,938 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction50p · 2 filings · 20 docs
Floor 8Under Construction53p · 2 filings · 20 docs
Floor 7Under Construction52p · 2 filings · 20 docs
Floor 6Under Construction52p · 2 filings · 20 docs
Floor 5Under Construction52p · 2 filings · 20 docs
Floor 4Under Construction52p · 2 filings · 20 docs
Floor 3Under Construction57p · 2 filings · 20 docs
Floor 2Under Construction53p · 2 filings · 20 docs
Floor 1Under Construction52p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
217 BEDFORD3907/08/2026
OWNERS REP904/09/2026
KMI404/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/19/2024$1.2M—217 BEDFORD PARK LLC → 217 BEDFORD LLC$637/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER503/21/2026
AE DESIGN SOLUTION1003/21/2026
EXPRESS FILING INC1803/21/2026
LOMBARDO PROFESSIONAL ENGINEERING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UGS UNITED GLAZING SOLGeneral Contractor1007/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor304/09/2026
AG POWER ELECTRIC CORPElectrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
KMI INCGeneral Contractor104/09/2026
A. M. PLUMBING COMPANYPlumbing106/17/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RI CONSULTING SERVICES IN89041405/11/2026
Building Lifecycle
All (136)Filed (25)Permit Issued (16)Signed Off (8)Violation (5)Inspection (13)Objection (36)Special Inspection (30)Tax Incentive (3)
12/30/2026
485-x construction completed
07/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/29/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
06/23/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/18/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Insulation placement and R values
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Maintenance information
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Exterior lighting power
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Air barrier - visual inspection
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Electrical motors and elevators
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Metering
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Interior lighting power
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Air barrier — testing
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Fenestration areas
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Lighting controls
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Fenestration air leakage
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Protection of exposed foundation insulation
Md Istiaque Hasan
05/27/2026
Special inspection requirement — Lighting in dwelling units
Md Istiaque Hasan
05/25/2026
Signed off — New Building
SOE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X01106799-I1.
X01106799-S3
05/12/2026
Signed off — New Building
SOE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X01106799-I1.
X01106799-S2
05/12/2026
Signed off — Alteration
X01277745-I1
05/11/2026
Filed — New Building
SOE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X01106799-I1.
X01106799-P8
05/11/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/23/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01330331-I1
04/23/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01284352-I1
04/23/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01330332-I1
04/21/2026
Objection resolved — Resolved
04/02/2026
Objection raised — Other
04/01/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/23/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01330331-P1
03/23/2026
Objection raised — Energy
03/22/2026
Objection raised — Admin
03/16/2026
Filed — New Building
SOE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X01106799-I1.
X01106799-P7
03/16/2026
Objection resolved — Addressed
03/15/2026
Special inspection requirement — Footing and Foundation
Md Istiaque Hasan
03/15/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Md Istiaque Hasan
03/15/2026
Special inspection requirement — Final
Md Istiaque Hasan
03/15/2026
Special inspection requirement — Deep Foundation Elements
FERAS AYOUB
03/15/2026
Special inspection requirement — Concrete - Cast-In-Place
Md Istiaque Hasan
03/15/2026
Special inspection requirement — Subgrade Inspections
Md Istiaque Hasan
03/13/2026
Filed — New Building
SOE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X01106799-I1.
X01106799-P6
03/13/2026
Special inspection requirement — Maintenance information
Md Istiaque Hasan
03/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Md Istiaque Hasan
03/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Md Istiaque Hasan
03/13/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Md Istiaque Hasan
03/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Md Istiaque Hasan
03/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Md Istiaque Hasan
03/10/2026
Objection resolved — Addressed
03/09/2026
Filed — New Building
SOE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X01106799-I1.
X01106799-P2
03/06/2026
Objection raised — Energy
03/04/2026
Violation issued (ECB, closed)
Construction
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offUGS UNITED GLAZING SOL01/23/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedKMI01/21/2026
DOB NOWMechanical SystemsSigned-offUGS UNITED GLAZING SOL01/14/2026
DOB NOWConstruction FencePermit IssuedUGS UNITED GLAZING SOL01/09/2026
DOB NOWGeneral ConstructionPermit IssuedUGS UNITED GLAZING SOL01/07/2026
DOB NOWGeneral ConstructionPermit IssuedUGS UNITED GLAZING SOL01/06/2026
DOB NOWSprinklersSigned-offA M B MECHANICAL INC12/19/2025
DOB NOWFoundationSigned-offUGS UNITED GLAZING SOL12/17/2025
DOB NOWPlumbingPermit IssuedA. M. PLUMBING COMPANY12/11/2025
DOB NOWSupport of ExcavationSigned-offUGS UNITED GLAZING SOL12/11/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC12/08/2025
DOB NOWSupport of ExcavationSigned-offUGS UNITED GLAZING SOL12/08/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC12/08/2025
DOB NOWFull DemolitionSigned-offUGS UNITED GLAZING SOL10/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC09/11/2025
DOB NOWConstruction FenceSigned-offUGS UNITED GLAZING SOL09/11/2025
BISPLISSUEDT & C MECHANICAL05/19/2004
1 project · most recent 05/11/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/11/2026Signed-offUGS UNITED GLAZING SOLHeating and Air Conditioning Systems
Heat / Cool
Amana PTH153J30 14,400 BTU · Heat Pump Outdoor ×62
1 project · most recent 05/11/2026
Sprinkler System
FiledStatusContractorScope
05/11/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 05/11/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/11/2026Permit IssuedA. M. PLUMBING COMPANYGas, Storm, Water/Sanitary
4 projects · most recent 06/23/2026
General Wiring
FiledStatusContractorScope
06/23/2026CompleteAG POWER ELECTRIC CORPGeneral Wiring
01/08/2026Permit IssuedPOWER DIRECT ELECTRIC INC—
12/11/2025CompleteAG POWER ELECTRIC CORP—
12/08/2025CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 05/11/2026
Concrete
FiledStatusContractorScope
05/11/2026Signed-offUGS UNITED GLAZING SOLConcrete
1 project · most recent 05/11/2026
Fence
FiledStatusContractorScope
05/11/2026Signed-offUGS UNITED GLAZING SOLFence
1 project · most recent 05/11/2026
Earthwork Support of Excavation
FiledStatusContractorScope
05/11/2026Signed-offUGS UNITED GLAZING SOLEarthwork, Support of Excavation
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
07/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/29/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
06/23/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/18/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/11/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/24/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
05/27/2026Fire-Resistant Penetrations and JointsMd Istiaque Hasanspecial
05/27/2026Exterior Insulation and Finish Systems (EIFS)Md Istiaque Hasanspecial
05/27/2026Fire-Resistance Rated ConstructionMd Istiaque Hasanprogress
05/27/2026Energy Code Compliance InspectionsMd Istiaque Hasanprogress
05/27/2026Exterior lighting powerMd Istiaque Hasanenergy_progress
05/27/2026Maintenance informationMd Istiaque Hasanenergy_progress
05/27/2026Air barrier — testing Md Istiaque Hasanenergy_progress
05/27/2026Electrical motors and elevatorsMd Istiaque Hasanenergy_progress
05/27/2026Lighting in dwelling unitsMd Istiaque Hasanenergy_progress
05/27/2026Insulation placement and R valuesMd Istiaque Hasanenergy_progress
05/27/2026Fenestration and door U-factor and product ratingsMd Istiaque Hasanenergy_progress
05/27/2026MeteringMd Istiaque Hasanenergy_progress
05/27/2026Interior lighting powerMd Istiaque Hasanenergy_progress
05/27/2026Fenestration areasMd Istiaque Hasanenergy_progress
05/27/2026Air barrier - visual inspectionMd Istiaque Hasanenergy_progress
05/27/2026Lighting controlsMd Istiaque Hasanenergy_progress
05/27/2026Fenestration air leakageMd Istiaque Hasanenergy_progress
05/27/2026Protection of exposed foundation insulationMd Istiaque Hasanenergy_progress
03/15/2026Subsurface Investigations (Borings/Test Pits)Md Istiaque Hasanspecial
03/15/2026Subgrade InspectionsMd Istiaque Hasanspecial
03/15/2026Concrete - Cast-In-PlaceMd Istiaque Hasanspecial
03/15/2026Deep Foundation ElementsFERAS AYOUBspecial
03/15/2026FinalMd Istiaque Hasanprogress
03/15/2026Footing and FoundationMd Istiaque Hasanprogress
03/13/2026HVAC-R and service water heating equipmentMd Istiaque Hasanenergy_progress
Latest 25 of 76.
▾Documents — 160 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
08/18/2026X01264590-I1Request digital key ↗
08/18/2026X01277745-I1Request digital key ↗
08/18/2026X01106799-P8Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
03/19/2025240361452Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
03/19/2025240361452Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/18/2026X01106799-P2Open ↗
08/18/2026X01106799-I1Open ↗
08/13/2026X01106799-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026X01106799-P2Open ↗
08/13/2026X01106799-P1Open ↗
08/13/2026X01106799-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X01106799-I1Open ↗
08/13/2026X01106799-P2Open ↗
08/13/2026X01106799-P1Open ↗
▸Seals & Professional Certifications84
▸DOB NOWProgress Inspector Seal & Signature42
09/01/2026X01106799-P2Open ↗
09/01/2026X01106799-P2Open ↗
09/01/2026X01106799-P2Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/18/2026X01277745-I1Open ↗
08/18/2026X01106799-S3Open ↗
08/18/2026X01106799-P8Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026X01106799-P2Open ↗
09/01/2026X01106799-P2Open ↗
09/01/2026X01106799-S2Open ↗
Showing 3 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/19/2025240361452Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/19/2025240361452Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026X01264590-I1Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026X01106799-P2Open ↗
08/13/2026X01106799-P1Open ↗
08/13/2026X01106799-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01264590-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X01264590-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X01264590-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01264590-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026X01106799-P1Open ↗
08/13/2026X01106799-I1Open ↗
08/13/2026X01106799-P2Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/19/2025240361452Open ↗
▸BISSTREET TREE CHECKLIST1
03/19/2025240361452Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01106799-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWRodent Control1
08/13/2026X01264590-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01264590-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/18/2026X01106799-S4Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026X01106799-S3Open ↗
08/13/2026X01106799-P4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X01106799-S3Open ↗
▸DOB NOWTR5 Test Report1
08/18/2026X01106799-S3Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
03/19/2025240361452Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/04/2025240361452Open ↗
▸Other Documents16
▸DOB NOWProperty Ownership Certification4
08/18/2026X01106799-P2Open ↗
08/18/2026X01106799-I1Open ↗
08/18/2026X01106799-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026X01106799-P2Open ↗
08/13/2026X01106799-I1Open ↗
08/13/2026X01106799-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X01106799-P2Open ↗
08/13/2026X01106799-P1Open ↗
08/13/2026X01106799-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X01106799-S8Open ↗
08/13/2026X01106799-S3Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/19/2025240361452Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X01264590-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01264590-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01264590-I1Open ↗