← Back
Miscellaneous two family
217 LINCOLN ROAD
BROOKLYN · BIN 3035308
💬 Discuss this project
1901Year Built
2Stories
B9Building Class
R5Zoning
2,704 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 2,050 sf lot · 1.32 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 1 filing · 11 docs
Floor 11p · 1 filing · 11 docs
Cellar1p · 1 filing · 11 docs
Basement3p · 2 filings · 17 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/21/2024$1.9M—— → —$703/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
R M & E PLLC210/22/2024
NY BUILDING ASSOCIATES INC108/23/2024
HENRY NG ARCHITECT107/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS303/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SANTA I CONTRACTING CORPGeneral Contractor303/21/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor203/21/2026
ARANDA PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
R M & E ENGINEERINC PLLC3030109/24/2024
NKM ENGINEERING PLLC6244108/23/2024
Building Lifecycle
All (41)Filed (4)Permit Issued (3)Signed Off (3)Violation (1)Inspection (3)Objection (20)Special Inspection (7)
04/14/2025
Signed off — Alteration
PLUMBING MODIFICATIONS FOR EACH FLOOR IN THE BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01108726-I1
04/01/2025
Signed off — Alteration
ENOVATION OF AN EXISTING TWO-FAMILY TOWNHOUSE, INCLUDING THE CONSTRUCTION OF A NEW KITCHEN ON THE FIRST FLOOR ND THE CONVERSION OF AN EXISTING KITCHENETTE INTO A BATHROOM ON THE SECOND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01082487-I1
03/31/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/31/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/30/2025
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01079518-I1
12/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/20/2024
Permit issued — Plumbing
B01108726-I1-PL
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
REMON YUSSIF
10/22/2024
Filed — Alteration
PLUMBING MODIFICATIONS FOR EACH FLOOR IN THE BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01108726-P1
10/15/2024
Permit issued — General Construction
B01082487-I1-GC
10/02/2024
Objection resolved — Addressed
09/24/2024
Filed — Alteration
PLUMBING MODIFICATIONS FOR EACH FLOOR IN THE BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01108726-I1
09/20/2024
Objection raised — Other
09/20/2024
Objection resolved — Addressed
09/10/2024
Objection resolved — Addressed
09/10/2024
Objection resolved — Addressed
09/10/2024
Objection resolved — Addressed
09/10/2024
Objection resolved — Addressed
09/10/2024
Objection resolved — Addressed
09/10/2024
Objection resolved — Addressed
09/10/2024
Objection resolved — Addressed
09/10/2024
Objection resolved — Addressed
08/28/2024
Permit issued — Solar
B01079518-I1-SL
08/26/2024
Objection raised — Other
08/26/2024
Objection raised — Other
08/26/2024
Objection raised — Scope
08/26/2024
Objection raised — Other
08/26/2024
Objection raised — Other
08/26/2024
Objection raised — Admin
08/23/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01079518-I1
08/16/2024
Objection raised — Scope
08/07/2024
Objection raised — Other
08/07/2024
Objection raised — Other
07/31/2024
Filed — Alteration
ENOVATION OF AN EXISTING TWO-FAMILY TOWNHOUSE, INCLUDING THE CONSTRUCTION OF A NEW KITCHEN ON THE FIRST FLOOR ND THE CONVERSION OF AN EXISTING KITCHENETTE INTO A BATHROOM ON THE SECOND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01082487-I1
07/17/2024
Special inspection requirement — Final
Henry Ng
07/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
07/11/2024
Special inspection requirement — Final
NARESH MAHANGU
07/11/2024
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
07/11/2024
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
07/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
03/31/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP11/20/2024
DOB NOWGeneral ConstructionSigned-offSANTA I CONTRACTING CORP10/15/2024
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC08/28/2024
3 projects · most recent 11/16/2024
General Wiring
FiledStatusContractorScope
11/16/2024CompleteCRESCO ELECTRICAL CORPGeneral Wiring
07/11/2024CompleteBROOKYLN SOLARWORKS, LLC—
05/13/2024CompleteANTONIO CERIELLO ELEC INC2 meters, 2 new_meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/31/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/31/2024Fire-Resistant Penetrations and JointsREMON YUSSIFspecial
07/17/2024FinalHenry Ngprogress
07/11/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
07/11/2024FinalNARESH MAHANGUprogress
07/11/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
07/11/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
07/11/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026B01082487-I1Request digital key ↗
08/24/2026B01079518-I1Request digital key ↗
08/24/2026B01108726-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026B01108726-P1Open ↗
08/13/2026B01079518-I1Open ↗
08/13/2026B01082487-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026B01082487-I1Open ↗
08/24/2026B01108726-I1Open ↗
08/24/2026B01108726-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026B01079518-I1Open ↗
08/28/2026B01079518-I1Open ↗
08/27/2026B01082487-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B01079518-I1Open ↗
08/26/2026B01108726-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B01082487-I1Open ↗
08/24/2026B01108726-P1Open ↗
08/24/2026B01108726-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01079518-I1Open ↗
▸Other Documents3
▸DOB NOWProof of Historic Building3
08/13/2026B01082487-I1Open ↗
08/13/2026B01108726-I1Open ↗
08/13/2026B01108726-P1Open ↗