← Back
STATEN ISLAND
217 MAIN STREET
STATEN ISLAND · BIN 5089269
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
1 Open Violation ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionLandscape
Roof8p · 3 filings · 20 docs
Floor 25p · 2 filings · 20 docs
Floor 13p · 3 filings · 20 docs
Cellar7p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TAORMINA PROPERTIES2203/22/2026
OWNERS REP503/22/2026
MAXIMUM CONTRACTING303/22/2026
TOARMINA PROPERTIES LLC103/22/2026
TADRMINA PROPERTIES LLC A203/22/2026
ADVANCED REAL ESTATE GROU103/22/2026
ADVANCED INVESTMENTS103/22/2026
TAOMINA PROPERTIES703/21/2026
HOUSING PRESERVATION DEVELOPME203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YAKER ENGINEERING, P.C.1111/08/2024
LEON SKVIRSKY PE110/17/2024
LEVIN ENGINEERING PLLC804/24/2024
PAUL PERDEK, PROF. ENG. PLLC206/08/2023
ROGERS CALVANICO GROUP PLLC107/27/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEVIN ENGINEERING PLLC1603/21/2026
BANJI ARCHITECT PC1003/21/2026
BUILDING BROTHERS203/21/2026
RELIABLE EXPEDITING103/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OMNI BUILD INCGeneral Contractor1207/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor603/21/2026
MAXIMUM CONTRACTING INCGeneral Contractor303/21/2026
MEGA PLBG CORPFire Protection207/08/2026
NICE PLUMBING CORPPlumbing207/08/2026
PAUL SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P67381404/24/2024
Building Lifecycle
All (234)Filed (23)Permit Issued (18)Signed Off (13)Violation (60)Inspection (12)Objection (78)Special Inspection (30)
05/07/2026
Violation issued (HPD, open)
A
04/21/2025
Signed off — Alteration
S01068187-I1
04/17/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/10/2025
Permit issued — Curb Cut
S01068187-I1-CC
12/04/2024
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (GOOD LIFE PHARMACY)
S01118686-I1
11/08/2024
Filed — Alteration
S01068187-I1
10/18/2024
Permit issued — Sign
S01118686-I1-SG
10/17/2024
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (GOOD LIFE PHARMACY)
S01118686-I1
06/07/2024
Signed off — Alteration
INSTALLATION OF MECHANICAL SYTEM FOR THE ENTIRE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00784093-I1
05/15/2024
Signed off — Alteration
INSTALLATION OF PLUMBING SYSTEM FOR ENTIRE BUILINDING. NO CHANG IN USE, EGRESS OR OCCUPANCY.
S00784113-I1
05/10/2024
Signed off — Alteration
INSTALLATION OF SPRINKLE AND STANDPIPE SYSTEM FOR ENTIRE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00784069-I1
05/05/2024
Objection resolved — Addressed
05/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
05/03/2024
Special inspection requirement — Maintenance information
anthony santoro
05/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
05/03/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
05/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
05/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
05/01/2024
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
05/01/2024
Objection resolved — Addressed
04/26/2024
Objection raised — Scope
04/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/24/2024
Filed — Alteration
INSTALLATION OF MECHANICAL SYTEM FOR THE ENTIRE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00784093-P1
04/23/2024
Objection raised — Scope
04/19/2024
Filed — Alteration
INSTALLATION OF PLUMBING SYSTEM FOR ENTIRE BUILINDING. NO CHANG IN USE, EGRESS OR OCCUPANCY.
S00784113-P3
04/19/2024
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
04/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
04/19/2024
Special inspection requirement — Shutoff dampers
anthony santoro
04/19/2024
Special inspection requirement — Maintenance information
anthony santoro
04/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
04/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
04/19/2024
Special inspection requirement — Final
anthony santoro
04/19/2024
Special inspection requirement — Mechanical Systems
anthony santoro
04/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
04/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
04/12/2024
Special inspection requirement — Maintenance information
anthony santoro
04/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
04/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
04/12/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
04/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
04/01/2024
Signed off — Alteration
This application is being filed for 8' high construction fence on open space at the subject premises. There is no change in use, egress or occupancy.
S00664224-I1
03/20/2024
Permit issued — Sprinklers
S00784069-I1-PL
03/13/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/13/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/11/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/11/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
02/05/2024
Permit issued — Sprinklers
S00784069-I1-EW-SD
02/05/2024
Permit issued — Sprinklers
S00784069-I1-EW-SP
12/08/2023
Special inspection requirement — Sprinkler Systems
anthony santoro
12/08/2023
Special inspection requirement — Standpipe Systems
anthony santoro
11/29/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00674761-I1
11/16/2023
Filed — Alteration
INSTALLATION OF SPRINKLE AND STANDPIPE SYSTEM FOR ENTIRE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00784069-P1
11/16/2023
Special inspection requirement — Standpipe Systems
11/16/2023
Special inspection requirement — Sprinkler Systems
09/20/2023
Filed — Alteration
INSTALLATION OF PLUMBING SYSTEM FOR ENTIRE BUILINDING. NO CHANG IN USE, EGRESS OR OCCUPANCY.
S00784113-P2
09/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
09/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
09/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
09/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
09/20/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
Latest 60 of 234 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offOMNI BUILD INC04/10/2025
DOB NOWSignSigned-offPAUL SIGNS, INC10/18/2024
DOB NOWSprinklersSigned-offNICE PLUMBING CORP03/20/2024
DOB NOWSprinklersSigned-offREAL PLUMBING CORP02/05/2024
DOB NOWSprinklersSigned-offREAL PLUMBING CORP02/05/2024
DOB NOWMechanical SystemsSigned-offOMNI BUILD INC05/23/2023
DOB NOWConstruction FenceSigned-offOMNI BUILD INC05/23/2023
DOB NOWPlumbingSigned-offNICE PLUMBING CORP04/10/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC02/04/2023
DOB NOWFoundationSigned-offOMNI BUILD INC10/28/2022
DOB NOWFoundationSigned-offOMNI BUILD INC10/27/2022
DOB NOWSupport of ExcavationSigned-offOMNI BUILD INC10/25/2022
DOB NOWStructuralSigned-offOMNI BUILD INC10/06/2022
DOB NOWConstruction FenceSigned-offOMNI BUILD INC05/25/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC02/08/2022
DOB NOWGeneral ConstructionSigned-offOMNI BUILD INC01/31/2022
DOB NOWConstruction FenceSigned-offOMNI BUILD INC01/24/2022
DOB NOWConstruction FenceSigned-offMAXIMUM CONTRACTING INC05/18/2021
BIS—ISSUEDOMNI BUILD INC08/16/2023
BIS—ISSUEDOMNI BUILD INC09/15/2022
BIS—ISSUEDOMNI BUILD INC01/26/2022
BIS—ISSUEDMAXIMUM CONTRACTING INC10/04/2021
BIS—ISSUEDMAXIMUM CONTRACTING INC02/17/2021
BIS—ISSUEDMAXIMUM CONTRACTING INC03/06/2020
BISEQISSUEDRSF BUILDING CORP01/09/2018
BIS—ISSUEDTITAN DEMOLITION & SALVA*01/13/2017
BISEQISSUEDTITAN DEMOLITION & SALVA*01/03/2017
BISEQISSUEDLAKHI GENERAL CONTRACTOR09/26/2002
5 projects · most recent 10/22/2024
General Wiring
FiledStatusContractorScope
10/22/2024CompleteLIMITLESS ELECT RESOURCES—
03/20/2024CompleteFOREST BROOK ELEC'L CONTRGeneral Wiring
06/06/2023CompletePOWER DIRECT ELECTRIC INC—
02/09/2022CompleteV. VASS ELECTRIC CORP—
02/01/2022CompleteFOREST BROOK ELEC'L CONTR1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/17/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/01/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
04/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/13/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/13/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/11/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/11/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/19/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/30/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/02/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/16/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
05/03/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
05/03/2024HVAC-R and service water piping design and insulationanthony santoroenergy_progress
05/03/2024Maintenance informationanthony santoroenergy_progress
05/03/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
05/03/2024HVAC-R and service water heating system controlsanthony santoroenergy_progress
05/03/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
04/19/2024Shutoff dampersanthony santoroenergy_progress
04/19/2024Duct leakage testing, insulation and designanthony santoroenergy_progress
04/19/2024Mechanical Systemsanthony santorospecial
04/19/2024Finalanthony santoroprogress
04/19/2024HVAC-R and service water heating system controlsanthony santoroenergy_progress
04/19/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
04/19/2024HVAC-R and service water piping design and insulationanthony santoroenergy_progress
04/19/2024Maintenance informationanthony santoroenergy_progress
04/19/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
04/12/2024HVAC-R and service water piping design and insulationanthony santoroenergy_progress
04/12/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
04/12/2024Maintenance informationanthony santoroenergy_progress
04/12/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
04/12/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
04/12/2024HVAC-R and service water heating system controlsanthony santoroenergy_progress
12/08/2023Standpipe Systemsanthony santorospecial
12/08/2023Sprinkler Systemsanthony santorospecial
11/16/2023Sprinkler Systems—special
11/16/2023Standpipe Systems—special
Latest 25 of 71.
▾Documents — 347 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch20
08/24/2026S00664224-I1Request digital key ↗
08/24/2026S00664224-P1Request digital key ↗
08/24/2026S00664228-P2Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026S00376140-I1Request digital key ↗
▸Applications & Permits49
▸BISPLAN / WORK APPROVAL APPLICATION37
03/18/2025520358078Open ↗
08/23/2024520358078Open ↗
08/07/2024520358078Open ↗
Showing 3 of 37 on file for this type
▸BISWORK PERMIT APPLICATION6
09/16/2022520358078Open ↗
02/10/2022520358078Open ↗
03/10/2020520358078Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
05/28/2024540215925Open ↗
07/25/2022540215925Open ↗
Showing 2 of 3 on file for this type
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb2
07/25/2022540215925Open ↗
Showing 1 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/17/2022520358078Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM2
04/10/2019520358078Open ↗
Showing 1 of 2 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
01/25/2024520468128Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
01/25/2024520468128Open ↗
04/19/2019520358078Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/25/2024520468128Open ↗
▸BISVERIFY TAX LOT1
05/15/2024520358078Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/16/2024520358078Open ↗
▸Seals & Professional Certifications64
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/24/2026S00664228-P2Open ↗
08/24/2026S00664228-I1Open ↗
08/24/2026S00674761-P1Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
03/10/2020520358078Open ↗
02/19/2020520358078Open ↗
04/19/2019520358078Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/25/2026S00770881-I1Open ↗
09/23/2026S00784069-I1Open ↗
09/01/2026S00783982-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026S00783982-I1Open ↗
09/01/2026S00780049-P1Open ↗
09/01/2026S00780049-P1Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/24/2022540215925Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/24/2022540215925Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
04/09/2019520358078Open ↗
09/14/2018520358078Open ↗
Showing 2 of 4 on file for this type
▸BISSEWER CUT-OFF1
01/13/2017520203486Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/21/2024520358078Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/23/2024520358078Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
06/23/2024520358078Open ↗
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026S00784069-P1Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST3
06/21/2023540215925Open ↗
07/25/2022540215925Open ↗
Showing 2 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
01/13/2017520203486Open ↗
01/13/2017520203486Open ↗
▸BISTENANT PROTECTION PLAN1
08/08/2024520358078Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
08/08/2024520358078Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/22/2026S00784113-P1Open ↗
08/22/2026S00784113-P2Open ↗
08/15/2026S00784093-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)1
10/05/2016520203486Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/10/2020520358078Open ↗
02/19/2020520358078Open ↗
04/09/2019520358078Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/21/2024520358078Open ↗
06/03/2022520358078Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026S00784113-I1Open ↗
08/13/2026S00784093-I1Open ↗
▸BISFENESTRATION AREAS1
05/21/2024520358078Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
05/21/2024520358078Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00784093-I1Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/21/2024520358078Open ↗
05/21/2024520358078Open ↗
06/03/2022520358078Open ↗
Showing 3 of 5 on file for this type
▸BISBORINGS / TEST PITS (TR-4) 27-7204
04/19/2019520358078Open ↗
04/19/2019520358078Open ↗
04/19/2019520358078Open ↗
Showing 3 of 4 on file for this type
▸BISSoils - Investigations (Borings/Test Pits) - 2008 CODE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTRUCTURAL STEEL - WELDING2
05/21/2024520358078Open ↗
05/21/2024520358078Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection2
05/24/2022540215925Open ↗
Showing 1 of 2 on file for this type
▸BISMASONRY1
05/21/2024520358078Open ↗
▸BISSOIL PERCOLATE TEST-SEPTIC RS16-P113.91
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
05/21/2024520358078Open ↗
▸Approvals, Objections & Sign-offs40
▸BISLETTERS - SUPPORTING DOCUMENTATION20
08/08/2024520358078Open ↗
06/24/2024520208034Open ↗
01/25/2024520468128Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
08/23/2024520358078Open ↗
06/20/2024520358078Open ↗
06/20/2024520358078Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
09/14/2018520358078Open ↗
Showing 1 of 5 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff3
05/28/2024540215925Open ↗
07/26/2022540215925Open ↗
Showing 2 of 3 on file for this type
▸BISLANDMARKS APPROVAL1
01/13/2017520203486Open ↗
▸BISBSA/CPC APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership8
▸BISPROJECT-SPECIFIC GL INSURANCE5
09/16/2022520358078Open ↗
02/11/2022520358078Open ↗
03/10/2020520358078Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT2
09/14/2018520358078Open ↗
Showing 1 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/31/2025520358078Open ↗
▸Filing & Intake Forms26
▸BISADDITIONAL INFORMATION16
03/19/2025520358078Open ↗
05/28/2024540215925Open ↗
04/05/2024520358078Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET5
01/03/2024520468128Open ↗
09/14/2018520358078Open ↗
Showing 2 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
01/03/2024520468128Open ↗
04/16/2019520358078Open ↗
04/09/2019520358078Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
05/24/2022540215925Open ↗
Showing 1 of 2 on file for this type
▸Other Documents26
▸DOB NOWPlot Diagram5
08/24/2026S00780049-I1Open ↗
08/13/2026S00783982-I1Open ↗
08/13/2026S00770881-I1Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTCO - Supporting Documents3
04/02/2025520358078Open ↗
08/09/2024520358078Open ↗
07/08/2024520358078Open ↗
▸BISPLOT DIAGRAM3
05/13/2024520358078Open ↗
11/15/2018520358078Open ↗
Showing 2 of 3 on file for this type
▸BISSITE CONNECTION: DEP2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
05/24/2022540215925Open ↗
05/24/2022540215925Open ↗
▸BISVESTIBULES1
05/21/2024520358078Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
05/21/2024520358078Open ↗
▸BISMAINTENANCE INFORMATION1
05/21/2024520358078Open ↗
▸BISUPDATED SITE CONNECTION PROPOSAL1
08/05/2024520358078Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00770881-I1Open ↗