← Back
Zoned commercial or Manhattan residential
217 WEST 123 STREET
MANHATTAN · Harlem (South) · BIN 1058625
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R7AZoning
0 sfGross Floor Area
0Units
Rent Stabilized12 Open Violations ▸
Zoned commercial or Manhattan residential · Owner of record: 217 WEST 123 LLC · 2,523 sf lot · 0 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Floor 61p · 1 filing · 2 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exterior3 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VENTURE 1231107/08/2026
OWNERS REP704/09/2026
HITECH403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/03/2024$1.9M—— → —— not available
09/25/2015$630K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1403/21/2026
AE DESIGN SOLUTION603/21/2026
DOMINION EXPEDITING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOUCHSTONE HOMES LLCGeneral Contractor707/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor304/09/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
BLUE SHINE BUILDERS INCGeneral Contractor204/09/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394212/12/2024
Building Lifecycle
All (93)Filed (11)Permit Issued (15)Signed Off (8)Violation (24)Inspection (9)Objection (8)Special Inspection (15)Tax Incentive (3)
06/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/01/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/01/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/29/2025
Signed off — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE.
M01067631-S2
04/25/2025
Signed off — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE.
M01067631-S1
03/24/2025
Signed off — Alteration
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #123112648.
M01060346-S1
03/03/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/01/2025
421-a(16) construction completed
02/24/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
01/10/2025
Permit issued — Standpipe
M01067631-S2-EW-SD
01/07/2025
Signed off — Alteration
M00269281-I1
01/07/2025
Signed off — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE.
M01067631-I1
12/31/2024
Inspection — Pass-Final House Connection
Pass
View inspection ↗
12/27/2024
Permit issued — Plumbing
M01067631-S1-PL
12/26/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01100434-I1
12/26/2024
Signed off — Alteration
M01110612-I1
12/26/2024
Signed off — Alteration
M01100428-I1
12/12/2024
Filed — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE.
M01067631-S2
12/10/2024
Filed — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE.
M01067631-S1
12/10/2024
Permit issued — Construction Fence
M01067631-I1-FN
12/10/2024
Special inspection requirement — Post-installed Anchors
Paul Raymond
12/10/2024
Special inspection requirement — Standpipe Systems
Paul Raymond
12/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
11/18/2024
Permit issued — Protection and Mechanical Methods
M01110612-I1-PMM
11/07/2024
Violation issued (ECB, closed)
Construction
11/07/2024
Violation issued (ECB, closed)
Unknown
11/07/2024
Violation issued (ECB, closed)
Construction
10/28/2024
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
10/28/2024
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
10/15/2024
Permit issued — Standpipe
M01060346-S1-EW-SD
10/10/2024
Violation issued (ECB, closed)
Unknown
10/10/2024
Violation issued (ECB, closed)
Unknown
10/10/2024
Violation issued (ECB, closed)
Unknown
09/16/2024
Filed — Alteration
M01110612-I1
08/29/2024
421-a(16) registration filed
08/22/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01100434-I1
08/22/2024
Filed — Alteration
M01100428-I1
08/22/2024
Permit issued — Supported Scaffold
M01100434-I1-SF
08/22/2024
Permit issued — Sidewalk Shed
M01100428-I1-SH
08/01/2024
Permit issued — Construction Fence
M00269281-I1-FN
07/22/2024
Objection resolved — Addressed
07/17/2024
Objection raised — Other
07/17/2024
Objection resolved — Addressed
07/17/2024
Objection resolved — Addressed
07/15/2024
Filed — Alteration
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #123112648.
M01060346-S2
07/15/2024
Objection raised — Scope
07/15/2024
Objection raised — Scope
07/12/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/12/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
07/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/12/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/08/2024
Filed — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE.
M01067631-P1
06/25/2024
Objection raised — Inspections
06/20/2024
Filed — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE.
M01067631-I1
06/19/2024
Filed — Alteration
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #123112648.
M01060346-S1
06/07/2024
Special inspection requirement — Post-installed Anchors
Paul Raymond
06/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/06/2024
Objection raised — Scope
06/06/2024
Special inspection requirement — Standpipe Systems
Paul Raymond
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offA M B MECHANICAL INC01/10/2025
DOB NOWPlumbingSigned-offMES CONSTRUCTION CORP12/27/2024
DOB NOWConstruction FenceSigned-offBLUE SHINE BUILDERS INC12/10/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC11/18/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC10/15/2024
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC08/22/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC08/22/2024
DOB NOWConstruction FenceSigned-offBLUE SHINE BUILDERS INC08/01/2024
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC04/12/2022
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC05/12/2021
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC03/01/2021
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC12/21/2020
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC05/04/2020
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC02/14/2020
DOB NOWConstruction FenceSigned-offTOUCHSTONE HOMES LLC11/21/2019
BIS—ISSUEDBLUE SHINE BUILDERS INC11/13/2024
BIS—ISSUEDBLUE SHINE BUILDERS INC11/13/2024
BIS—ISSUEDBLUE SHINE BUILDERS INC08/15/2024
BIS—ISSUEDBLUE SHINE BUILDERS INC08/15/2024
BISPLISSUEDA. M. PLUMBING COMPANY08/08/2024
BISEQISSUEDBLUE SHINE BUILDERS INC07/30/2024
BIS—ISSUEDBLUE SHINE BUILDERS INC07/29/2024
BIS—ISSUEDBLUE SHINE BUILDERS INC07/26/2024
BISEQISSUEDDEEP FORMATION INC05/20/2024
BIS—ISSUEDDEEP FORMATION INC10/04/2023
BIS—ISSUEDDEEP FORMATION INC10/04/2023
BISEQISSUEDDEEP FORMATION INC05/23/2023
BIS—ISSUEDDEEP FORMATION INC11/15/2022
BIS—ISSUEDDEEP FORMATION INC11/15/2022
BIS—ISSUEDDEEP FORMATION INC09/12/2022
BIS—ISSUEDDEEP FORMATION INC09/12/2022
BIS—ISSUEDDEEP FORMATION INC06/06/2022
BIS—ISSUEDDEEP FORMATION INC06/06/2022
BIS—ISSUEDDEEP FORMATION INC05/31/2022
BISEQISSUEDDEEP FORMATION INC05/26/2022
1 project · most recent 07/15/2024
Storm Water/Sanitary
FiledStatusContractorScope
07/15/2024——Storm, Water/Sanitary
4 projects · most recent 02/12/2025
General Wiring
FiledStatusContractorScope
02/12/2025CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
09/18/2024CompleteSOLAS ELECTRICAL CORP—
09/06/2024CompleteINTELOGIC ELECTRIC, INC.General Wiring
08/08/2024CompleteHIVOLTS ELECTRICAL INC—
1 project · most recent 07/15/2024
FiledStatusContractorScope
07/15/2024Signed-offA M B MECHANICAL INC1 scope_items
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/24/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
12/31/2024Pass-Final House ConnectionPassView ↗
10/28/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
10/28/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
12/10/2024Post-installed AnchorsPaul Raymondspecial
12/10/2024Standpipe SystemsPaul Raymondspecial
12/10/2024Fire-Resistant Penetrations and JointsPaul Raymondspecial
07/12/2024Excavations - Sheeting, Shoring, and Bracing—special
07/12/2024Subsurface Conditions – Fill Placement & In-Place Density—special
07/12/2024Structural Stability – Alterations of existing buildings—special
07/12/2024Subsurface Investigations (Borings/Test Pits)—special
06/07/2024Post-installed AnchorsPaul Raymondspecial
06/07/2024Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/06/2024Standpipe SystemsPaul Raymondspecial
06/03/2024HVAC-R and service water heating equipment—energy_progress
06/03/2024HVAC-R and service water piping design and insulation—energy_progress
06/03/2024Maintenance information—energy_progress
06/03/2024HVAC-R and service water heating system controls—energy_progress
06/03/2024Fire-Resistant Penetrations and Joints—special
▾Documents — 307 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch10
08/27/2026M01067631-S2Request digital key ↗
08/27/2026M01067631-I1Request digital key ↗
08/27/2026M01067631-S1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00269281-I1Request digital key ↗
▸Applications & Permits55
▸BISPLAN / WORK APPROVAL APPLICATION32
06/12/2025123741175Open ↗
04/21/2025123112648Open ↗
04/01/2025123112648Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION23
12/05/2024123112648Open ↗
11/13/2024123112648Open ↗
11/13/2024123112648Open ↗
Showing 3 of 23 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/26/2026M01100428-I1Open ↗
08/26/2026M01110612-I1Open ↗
08/13/2026M01067631-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026M01060346-S1Open ↗
08/27/2026M01060346-S1Open ↗
08/27/2026M01060346-S1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Trade Schedules & Equipment20
▸BISSCHEDULE B - PLUMBING9
01/09/2025123112648Open ↗
12/17/2024123112648Open ↗
12/13/2024123112648Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISHEATING SYSTEMS2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISSPRINKLER SYSTEMS2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸Safety & Tenant Protection11
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREE CHECKLIST3
09/11/2024141026093Open ↗
Showing 1 of 3 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
01/08/2025123112648Open ↗
01/08/2025123112648Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/25/2022123112648Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance28
▸BISELECTRICAL ENERGY CONSUMPTION2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISEXTERIOR LIGHTING POWER2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISFENESTRATION AIR LEAKAGE2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISINTERIOR LIGHTING POWER2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISFENESTRATION AREAS2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/25/2024123112648Open ↗
05/25/2022123112648Open ↗
▸BISINSULATION PLACEMENT & R VALUES2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISLIGHTING IN DWELLING UNITS2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISLIGHTING CONTROLS2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BIS* HVAC INSULATION AND SEALING2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/11/2024141026093Open ↗
07/25/2024123112648Open ↗
05/25/2022123112648Open ↗
Showing 3 of 4 on file for this type
▸BISMECHANICAL SYSTEMS2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
12/16/2024123112648Open ↗
05/25/2022123112648Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
01/08/2025123112648Open ↗
01/08/2025123112648Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION2
01/08/2025123112648Open ↗
01/08/2025123112648Open ↗
▸BISMASONRY2
01/08/2025123112648Open ↗
01/08/2025123112648Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
04/23/2025123112648Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M01060346-S2Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026M01060346-S2Open ↗
▸Approvals, Objections & Sign-offs27
▸BISSUPERSEDING LETTER12
11/13/2024123112648Open ↗
11/13/2024123112648Open ↗
11/13/2024123112648Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
12/17/2024123112648Open ↗
05/14/2020123112648Open ↗
Showing 2 of 3 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership18
▸BISPROJECT-SPECIFIC GL INSURANCE15
11/13/2024123112648Open ↗
11/13/2024123112648Open ↗
11/13/2024123112648Open ↗
Showing 3 of 15 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
08/15/2024123112648Open ↗
08/15/2024123112648Open ↗
08/15/2024123112648Open ↗
▸Filing & Intake Forms32
▸BISADDITIONAL INFORMATION15
02/03/2025123112648Open ↗
01/27/2025123112648Open ↗
01/08/2025123112648Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM9
12/11/2024123112648Open ↗
11/13/2024123112648Open ↗
11/13/2024123112648Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/15/2024141026093Open ↗
▸Other Documents28
▸BISBPP - SUPPORTING DOCUMENTATION5
04/25/2025141026093Open ↗
04/25/2025141026093Open ↗
04/25/2025141026093Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM2
06/20/2024123112648Open ↗
Showing 1 of 2 on file for this type
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISCHIMNEYS AND VENTS2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISSMOKE CONTROL SYSTEMS2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHUTOFF DAMPERS2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISVESTIBULES2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISMAINTENANCE INFORMATION2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION2
01/22/2025123112648Open ↗
01/22/2025123112648Open ↗