← Back
Walk-up apt, over six families with stores
217 WEST 135 STREET
MANHATTAN · Harlem (North) · BIN 1058884
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
R7-2Zoning
25,620 sfGross Floor Area
19Units
Rent Stabilized26 Open Violations 24 unresolved · 2 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: NEW PARQUE, INC. · 7,500 sf lot · 3.42 FAR built · Flood zone X
Locations of Work
Architecture
Floor 52p · 1 filing · 11 docs
Floor 42p · 1 filing · 11 docs
Floor 32p · 1 filing · 11 docs
Floor 22p · 1 filing · 11 docs
Floor 12p · 1 filing · 3 docs
Cellar2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MANAGEMENT508/20/2026
CITY OF NEW YORK HPD203/21/2026
P & G REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PINNER ARCHITECTURE PLLC202/06/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRANCHISE INTERIOR DEVELOGeneral Contractor208/20/2026
ALL WAYS ELECTRIC CORP.WElectrical103/22/2026
JIMENEZ LUISElectrical103/21/2026
KOSTANDINOS TSOUKANTASElectrical103/21/2026
LUIS JIMENEZElectrical103/21/2026
RICHARD ESPOSITOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PINNER ARCHITECTURE4739108/05/2025
Building Lifecycle
All (75)Filed (2)Permit Issued (2)Signed Off (1)Violation (60)Inspection (1)Special Inspection (9)
08/18/2026
Permit issued — General Construction
M01299316-I1-GC
07/01/2026
Violation issued (HPD, closed)
A
07/01/2026
Violation issued (HPD, open)
A
04/27/2026
Signed off — Alteration
RESTORE APARTMENTS #D2, D3, D4, D5 TO PRE FIRE/WATER DAMAGE CONDITION. REPAIRS TO HALLWAY FLOOR AND STAIR TREADS.
M01259172-I1
02/06/2026
Filed — Alteration
M01299316-I1
02/05/2026
Special inspection requirement — Final
Lawrence pinner
01/26/2026
Violation issued (HPD, open)
B
01/26/2026
Violation issued (HPD, open)
A
10/31/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/08/2025
Permit issued — General Construction
M01259172-I1-GC
08/15/2025
Violation issued (ECB, closed)
Construction
08/05/2025
Filed — Alteration
RESTORE APARTMENTS #D2, D3, D4, D5 TO PRE FIRE/WATER DAMAGE CONDITION. REPAIRS TO HALLWAY FLOOR AND STAIR TREADS.
M01259172-I1
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lawrence pinner
08/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
Lawrence pinner
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Lawrence pinner
08/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
Lawrence pinner
08/04/2025
Special inspection requirement — Interior lighting power
Lawrence pinner
08/04/2025
Special inspection requirement — Lighting controls
Lawrence pinner
08/04/2025
Special inspection requirement — Lighting in dwelling units
Lawrence pinner
07/21/2025
Special inspection requirement — Final
Lawrence pinner
07/18/2025
Violation issued (HPD, closed)
C
07/18/2025
Violation issued (HPD, closed)
A
07/18/2025
Violation issued (HPD, closed)
A
07/18/2025
Violation issued (HPD, closed)
C
06/16/2025
Violation issued (HPD, closed)
I
06/16/2025
Violation issued (HPD, closed)
I
06/16/2025
Violation issued (HPD, closed)
I
06/16/2025
Violation issued (HPD, closed)
I
06/03/2025
Violation issued (HPD, open)
B
06/03/2025
Violation issued (HPD, open)
B
06/03/2025
Violation issued (HPD, closed)
C
06/03/2025
Violation issued (HPD, closed)
C
06/03/2025
Violation issued (HPD, open)
C
06/03/2025
Violation issued (HPD, closed)
C
06/03/2025
Violation issued (HPD, closed)
C
06/03/2025
Violation issued (HPD, closed)
C
06/03/2025
Violation issued (HPD, open)
B
06/03/2025
Violation issued (HPD, closed)
C
05/31/2025
Violation issued (ECB, closed)
Construction
05/31/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/31/2025
Violation issued (ECB, closed)
Construction
12/16/2024
Violation issued (HPD, closed)
B
12/16/2024
Violation issued (HPD, closed)
C
11/23/2024
Violation issued (HPD, closed)
B
11/23/2024
Violation issued (HPD, closed)
B
11/23/2024
Violation issued (HPD, closed)
B
11/23/2024
Violation issued (HPD, closed)
C
11/23/2024
Violation issued (HPD, closed)
B
11/23/2024
Violation issued (HPD, closed)
B
11/23/2024
Violation issued (HPD, closed)
B
10/08/2022
Violation issued (HPD, open)
B
08/10/2022
Violation issued (HPD, open)
C
08/10/2022
Violation issued (HPD, open)
C
04/27/2020
Violation issued (ECB, closed)
Boilers
10/10/2018
Violation issued (HPD, closed)
I
03/14/2018
Violation issued (HPD, open)
A
10/02/2015
Violation issued (HPD, closed)
I
05/28/2014
Violation issued (HPD, closed)
C
05/28/2014
Violation issued (HPD, closed)
C
01/05/2014
Violation issued (HPD, closed)
B
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFRANCHISE INTERIOR DEVELO08/18/2026
DOB NOWGeneral ConstructionSigned-offFRANCHISE INTERIOR DEVELO10/08/2025
BISPLISSUEDBARMOR REHAB INC08/08/2002
BISPLISSUEDLINDEN PLMBNG. & HTNG CO02/04/1993
BISEQISSUEDCORRALERO CONSTRUCTION CORP.06/17/1992
BIS—ISSUEDCORRALERO CONST. CORP C/ODCOCP.M04/16/1992
2 projects · most recent 05/05/2026
General Wiring
FiledStatusContractorScope
05/05/2026CompleteKET ELECTRIC LLCGeneral Wiring
06/02/2025Permit IssuedALL WAYS ELECTRIC CORP.W—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/31/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
02/05/2026FinalLawrence pinnerprogress
08/04/2025Fire-Resistant Penetrations and JointsLawrence pinnerspecial
08/04/2025Tenant Protection Plan ComplianceLawrence pinnerspecial
08/04/2025Energy Code Compliance InspectionsLawrence pinnerprogress
08/04/2025Fire-Resistance Rated ConstructionLawrence pinnerprogress
08/04/2025Interior lighting powerLawrence pinnerenergy_progress
08/04/2025Lighting controlsLawrence pinnerenergy_progress
08/04/2025Lighting in dwelling unitsLawrence pinnerenergy_progress
07/21/2025FinalLawrence pinnerprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026M01259172-I1Request digital key ↗
08/19/2026M01299316-I1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M01259172-I1Open ↗
09/01/2026M01259172-I1Open ↗
09/01/2026M01259172-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/22/2026M01259172-I1Open ↗
08/19/2026M01299316-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M01259172-I1Open ↗
09/01/2026M01259172-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/22/2026M01259172-I1Open ↗