Condo, residential tower (mixed-use, multi-family elevator) [derived]
Dance Condominium
217 WEST 19 STREET · BIN 1013977
💬 Discuss this project
2002Year Built
11Stories
RMBuilding Class
C6-2AZoning
50,790 sfGross Floor Area
13Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: THE DANCE BUILDING CONDOMINIUM · 7,500 sf lot · 6.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof5p · 3 filings · 20 docs
Floor 89p · 2 filings · 20 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Under Construction4p · 1 filing · 8 docs
Floor 21p · 1 filing · 13 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INTERSYSTEM INSTALLATION CORP2907/08/2026
DANCE BUILDING CONDOMINIUM1307/08/2026
ARGO REAL ESTATE507/08/2026
DANCE CONDO907/08/2026
K.J. REMOLDELING OF NY CO103/22/2026
GENERAL PROPERTY MANAGEMENT403/22/2026
219 W 19TH ST. DEVELOPMENT LLC6703/21/2026
TAUBT MANAGEMENT703/21/2026
2219 WEST 19TH STREET203/21/2026
219 W 19TH ST DEVEL203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC1203/21/2026
AGOUTI CONSTRUCTION CONSULTING503/21/2026
T C ENTERPRISES1203/21/2026
BOYD CONSULTING403/21/2026
NEW YORK ENGINEERING303/21/2026
JENNY FLORES EXPEDITING103/21/2026
CONVERSANO ASSOCIATES, INC.603/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERSYSTEM INSTALLATIONGeneral Contractor807/08/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor707/08/2026
STIVAN PLBG & HTG INCPlumbing503/22/2026
PERFORMANCE MECHANCIALGeneral Contractor403/21/2026
LOUIS DEMICHELEElectrical303/21/2026
AIRTRONICS AIR COND CORPGeneral Contractor303/21/2026
ALL AROUND ELECTRICGeneral Contractor303/22/2026
M&A PROJECTS RESTORATION*General Contractor207/08/2026
NY CITY PLUMBER CORPPlumbing207/08/2026
MC CONSTRUCTION CONSULTING INCGeneral Contractor207/08/2026
ABILENE INCGeneral Contractor203/21/2026
SECON BUILDERS INCGeneral Contractor107/08/2026
SPIRE SCAFFOLDING & HOISTGeneral Contractor107/08/2026
THE METRO GROUP, INCGeneral Contractor107/08/2026
BROOK PLUMBING & HTG CORPPlumbing107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
TM SELECT ELECTRIC CORPElectrical103/22/2026
ENOBRAC PLUMBING, INCFire Protection107/08/2026
M & A PROJECTS INCGeneral Contractor107/08/2026
BROOK PLUMBING & HTG CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GILSANZ MURRAY STEFICEK240102/13/2026
YORKOS ENGINEERING, DESIG6991506/12/2025
ROBERT F. GERMAIN JR. PE5100103/04/2025
CENTURY TESTING & CONSULT4081112/17/2024
MELONE ARCHITECTS2944210/28/2024
NEW YORK ENGINEERING ASSO851306/20/2024
ROSINI ENGINEERING, PC3282211/21/2022
INTEGRITY CONSULTING SERV666311/21/2022
TSS ENGINEERS4492112/02/2020
Building Lifecycle
All (192)Filed (30)Permit Issued (25)Signed Off (20)Facade (FISP) (12)Violation (41)Inspection (14)Objection (20)Special Inspection (30)
06/11/2026
Objection resolved — Resolved
06/01/2026
Objection resolved — Resolved
05/28/2026
Permit issued — General Construction
M00941051-I1-GC
05/08/2026
Signed off — Alteration
Gut-rehab of a single 2,240 SF condo unit located on the 9th fl in a 13 unit bldg. Work includes, new partitions, baths and kitchen. Exterior perimeter walls, N.I.C. and existing concrete plank floor and ceiling shall not be disturbed, N.I.C.
M01154318-I1
05/01/2026
Cycle 10 facade report signed — SAFE
04/30/2026
Cycle 10 facade inspection completed
03/25/2026
Cycle 10 facade report submitted
03/11/2026
Objection raised — Scope
03/11/2026
Objection raised — Other
02/13/2026
Filed — Alteration
STRUCTURAL WORK IN CONJUNCTION WITH NEW NEW STAIR AND BULKHEAD AT EXISTING SKYLIGHT OPENING, AS PER PLANS FILED HEREWITH.
M00941051-S1
02/12/2026
Special inspection requirement — Final
Sunil Bald
02/11/2026
Filed — Alteration
STRUCTURAL WORK IN CONJUNCTION WITH NEW NEW STAIR AND BULKHEAD AT EXISTING SKYLIGHT OPENING, AS PER PLANS FILED HEREWITH.
M00941051-P1
02/04/2026
Special inspection requirement — Structural Steel - Welding
02/04/2026
Special inspection requirement — Final
02/04/2026
Special inspection requirement — Structural Steel - Details
02/04/2026
Special inspection requirement — Post-installed Anchors
02/04/2026
Special inspection requirement — Sprayed fire-resistant materials
02/04/2026
Special inspection requirement — Concrete - Cast-In-Place
01/29/2026
Special inspection requirement — Final
Sunil Bald
01/28/2026
Signed off — Alteration
M01122971-I1
09/23/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/05/2025
Signed off — Alteration
SPRINKLER MODIFICATIONS TO INCLUDE THE REMOVAL AND INSTALLATION OF SPRINKLER HEADS AND PIPING ASSOCIATED WITH THE INTERIOR RENOVATION OF APARTMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY, USE OR EGRESS UNDER THIS APPLICATION
M01164056-I1
08/01/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/30/2025
Signed off — Alteration
MODIFICATION TO EXISTING MECHANICAL SYSTEM ASSOCIATED WITH INTERIOR RENOVATION OF APARTMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY, USE OR EGRESS UNDER THIS APPLICATION.
M01164050-I1
07/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/30/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
07/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
BALTU YORKOS
07/22/2025
Special inspection requirement — Sprinkler Systems
BALTU YORKOS
07/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BALTU YORKOS
07/14/2025
Signed off — Alteration
PLUMBING MODIFICATION ASSOCIATED WITH INTERIOR RENOVATION OF APARTMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY, USE OR EGRESS FILED UNDER THIS APPLICATION.
M01164052-I1
07/08/2025
Objection resolved — Addressed
06/30/2025
Objection raised — Admin
06/26/2025
Signed off — Alteration
REPLACEMENT (1) NEW COOLING TOWER ON THE ROOF. REUSE EXISTING SUPPORTS. NEW VIBRATION ISOLATOR. SAME LOCATION AS PREVIOUSLY EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M01179771-I1
06/12/2025
Filed — Alteration
SPRINKLER MODIFICATIONS TO INCLUDE THE REMOVAL AND INSTALLATION OF SPRINKLER HEADS AND PIPING ASSOCIATED WITH THE INTERIOR RENOVATION OF APARTMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY, USE OR EGRESS UNDER THIS APPLICATION
M01164056-P1
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BALTU YORKOS
06/11/2025
Special inspection requirement — Sprinkler Systems
BALTU YORKOS
06/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
BALTU YORKOS
06/03/2025
Permit issued — General Construction
M00941051-I1-GC
05/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2025
Special inspection requirement — Energy Code Compliance Inspections
BALTU YORKOS
04/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BALTU YORKOS
04/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
BALTU YORKOS
04/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BALTU YORKOS
04/16/2025
Signed off — Alteration
M01136397-I1
04/15/2025
Signed off — Alteration
M01136385-I1
04/15/2025
Filed — Alteration
PLUMBING MODIFICATION ASSOCIATED WITH INTERIOR RENOVATION OF APARTMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY, USE OR EGRESS FILED UNDER THIS APPLICATION.
M01164052-P1
04/15/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01129977-I1
04/10/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/25/2025
Permit issued — Sprinklers
M01164056-I1-EW-SP
03/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/20/2025
Permit issued — Mechanical Systems
M01179771-I1-MS
03/19/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/18/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
03/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/04/2025
Filed — Alteration
REPLACEMENT (1) NEW COOLING TOWER ON THE ROOF. REUSE EXISTING SUPPORTS. NEW VIBRATION ISOLATOR. SAME LOCATION AS PREVIOUSLY EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M01179771-I1
02/27/2025
Permit issued — Plumbing
M01164052-I1-PL
02/24/2025
Objection resolved — Addressed
02/24/2025
Objection resolved — Addressed
Latest 60 of 192 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMC CONSTRUCTION CONSULTING INC05/28/2026
DOB NOWGeneral ConstructionPermit IssuedMC CONSTRUCTION CONSULTIN06/03/2025
DOB NOWSprinklersSigned-offSHARP PLUMBING CORP03/25/2025
DOB NOWMechanical SystemsSigned-offTHE METRO GROUP, INC03/20/2025
DOB NOWPlumbingSigned-offBROOK PLUMBING & HTG CORP02/27/2025
DOB NOWMechanical SystemsSigned-offAIRTRONICS AIR COND CORP02/14/2025
DOB NOWGeneral ConstructionSigned-offSECON BUILDERS INC01/14/2025
DOB NOWGeneral ConstructionSigned-offM&A PROJECTS RESTORATION*11/22/2024
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEMS INSTAL S&S11/06/2024
DOB NOWSupported ScaffoldSigned-offINTERSYSTEMS INSTAL S&S11/06/2024
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S10/24/2024
DOB NOWBoiler EquipmentSigned-offNY CITY PLUMBER CORP07/01/2024
DOB NOWGeneral ConstructionSigned-offABILENE INC07/01/2024
DOB NOWPlumbingSigned-offNY CITY PLUMBER CORP07/01/2024
DOB NOWGeneral ConstructionSigned-offM & A PROJECTS INC02/08/2023
DOB NOWGeneral ConstructionSigned-offM&A PROJECTS RESTORATION*08/02/2022
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION06/01/2022
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEM INSTALLATION06/01/2022
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION06/01/2022
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEM INSTALLATION06/01/2022
DOB NOWPlumbingSigned-offENOBRAC PLUMBING, INC02/08/2021
DOB NOWMechanical SystemsSigned-offPERFORMANCE MECHANCIAL02/05/2021
DOB NOWMechanical SystemsPermit IssuedPERFORMANCE MECHANCIAL01/07/2021
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC12/07/2020
DOB NOWSidewalk ShedSigned-offSPIRE SCAFFOLDING & HOIST08/06/2018
BISOTISSUEDK.J. REMODELING OF NY CO*04/26/2021
BISOTISSUEDK.J. REMODELING OF NY CO*11/20/2020
BISOTISSUEDROUNDTABLE BUILDERS LTD02/19/2019
BISOTISSUEDK.J. REMODELING OF NY CO*06/20/2018
BISEQISSUEDEVEREST SCAFFOLDING INC08/25/2017
BISEQISSUEDEVEREST SCAFFOLDING INC08/25/2017
BISSPISSUEDBUCKMILLER AUTO.SPKLR.COR05/09/2017
BISOTISSUEDBILT NYG INC04/25/2017
BISPLISSUEDTOP PLUMBING GROUP,INC04/11/2017
BISOTISSUEDBILT NYG INC03/28/2017
BISOTISSUEDLIVING SPACE DESIGN LLC01/31/2017
BISSPISSUEDMAGNUM PLBG & HTG CORP08/12/2016
BISOTISSUEDLIVING SPACE DESIGN LLC02/03/2016
BISSPISSUEDUNIVERSAL FIRE SPR LLC12/11/2015
BISOTISSUEDNEW YORK LIVE ARTS, INC09/11/2015
+ 35 more permits on file
1 project · most recent 12/02/2020
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/02/2020Permit IssuedPERFORMANCE MECHANCIALAir Conditioning Systems
Cooling
Midea DLCLRAH58AAK 58,000 BTU · Condensing Unit ×1
DLFLDAH58XAK 58,000 BTU · Ahu ×1
Mammoth F024VLB-ALT-Z4H 22,000 BTU · Packaged Unit ×1
14 projects · most recent 01/17/2025
General Wiring Boiler Controls
FiledStatusContractorScope
01/17/2025CompleteELMAC ELECTRIC INC.General Wiring
10/25/2024CompleteABILENE ELECTRIC INCBoiler Controls
10/01/2024CompleteAURORA ELECL CONTG INC—
07/03/2024CompleteABILENE ELECTRIC INC—
05/29/2022CompleteSTEVEN FARKAS—
06/06/2021CompleteDKNJ ELECTRIC LLCGeneral Wiring
01/06/2021CompleteTM SELECT ELECTRIC CORP—
01/06/2021CompleteTM SELECT ELECTRIC CORPGeneral Wiring
12/10/2019CompleteAPOLLO ELECTRIC INC.General Wiring
08/20/2019CompleteACP ELECTRICAL CONTRACTIN—
03/25/2019CompleteMADISON ELECTRIC, INC—
08/09/2018CompleteTOP SHELF ELECTRIC CORP—
07/27/2018CompleteAPOLLO ELECTRIC INC.—
07/12/2018CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 02/13/2026
Steel Concrete
FiledStatusContractorScope
02/13/2026Permit IssuedMC CONSTRUCTION CONSULTINSteel, Concrete
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
09/23/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/01/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/30/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
05/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/18/2024Pass-Final Boiler Equipment InspectionPassView ↗
09/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
02/12/2026FinalSunil Baldprogress
02/04/2026Post-installed Anchors—special
02/04/2026Structural Steel - Welding—special
02/04/2026Structural Steel - Details—special
02/04/2026Concrete - Cast-In-Place—special
02/04/2026Final—progress
02/04/2026Sprayed fire-resistant materials—special
01/29/2026FinalSunil Baldprogress
07/22/2025Fire-Resistant Penetrations and JointsBALTU YORKOSspecial
07/22/2025Sprinkler SystemsBALTU YORKOSspecial
07/22/2025Tenant Protection Plan ComplianceBALTU YORKOSspecial
06/11/2025Tenant Protection Plan ComplianceBALTU YORKOSspecial
06/11/2025Sprinkler SystemsBALTU YORKOSspecial
06/11/2025Fire-Resistant Penetrations and JointsBALTU YORKOSspecial
04/25/2025Energy Code Compliance InspectionsBALTU YORKOSprogress
04/25/2025HVAC-R and service water piping design and insulationBALTU YORKOSenergy_progress
04/25/2025Fire-Resistant Penetrations and JointsBALTU YORKOSspecial
04/25/2025Tenant Protection Plan ComplianceBALTU YORKOSspecial
02/19/2025Tenant Protection Plan ComplianceRobert Germain Jr.special
02/11/2025FinalRobert Germain Jr.progress
02/11/2025Mechanical SystemsRobert Germain Jr.special
02/11/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
01/16/2025HVAC-R and service water heating equipmentBALTU YORKOSenergy_progress
01/16/2025HVAC-R and service water piping design and insulationBALTU YORKOSenergy_progress
01/16/2025Maintenance informationBALTU YORKOSenergy_progress
Latest 25 of 70.
▾Documents — 511 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch24
09/06/2026M00062065-I1Request digital key ↗
09/02/2026M00695908-I1Request digital key ↗
09/02/2026M00747897-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/04/2026M00408442-I1Request digital key ↗
09/04/2026M00408442-P1Request digital key ↗
09/04/2026M00372036-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026M00408427-I1Request digital key ↗
08/15/2026M00408427-P2Request digital key ↗
08/15/2026M00408427-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
09/02/2026M00408427-I1Request digital key ↗
08/15/2026M00408427-P2Request digital key ↗
08/15/2026M00408427-P1Request digital key ↗
▸Applications & Permits78
▸BISWORK PERMIT APPLICATION39
11/20/2020140962625Open ↗
02/19/2019123679046Open ↗
06/28/2018122749936Open ↗
Showing 3 of 39 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION35
06/02/2025123021693Open ↗
11/04/2020140962625Open ↗
02/19/2019123679046Open ↗
Showing 3 of 35 on file for this type
▸BISPLACE OF ASSEMBLY2
04/19/2016122610932Open ↗
02/12/2016122610932Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
04/19/2016122610932Open ↗
04/19/2016122610932Open ↗
▸Seals & Professional Certifications195
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION67
05/28/2019123679046Open ↗
02/19/2019123679046Open ↗
09/17/2018122749936Open ↗
Showing 3 of 67 on file for this type
▸DOB NOWProgress Inspector Seal & Signature33
09/23/2026M01059639-I1Open ↗
08/28/2026M00372036-I1Open ↗
08/28/2026M00372036-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/06/2026M00062065-I1Open ↗
09/02/2026M00408427-I1Open ↗
09/02/2026M00408427-P1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/23/2026M01059639-I1Open ↗
09/01/2026M01164056-I1Open ↗
09/01/2026M01164056-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
02/19/2019123679046Open ↗
03/10/2017123021693Open ↗
01/05/2016122610932Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
02/19/2019123679046Open ↗
08/24/2017140686434Open ↗
08/24/2017140686425Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
11/04/2020140962625Open ↗
08/24/2017140686434Open ↗
08/24/2017140686425Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
08/24/2017140686434Open ↗
08/24/2017140686425Open ↗
07/23/2015140380040Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/04/2020140962625Open ↗
▸Trade Schedules & Equipment30
▸BISSELF-CERT PLUMBING NOTICE11
06/09/2015140132988Open ↗
05/26/2015140132988Open ↗
Showing 2 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
07/25/2017123021693Open ↗
07/21/2017123021693Open ↗
03/10/2017123021693Open ↗
Showing 3 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
08/15/2015121158344Open ↗
Showing 1 of 2 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION2
09/17/2018122749936Open ↗
09/17/2018122749936Open ↗
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWTenant Protection Plan6
09/02/2026M00408427-I1Open ↗
08/15/2026M00408427-P1Open ↗
08/13/2026M00408442-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES5
01/15/2021140962625Open ↗
08/24/2017140686434Open ↗
08/24/2017140686425Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
02/19/2019123679046Open ↗
03/09/2017123021693Open ↗
07/23/2015140380040Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00372036-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00695908-I1Open ↗
▸Energy Compliance35
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
03/10/2017123021693Open ↗
12/28/2016122749936Open ↗
12/28/2016122749936Open ↗
Showing 3 of 10 on file for this type
▸BISTR8: Energy Code Progress Inspections7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
08/26/2016121770495Open ↗
08/10/2016122333947Open ↗
05/16/2016121124470Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/23/2021140962625Open ↗
11/04/2020140962625Open ↗
07/23/2015140380040Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
11/04/2020140962625Open ↗
07/23/2015140380040Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
06/02/2025123021693Open ↗
07/23/2021140962625Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/24/2017140686425Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M01059639-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00695908-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY12
07/23/2021140962625Open ↗
07/23/2021140962625Open ↗
11/04/2020140962625Open ↗
Showing 3 of 12 on file for this type
▸Approvals, Objections & Sign-offs37
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
06/03/2025123021693Open ↗
07/23/2021140962625Open ↗
06/05/2020140686425Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
12/28/2016122749936Open ↗
01/25/2016122333947Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/13/2026M01129977-I1Open ↗
08/13/2026M01136397-I1Open ↗
08/13/2026M01129977-P1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/19/2016122610932Open ↗
04/19/2016122610932Open ↗
04/19/2016122610932Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER1
06/28/2018122749936Open ↗
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT30
11/04/2020140962625Open ↗
05/28/2019123679046Open ↗
02/19/2019123679046Open ↗
Showing 3 of 30 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
05/15/2025123021693Open ↗
07/23/2021140962625Open ↗
▸Filing & Intake Forms35
▸BISEFILING COVER SHEET18
02/19/2019123679046Open ↗
03/10/2017123021693Open ↗
12/28/2016122749936Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION9
01/15/2021140962625Open ↗
03/22/2018140686434Open ↗
03/20/2018140686425Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
11/04/2020140962625Open ↗
08/24/2017140686434Open ↗
08/24/2017140686425Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
05/28/2019123679046Open ↗
09/17/2018122749936Open ↗
▸Other Documents1
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type