← Back
Over six families without stores
2172 ANTHONY AVENUE
BRONX · BIN 2013704
💬 Discuss this project
1916Year Built
5Stories
C1Building Class
R8Zoning
17,710 sfGross Floor Area
22Units
Rent Stabilized34 Open Violations ▸
Over six families without stores · Owner of record: 2172 ANTHONY AVENUEHOUSING DEVEL. FUND C ORP. · 5,000 sf lot · 3.54 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARAMCO CONTRACTING907/08/2026
2172 ANTHONY AVENUEHOUSING DEVEL. FUND C ORP.103/22/2026
FORDHAM BEDFORD HOUSING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VICTOR HUGO MARTINEZ, PE608/04/2022
SYED ENGINEERING, P.C.208/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BELFOR LONG ISLAND LLCGeneral Contractor1407/08/2026
ARAMCO CONTRACTING LLCGeneral Contractor507/08/2026
NEW GS GENERAL CONTRACTORGeneral Contractor303/21/2026
SLR RESTORATION INCGeneral Contractor303/21/2026
E.T. ELEC'L CONTR CO INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW IMAGE GEN. CONTRACTOR5266608/04/2022
Building Lifecycle
All (117)Filed (8)Permit Issued (11)Signed Off (6)Violation (60)Inspection (2)Special Inspection (30)
04/30/2026
Violation issued (HPD, open)
B
04/30/2026
Violation issued (HPD, open)
B
04/30/2026
Violation issued (HPD, open)
B
04/30/2026
Violation issued (HPD, open)
B
04/30/2026
Violation issued (HPD, open)
B
04/30/2026
Violation issued (HPD, open)
B
04/30/2026
Violation issued (HPD, open)
B
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
10/25/2023
Inspection — Pass-Final SP Permit Withdrawal
Pass
View inspection ↗
08/24/2023
Violation issued (HPD, closed)
C
07/13/2023
Signed off — Alteration
PROPOSED PARAPET REPAIR, PARTIAL ROOF REPLACEMENT AND SUB-FLOORING OF PARTIAL 5TH FLOOR. NO CHANGE IN OCCUPANCY, EGRESS, OR BULK.
X00537273-I1
07/10/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/02/2023
Signed off — Alteration
APPLICATION FILED FOR THE COMPLETE RENOVATION OF APRTMENTS 9 & 10 AT THE 3RD FLOOR OF THIS EXISTING MULTI-FAMILY NON-ELEVATOR BUILDING, THE PROPOSED WORK IS AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR BULK.
X00626847-S3
05/31/2023
Signed off — Alteration
APPLICATION FILED FOR THE COMPLETE RENOVATION OF APRTMENTS 9 & 10 AT THE 3RD FLOOR OF THIS EXISTING MULTI-FAMILY NON-ELEVATOR BUILDING, THE PROPOSED WORK IS AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR BULK.
X00626847-I1
05/31/2023
Signed off — Alteration
APPLICATION FILED FOR THE COMPLETE RENOVATION OF APRTMENTS 9 & 10 AT THE 3RD FLOOR OF THIS EXISTING MULTI-FAMILY NON-ELEVATOR BUILDING, THE PROPOSED WORK IS AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR BULK.
X00626847-S2
05/31/2023
Signed off — Alteration
APPLICATION FILED FOR THE COMPLETE RENOVATION OF APRTMENTS 9 & 10 AT THE 3RD FLOOR OF THIS EXISTING MULTI-FAMILY NON-ELEVATOR BUILDING, THE PROPOSED WORK IS AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR BULK.
X00626847-S1
05/31/2023
Signed off — Alteration
APPLICATION FILED FOR THE COMPLETE RENOVATION OF APRTMENTS 9 & 10 AT THE 3RD FLOOR OF THIS EXISTING MULTI-FAMILY NON-ELEVATOR BUILDING, THE PROPOSED WORK IS AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR BULK.
X00626847-S4
10/19/2022
Permit issued — Sidewalk Shed
X00578395-I1-SH
10/14/2022
Permit issued — General Construction
X00626847-S3-GC
10/14/2022
Permit issued — General Construction
X00626847-S1-GC
10/14/2022
Permit issued — General Construction
X00626847-S2-GC
10/14/2022
Permit issued — General Construction
X00626847-I1-GC
08/22/2022
Permit issued — General Construction
X00626847-S4-GC
08/04/2022
Filed — Alteration
APPLICATION FILED FOR THE COMPLETE RENOVATION OF APRTMENTS 9 & 10 AT THE 3RD FLOOR OF THIS EXISTING MULTI-FAMILY NON-ELEVATOR BUILDING, THE PROPOSED WORK IS AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR BULK.
X00626847-S4
06/08/2022
Permit issued — General Construction
X00626847-S3-GC
02/22/2022
Violation issued (HPD, closed)
C
02/22/2022
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
A
02/08/2022
Permit issued — General Construction
X00537273-I1-GC
02/03/2022
Violation issued (HPD, closed)
A
02/03/2022
Violation issued (HPD, closed)
A
02/03/2022
Violation issued (HPD, closed)
C
12/14/2021
Permit issued — General Construction
X00537273-I1-GC
12/07/2021
Filed — Alteration
APPLICATION FILED FOR THE COMPLETE RENOVATION OF APRTMENTS 9 & 10 AT THE 3RD FLOOR OF THIS EXISTING MULTI-FAMILY NON-ELEVATOR BUILDING, THE PROPOSED WORK IS AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR BULK.
X00626847-S3
12/07/2021
Filed — Alteration
APPLICATION FILED FOR THE COMPLETE RENOVATION OF APRTMENTS 9 & 10 AT THE 3RD FLOOR OF THIS EXISTING MULTI-FAMILY NON-ELEVATOR BUILDING, THE PROPOSED WORK IS AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR BULK.
X00626847-S2
12/04/2021
Filed — Alteration
APPLICATION FILED FOR THE COMPLETE RENOVATION OF APRTMENTS 9 & 10 AT THE 3RD FLOOR OF THIS EXISTING MULTI-FAMILY NON-ELEVATOR BUILDING, THE PROPOSED WORK IS AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR BULK.
X00626847-S1
11/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
VICTOR MARTINEZ
11/24/2021
Special inspection requirement — Fenestration areas
VICTOR MARTINEZ
11/24/2021
Special inspection requirement — Lighting in dwelling units
VICTOR MARTINEZ
11/24/2021
Special inspection requirement — Insulation placement and R values
VICTOR MARTINEZ
11/24/2021
Special inspection requirement — Fenestration air leakage
VICTOR MARTINEZ
11/24/2021
Special inspection requirement — Air barrier - visual inspection
VICTOR MARTINEZ
11/24/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
VICTOR MARTINEZ
11/23/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
VICTOR MARTINEZ
11/23/2021
Special inspection requirement — Final
VICTOR MARTINEZ
11/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
VICTOR MARTINEZ
11/23/2021
Special inspection requirement — Final
VICTOR MARTINEZ
11/23/2021
Special inspection requirement — Air barrier - visual inspection
VICTOR MARTINEZ
11/23/2021
Special inspection requirement — Insulation placement and R values
VICTOR MARTINEZ
11/23/2021
Special inspection requirement — Fenestration air leakage
VICTOR MARTINEZ
11/23/2021
Special inspection requirement — Lighting in dwelling units
VICTOR MARTINEZ
11/23/2021
Special inspection requirement — Fenestration areas
VICTOR MARTINEZ
11/16/2021
Filed — Alteration
APPLICATION FILED FOR THE COMPLETE RENOVATION OF APRTMENTS 9 & 10 AT THE 3RD FLOOR OF THIS EXISTING MULTI-FAMILY NON-ELEVATOR BUILDING, THE PROPOSED WORK IS AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR BULK.
X00626847-I1
11/08/2021
Special inspection requirement — Final
VICTOR MARTINEZ
11/08/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
VICTOR MARTINEZ
11/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
VICTOR MARTINEZ
11/08/2021
Special inspection requirement — Fenestration areas
VICTOR MARTINEZ
11/08/2021
Special inspection requirement — Fenestration air leakage
VICTOR MARTINEZ
11/08/2021
Special inspection requirement — Lighting in dwelling units
VICTOR MARTINEZ
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedARAMCO CONTRACTING LLC10/19/2022
DOB NOWGeneral ConstructionSigned-offBELFOR LONG ISLAND LLC10/14/2022
DOB NOWGeneral ConstructionSigned-offBELFOR LONG ISLAND LLC10/14/2022
DOB NOWGeneral ConstructionSigned-offBELFOR LONG ISLAND LLC10/14/2022
DOB NOWGeneral ConstructionSigned-offBELFOR LONG ISLAND LLC10/14/2022
DOB NOWGeneral ConstructionSigned-offBELFOR LONG ISLAND LLC08/22/2022
DOB NOWGeneral ConstructionSigned-offBELFOR LONG ISLAND LLC06/08/2022
DOB NOWGeneral ConstructionSigned-offNEW GS GENERAL CONTRACTOR02/08/2022
DOB NOWGeneral ConstructionSigned-offSLR RESTORATION INC12/14/2021
DOB NOWSupported ScaffoldPermit IssuedARAMCO CONTRACTING LLC08/19/2021
DOB NOWSidewalk ShedPermit IssuedARAMCO CONTRACTING LLC08/19/2021
BISOTISSUEDZEESHAN CONTRACTOR INC11/10/2010
BISEQISSUEDROCK SCAFFOLDING CORP04/27/2010
BISEQISSUEDROCK SCAFFOLDING CORP01/19/2010
BISOTISSUEDFORDHAM BEDFORD HOUSING CORP02/07/2000
BISPLISSUEDPARKSET PLUMBING CO INC10/22/1999
BISPLISSUEDWASOFF PLBG & UTILITY CO08/24/1998
BISBLISSUEDWASOFF PLBG & UTILITY CO08/24/1998
BISPLISSUEDPARKSET PLUMBING CO INC08/04/1998
BISOTISSUEDR&R CONTRACTING07/20/1998
BISFBISSUEDA & C WELDING11/23/1993
2 projects · most recent 11/23/2022
General Wiring
FiledStatusContractorScope
11/23/2022CompleteE.T. ELEC'L CONTR CO INCGeneral Wiring
08/18/2021Permit IssuedRICHARD NEU—
1 project · most recent 08/18/2021
Sidewalk Shed
FiledStatusContractorScope
08/18/2021Permit IssuedARAMCO CONTRACTING LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/25/2023Pass-Final SP Permit WithdrawalPassView ↗
07/10/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
11/24/2021Fire-Resistant Penetrations and JointsVICTOR MARTINEZspecial
11/24/2021Fenestration areasVICTOR MARTINEZenergy_progress
11/24/2021Lighting in dwelling unitsVICTOR MARTINEZenergy_progress
11/24/2021Insulation placement and R valuesVICTOR MARTINEZenergy_progress
11/24/2021Fenestration air leakageVICTOR MARTINEZenergy_progress
11/24/2021Air barrier - visual inspectionVICTOR MARTINEZenergy_progress
11/24/2021Fenestration and door U-factor and product ratingsVICTOR MARTINEZenergy_progress
11/23/2021Fenestration and door U-factor and product ratingsVICTOR MARTINEZenergy_progress
11/23/2021FinalVICTOR MARTINEZprogress
11/23/2021Fire-Resistant Penetrations and JointsVICTOR MARTINEZspecial
11/23/2021FinalVICTOR MARTINEZprogress
11/23/2021Air barrier - visual inspectionVICTOR MARTINEZenergy_progress
11/23/2021Insulation placement and R valuesVICTOR MARTINEZenergy_progress
11/23/2021Fenestration air leakageVICTOR MARTINEZenergy_progress
11/23/2021Lighting in dwelling unitsVICTOR MARTINEZenergy_progress
11/23/2021Fenestration areasVICTOR MARTINEZenergy_progress
11/08/2021FinalVICTOR MARTINEZprogress
11/08/2021Structural Stability – Alterations of existing buildingsVICTOR MARTINEZspecial
11/08/2021Fire-Resistant Penetrations and JointsVICTOR MARTINEZspecial
11/08/2021Fenestration areasVICTOR MARTINEZenergy_progress
11/08/2021Fenestration air leakageVICTOR MARTINEZenergy_progress
11/08/2021Lighting in dwelling unitsVICTOR MARTINEZenergy_progress
11/08/2021Energy Code Compliance InspectionsVICTOR MARTINEZprogress
11/08/2021Fenestration and door U-factor and product ratingsVICTOR MARTINEZenergy_progress
11/08/2021Air barrier - visual inspectionVICTOR MARTINEZenergy_progress
Latest 25 of 30.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026X00537273-I1Request digital key ↗
08/25/2026X00578395-I1Request digital key ↗
08/25/2026X00578396-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
05/03/2011220045608Open ↗
11/12/2010220085217Open ↗
01/19/2010220045608Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
09/28/2010220085217Open ↗
01/19/2010220045608Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature11
09/27/2026X00626847-S3Open ↗
09/27/2026X00626847-S3Open ↗
09/27/2026X00626847-S3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026X00537273-I1Open ↗
08/25/2026X00578396-I1Open ↗
08/25/2026X00626847-S3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/27/2026X00626847-S3Open ↗
09/01/2026X00626847-S1Open ↗
08/30/2026X00537273-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
11/08/2010220085217Open ↗
09/28/2010220085217Open ↗
01/19/2010220045608Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/28/2013220085217Open ↗
09/28/2010220085217Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/28/2010220085217Open ↗
01/19/2010220045608Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026X00626847-S3Open ↗
08/25/2026X00626847-S2Open ↗
08/25/2026X00626847-S4Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/19/2010220045608Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/28/2010220085217Open ↗
▸Energy Compliance6
▸DOB NOWEN2: As Built Energy Analysis6
08/13/2026X00626847-S2Open ↗
08/13/2026X00626847-S4Open ↗
08/13/2026X00626847-S3Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS2
09/28/2010220085217Open ↗
01/19/2010220045608Open ↗
▸BISSHED LETTER1
05/03/2011220045608Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/05/2013220085217Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/27/2010220045608Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/05/2013220085217Open ↗
09/28/2010220085217Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
09/28/2010220085217Open ↗
01/19/2010220045608Open ↗