← Back
Large suburban residence
2173 59 STREET
BROOKLYN · BIN 3429014
💬 Discuss this project
2021Year Built
3.25Stories
A3Building Class
R5Zoning
4,956 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Large suburban residence · Owner of record: 2173 59 LLC · 3,339 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof25p · 3 filings · 20 docs
Floor 326p · 4 filings · 20 docs
Floor 224p · 4 filings · 20 docs
Floor 124p · 2 filings · 14 docs
Cellar27p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COUNTYWIDE BUILDERS1007/08/2026
KINGS COUNTY SERVICES2707/08/2026
CLASSIC BUILDERS303/22/2026
2173 59 LLC303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EYAL LEVITT ARCHITECT PC704/22/2026
SGM ENGINEERING105/12/2021
CONSULTING ENGINEERS104/22/2021
ARYEH SIEGEL ARCHITECT111/06/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AVALON DESIGNS2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COUNTYWIDE BUILDERS INCGeneral Contractor1207/08/2026
P.H. WORKS INCPlumbing607/08/2026
COUNTY ELECL CONTRACTOR IElectrical203/22/2026
ARYEH YARMARKElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616804/22/2026
Building Lifecycle
All (98)Filed (11)Permit Issued (14)Signed Off (3)Violation (6)Inspection (14)Objection (20)Special Inspection (30)
08/27/2026
Signed off — Alteration
CURB CUT FILING IN CONJUNCTION WITH NB APPLICATION # 322084926
B00420616-I1
07/20/2026
Signed off — Alteration
Plumbing work in conjunction with NB application # 322084926
B00939611-I1
07/14/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
06/04/2026
Objection raised — Zoning
06/04/2026
Objection raised — Energy
05/12/2026
Objection resolved — Addressed
05/12/2026
Objection resolved — Addressed
05/12/2026
Objection resolved — Addressed
05/07/2026
Signed off — Alteration
B00375266-I1
05/07/2026
Permit issued — Curb Cut
B00420616-I1-CC
05/05/2026
Objection raised — Scope
05/05/2026
Objection raised — Cost
05/05/2026
Objection raised — Scope
05/05/2026
Objection raised — Fire_Protection
05/05/2026
Objection raised — Scope
04/22/2026
Filed — Alteration
Mechanical work in conjunction with NB application # 322084926
B00939706-P1
03/17/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/26/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
02/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
02/26/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
02/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/26/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/24/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
02/24/2026
Special inspection requirement — Shutoff dampers
FAHAD FATEH
02/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/24/2026
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
02/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/24/2026
Special inspection requirement — Final
FAHAD FATEH
02/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/24/2026
Special inspection requirement — Heating Systems
FAHAD FATEH
02/24/2026
Special inspection requirement — Mechanical Systems
FAHAD FATEH
02/24/2026
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
02/24/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
02/12/2026
Filed — Alteration
Plumbing work in conjunction with NB application # 322084926
B00939611-P3
02/09/2026
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
11/12/2025
Objection resolved — Addressed
11/10/2025
Objection raised — Admin
11/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/06/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
11/04/2025
Filed — Alteration
FILING FOR UNDERGROUND PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION # 322084926
B00927164-P1
10/31/2025
Filed — Alteration
Plumbing work in conjunction with NB application # 322084926
B00939611-P2
10/27/2025
Permit issued — Plumbing
B00939611-I1-PL
09/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
09/16/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
09/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/16/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
09/16/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
09/16/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
09/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
09/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/25/2025
Permit issued — Plumbing
B00927164-I1-PL
07/07/2025
Permit issued — Construction Fence
B00375266-I1-FN
10/29/2024
Permit issued — Plumbing
B00939611-I1-PL
10/29/2024
Permit issued — Mechanical Systems
B00939706-I1-MS
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offCOUNTYWIDE BUILDERS INC05/07/2026
DOB NOWPlumbingSigned-offP.H. WORKS INC10/27/2025
DOB NOWPlumbingSigned-offP.H. WORKS INC08/25/2025
DOB NOWConstruction FenceSigned-offCOUNTYWIDE BUILDERS INC07/07/2025
DOB NOWPlumbingSigned-offP.H. WORKS INC10/29/2024
DOB NOWMechanical SystemsPermit IssuedCOUNTYWIDE BUILDERS INC10/29/2024
DOB NOWPlumbingSigned-offP.H. WORKS INC08/27/2024
DOB NOWConstruction FenceSigned-offCOUNTYWIDE BUILDERS INC07/15/2024
DOB NOWStructuralPermit IssuedCOUNTYWIDE BUILDERS INC07/15/2024
DOB NOWMechanical SystemsPermit IssuedCOUNTYWIDE BUILDERS INC11/03/2023
DOB NOWPlumbingSigned-offP.H. WORKS INC11/02/2023
DOB NOWPlumbingSigned-offP.H. WORKS INC09/01/2023
DOB NOWConstruction FenceSigned-offCOUNTYWIDE BUILDERS INC07/26/2023
DOB NOWStructuralPermit IssuedCOUNTYWIDE BUILDERS INC07/19/2023
BIS—ISSUEDCOUNTYWIDE BUILDERS INC02/09/2026
BIS—ISSUEDCOUNTYWIDE BUILDERS INC11/04/2025
BIS—ISSUEDCOUNTYWIDE BUILDERS INC10/29/2024
BIS—ISSUEDCOUNTYWIDE BUILDERS INC07/12/2024
BIS—ISSUEDKINGS COUNTY SERVICES INC02/03/2021
1 project · most recent 04/22/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/22/2026Permit IssuedCOUNTYWIDE BUILDERS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NAM2 60,000 BTU · Condensing Unit ×4
SUZ-KA18NA2 18,000 BTU · Condensing Unit ×1
SEZ-KD18NA4 635 CFM · Vrf Indoor ×3
MXZ-SM36NAMHZ 42,000 BTU · Condensing Unit ×2
PEAD-A24AA8 740 CFM · Ductwork ×2
PEAD-A36AA8 1,200 CFM · Vrf Indoor ×2
SLZ-KF12NA 335 CFM · Fan Coil Indoor ×2
MSZ-FS15NA 520 CFM · Split System ×1
MXZ-3C30NAHZ4 36,000 BTU · Condensing Unit ×1
MXZ-SM42NAMHZ 48,000 BTU · Condensing Unit ×1
MXZ-SM48NAMHZ 54,000 BTU · Condensing Unit ×1
SEZ-KD15NA4 530 CFM · Ductwork ×1
Daikin RXTQ48TBVJUB 48,000 BTU · Vrf Outdoor ×1
Wine Guardian DS088 8,000 BTU · Condensing Unit ×1
Ventilation
Greenheck SP-B80 80 CFM · Exhaust Fan ×22
SP-A110 100 CFM · Exhaust Fan ×2
Panasonic FV-10VEC2 100 CFM · Erv ×4
FV-20VEC1 200 CFM · Erv ×1
2 projects · most recent 02/12/2026
Storm Water/Sanitary Gas
FiledStatusContractorScope
02/12/2026Signed-offP.H. WORKS INCGas, Storm, Water/Sanitary
11/04/2025Signed-offP.H. WORKS INCStorm, Water/Sanitary
3 projects · most recent 09/28/2023
General Wiring
FiledStatusContractorScope
09/28/2023Permit IssuedNET POWER ELECTRIC CORPGeneral Wiring
04/27/2021CompleteCOUNTY ELECL CONTRACTOR I—
04/27/2021CompleteCOUNTY ELECL CONTRACTOR I—
1 project · most recent 04/22/2021
FiledStatusContractorScope
04/22/2021Permit IssuedCOUNTYWIDE BUILDERS INC1 scope_items
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
03/17/2026Pass-Final PL - UndergroundPassView ↗
02/09/2026Fail-Final PL - Up to 9 Requested FloorsFailView ↗
09/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/20/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/23/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/23/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/03/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/03/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/25/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/19/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/13/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
02/26/2026Maintenance informationFAHAD FATEHenergy_progress
02/26/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
02/26/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
02/26/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/26/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
02/26/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/26/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
02/24/2026Maintenance informationFAHAD FATEHenergy_progress
02/24/2026Shutoff dampersFAHAD FATEHenergy_progress
02/24/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/24/2026Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
02/24/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
02/24/2026FinalFAHAD FATEHprogress
02/24/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/24/2026Heating SystemsFAHAD FATEHspecial
02/24/2026Mechanical SystemsFAHAD FATEHspecial
02/24/2026Post-installed AnchorsFAHAD FATEHspecial
02/24/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
02/24/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
11/06/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/06/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
09/16/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/16/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
09/16/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/16/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
Latest 25 of 49.
▾Documents — 113 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch7
08/20/2026B00927164-P1Request digital key ↗
08/20/2026B00927164-I1Request digital key ↗
08/18/2026B00939611-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00375266-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00420616-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/01/2026B00421444-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026B00420613-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/01/2026B00421444-I1Request digital key ↗
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION14
02/20/2026322084926Open ↗
02/19/2026322084926Open ↗
01/12/2023322084926Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION4
07/19/2023322084926Open ↗
02/17/2021322084926Open ↗
02/17/2021322084926Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
05/06/2021340780186Open ↗
11/09/2020340780186Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/20/2026322084926Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM ACCEPTANCE1
11/16/2020322084926Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/16/2020322084926Open ↗
▸BISZONING DIAGRAM1
11/12/2020322084926Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
11/16/2020322084926Open ↗
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/02/2026B00420616-I1Open ↗
09/01/2026B00420613-I1Open ↗
08/20/2026B00927164-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026B00939611-I1Open ↗
09/02/2026B00939611-I1Open ↗
09/01/2026B00939706-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026B00939611-I1Open ↗
09/01/2026B00939706-I1Open ↗
08/29/2026B00927164-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/09/2020340780186Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/17/2021322084926Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/09/2020340780186Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
04/28/2021340780186Open ↗
04/22/2021340780186Open ↗
11/16/2020322084926Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/22/2021340780186Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
02/17/2021322084926Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/07/2021322084926Open ↗
06/17/2020322084926Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
11/30/2020322084926Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/17/2021322084926Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY7
08/31/2021322084926Open ↗
01/07/2021322084926Open ↗
01/07/2021322084926Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
02/17/2021322084926Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/16/2020322084926Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
02/17/2021322084926Open ↗
▸BISSOIL REPORT1
11/30/2020322084926Open ↗
▸Approvals, Objections & Sign-offs9
▸BISSCHEDULE A - OCCUPANCY / USE9
02/19/2026322084926Open ↗
12/30/2020322084926Open ↗
12/23/2020322084926Open ↗
Showing 3 of 9 on file for this type
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE2
07/19/2023322084926Open ↗
02/17/2021322084926Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
04/22/2021340780186Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET3
12/11/2020322084926Open ↗
11/12/2020322084926Open ↗
05/29/2020322084926Open ↗
▸BISADDITIONAL INFORMATION3
04/22/2021322084926Open ↗
01/08/2021322084926Open ↗
01/07/2021322084926Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/09/2020340780186Open ↗
▸Other Documents8
▸BISBPP - SUPPORTING DOCUMENTATION5
05/06/2021340780186Open ↗
04/28/2021340780186Open ↗
04/22/2021340780186Open ↗
Showing 3 of 5 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM1
11/30/2020322084926Open ↗
▸BISPLOT DIAGRAM1
06/17/2020322084926Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
04/28/2021340780186Open ↗