← Back
Over six families without stores
2175 DAVIDSON AVENUE
BRONX · BIN 2130655
💬 Discuss this project
2022Year Built
4Stories
C1Building Class
R7-1Zoning
5,317 sfGross Floor Area
18Units
Rent Stabilized3 Open Violations ▸
Over six families without stores · Owner of record: 2175 DAVIDSON AVENUE LLC · 1,764 sf lot · 3.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof15p · 6 filings · 20 docs
Bulkhead1p · 1 filing · 7 docs
Floor 49p · 2 filings · 20 docs
Floor 39p · 2 filings · 20 docs
Floor 210p · 2 filings · 20 docs
Floor 113p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2175 DAVIDSON AVENUE6707/08/2026
BK CONSTRUCTIONDBA SRT CONSTRUCTION407/08/2026
FOUR BORO ENTERPRISE503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/21/2022$1.5M—29 CLINTON PL LLC → 2175 DAVIDSON AVENUE LLC$282/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENGINEERING PROFESSIONAL SERVICE P.404/02/2024
ALL CITY ENGINEERING, P.C.1202/28/2024
ASHRAF CORP202/28/2023
AVISHAY I. MAZOR, P.E.308/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMG GROUP USA1603/21/2026
EXSPEEDIUM603/21/2026
RENNON CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FOUR BORO ENTERPRISE INCGeneral Contractor1307/08/2026
PLBG P & H INCPlumbing307/08/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
BK CONSTRUCTION SVCS INCGeneral Contractor107/08/2026
SPARK ELECTRICAL SVCS LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION15191804/02/2024
Building Lifecycle
All (102)Filed (21)Permit Issued (14)Signed Off (10)Violation (5)Inspection (14)Objection (8)Special Inspection (30)
04/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/02/2024
Filed — New Building
NEW FOUR STORY EIGHTEEN (18) DWELLING UNIT BUILDING
X00676895-P2
04/02/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
04/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/02/2024
Special inspection requirement — Exterior lighting power
Younes Abouyaala
04/02/2024
Special inspection requirement — Fenestration areas
Younes Abouyaala
04/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
04/02/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
04/02/2024
Special inspection requirement — Metering
Younes Abouyaala
04/02/2024
Special inspection requirement — Interior lighting power
Younes Abouyaala
04/02/2024
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
04/02/2024
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
04/02/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
04/02/2024
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
04/02/2024
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
04/02/2024
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
04/02/2024
Special inspection requirement — Lighting controls
Younes Abouyaala
04/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
03/13/2024
Signed off — Alteration
Installation of plumbing system in conjunction of ALT 1 X00676895 and DOB X00723235, X00678233, X00678224. No change in use, egress, or occupancy
X00678228-I1
03/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
03/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
03/01/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
03/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
03/01/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
03/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
02/28/2024
Filed — Alteration
Installation of plumbing system in conjunction of ALT 1 X00676895 and DOB X00723235, X00678233, X00678224. No change in use, egress, or occupancy
X00678228-P3
02/08/2024
Signed off — Alteration
Install (2) New boilers. The second boiler is being filed under JOB# X00723235-P1
X00977575-I1
02/08/2024
Signed off — Alteration
installation of boiler in conjunction with ALT 1 X00676895, and X00678224, X00678228, X00678233. No change in use, egress, or occupancy.
X00723235-I1
02/07/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/06/2024
Filed — Alteration
Installation of plumbing system in conjunction of ALT 1 X00676895 and DOB X00723235, X00678233, X00678224. No change in use, egress, or occupancy
X00678228-P2
02/02/2024
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
02/02/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
02/02/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
02/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
02/02/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
02/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
02/02/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
01/31/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/29/2024
Signed off — Alteration
Installation of the sprinkler system in conjunction with X00676895,X00678224,X00678228,X00723235. No change in use, egress, or occupancy.
X00678233-I1
01/25/2024
Filed — Alteration
Install (2) New boilers. The second boiler is being filed under JOB# X00723235-P1
X00977575-P1
01/25/2024
Filed — Alteration
installation of boiler in conjunction with ALT 1 X00676895, and X00678224, X00678228, X00678233. No change in use, egress, or occupancy.
X00723235-P2
01/24/2024
Filed — New Building
NEW FOUR STORY EIGHTEEN (18) DWELLING UNIT BUILDING
X00676895-P1
01/24/2024
Permit issued — Boiler Equipment
X00977575-I1-BE
01/23/2024
Signed off — Alteration
Mechanical installation in conjunction with Alt 1 X00676895, and X00723235, X00678228, X00678233. No change in use, egress, or occupancy.
X00678224-I1
01/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/16/2024
Filed — Alteration
Install (2) New boilers. The second boiler is being filed under JOB# X00723235-P1
X00977575-I1
01/16/2024
Filed — Alteration
Mechanical installation in conjunction with Alt 1 X00676895, and X00723235, X00678228, X00678233. No change in use, egress, or occupancy.
X00678224-P1
01/16/2024
Filed — Alteration
installation of boiler in conjunction with ALT 1 X00676895, and X00678224, X00678228, X00678233. No change in use, egress, or occupancy.
X00723235-P1
01/16/2024
Filed — Alteration
Installation of plumbing system in conjunction of ALT 1 X00676895 and DOB X00723235, X00678233, X00678224. No change in use, egress, or occupancy
X00678228-P1
01/10/2024
Signed off — Alteration
X00750516-I1
01/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/02/2024
Signed off — Alteration
INSTALLATION OF 152' NEW SIDEWALK SHED AT 2175 DAVIDSON AVE AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
X00824344-I1
12/06/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/19/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/12/2023
Signed off — Alteration
X00713710-I1
09/12/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/12/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/30/2023
Permit issued — Sprinklers
X00678233-I1-EW-SP
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offPLBG P & H INC01/24/2024
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC08/30/2023
DOB NOWBoiler EquipmentSigned-offPLBG P & H INC08/30/2023
DOB NOWMechanical SystemsSigned-offFOUR BORO ENTERPRISE INC08/30/2023
DOB NOWPlumbingSigned-offPLBG P & H INC05/30/2023
DOB NOWConstruction FenceSigned-offFOUR BORO ENTERPRISE INC05/30/2023
DOB NOWGeneral ConstructionPermit IssuedFOUR BORO ENTERPRISE INC05/25/2023
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC02/09/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN12/22/2022
DOB NOWStructuralSigned-offFOUR BORO ENTERPRISE INC09/13/2022
DOB NOWGeneral ConstructionPermit IssuedFOUR BORO ENTERPRISE INC09/08/2022
DOB NOWFoundationSigned-offFOUR BORO ENTERPRISE INC08/11/2022
DOB NOWConstruction FenceSigned-offFOUR BORO ENTERPRISE INC06/08/2022
DOB NOWFoundationSigned-offFOUR BORO ENTERPRISE INC05/26/2022
4 projects · most recent 01/25/2024
General Wiring
FiledStatusContractorScope
01/25/2024CompleteSPARK ELECTRICAL SVCS LLC—
11/24/2023CompleteSPARK ELECTRICAL SVCS LLC19 meters, 19 new_meters
06/14/2023CompleteTOWER FIRE & ELECT SVCSGeneral Wiring
02/10/2023CompleteHIGH QUALITY ELECTRIC OF—
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
04/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/07/2024Pass-Final Boiler Equipment InspectionPassView ↗
01/31/2024Pass-Final Boiler Equipment InspectionPassView ↗
01/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2023Fail-Final CND-Occupancy InspectionFailView ↗
09/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/19/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/24/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/30/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/30/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 104
DateRequirementInspectorRole
04/02/2024Maintenance informationYounes Abouyaalaenergy_progress
04/02/2024Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
04/02/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/02/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/02/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
04/02/2024Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
04/02/2024Air barrier - visual inspectionYounes Abouyaalaenergy_progress
04/02/2024MeteringYounes Abouyaalaenergy_progress
04/02/2024Insulation placement and R valuesYounes Abouyaalaenergy_progress
04/02/2024Lighting in dwelling unitsYounes Abouyaalaenergy_progress
04/02/2024Interior lighting powerYounes Abouyaalaenergy_progress
04/02/2024Exterior lighting powerYounes Abouyaalaenergy_progress
04/02/2024Fenestration air leakageYounes Abouyaalaenergy_progress
04/02/2024Fenestration areasYounes Abouyaalaenergy_progress
04/02/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
04/02/2024Lighting controlsYounes Abouyaalaenergy_progress
03/01/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
03/01/2024Maintenance informationYounes Abouyaalaenergy_progress
03/01/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
03/01/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
03/01/2024HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
03/01/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
03/01/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/02/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/02/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
Latest 25 of 104.
▾Documents — 149 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/24/2026X00713710-I1Request digital key ↗
08/24/2026X00678233-I1Request digital key ↗
08/24/2026X00678224-P1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits7
▸DOB NOWHPD - Permit Notice5
08/13/2026X00779359-I1Open ↗
08/13/2026X00713710-I1Open ↗
08/13/2026X00750516-I1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
10/24/2023240342697Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/24/2023240342697Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X00676895-P1Open ↗
08/13/2026X00676895-P2Open ↗
08/13/2026X00676895-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X00676895-P1Open ↗
08/13/2026X00676895-P2Open ↗
08/13/2026X00676895-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00676895-I1Open ↗
▸Seals & Professional Certifications73
▸DOB NOWProgress Inspector Seal & Signature29
09/23/2026X00678224-P1Open ↗
09/23/2026X00678224-P1Open ↗
09/23/2026X00678224-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/24/2026X00713710-I1Open ↗
08/24/2026X00678233-I1Open ↗
08/24/2026X00678224-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/23/2026X00678224-P1Open ↗
09/23/2026X00678224-P1Open ↗
09/23/2026X00723235-I1Open ↗
Showing 3 of 21 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/02/2023240342697Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/02/2023240342697Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026X00676895-P2Open ↗
08/13/2026X00676895-I1Open ↗
08/13/2026X00676895-P1Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist3
08/13/2026X00676895-P1Open ↗
08/13/2026X00676895-I1Open ↗
08/13/2026X00676895-P2Open ↗
▸BISBPP: STREET TREES SITE PLAN1
10/24/2023240342697Open ↗
▸BISSTREET TREE CHECKLIST1
10/24/2023240342697Open ↗
▸BISSTREET TREE SIGNOFF1
03/22/2024240342697Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00676895-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00676895-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00676895-I1Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis4
08/13/2026X00723235-I1Open ↗
08/13/2026X00678224-I1Open ↗
08/13/2026X00676895-I1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports6
▸DOB NOWTR4 Plot Diagram2
08/13/2026X00741251-I1Open ↗
08/13/2026X00713710-I1Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026X00741251-I1Open ↗
08/13/2026X00713710-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026X00713710-I1Open ↗
08/13/2026X00741251-I1Open ↗
▸Filing & Intake Forms4
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026X00676895-P1Open ↗
08/16/2026X00676895-P2Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/24/2023240342697Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/02/2023240342697Open ↗
▸Other Documents15
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X00676895-P2Open ↗
08/13/2026X00676895-P1Open ↗
08/13/2026X00676895-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026X00676895-P2Open ↗
08/21/2026X00676895-P1Open ↗
08/21/2026X00676895-I1Open ↗
▸DOB NOWHPD - Completion Notice3
08/13/2026X00741251-I1Open ↗
08/13/2026X00750516-I1Open ↗
08/13/2026X00779359-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026X00676895-P1Open ↗
08/13/2026X00676895-P2Open ↗
08/13/2026X00676895-I1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/24/2023240342697Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00676895-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00676895-I1Open ↗