← Back
One story retail building
2175 HYLAN BOULEVARD
STATEN ISLAND · BIN 5107527
💬 Discuss this project
1973Year Built
1Stories
K1Building Class
R3-2Zoning
19,515 sfGross Floor Area
8Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
One story retail building · Owner of record: MAR FRAN REALTY CORP · 80,050 sf lot · 0.24 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 5 docs
Floor 1Under Construction25p · 3 filings · 20 docs
CellarUnder Construction1p · 1 filing · 1 doc
3 jobs · most recent 07/28/2026
Heating and Air Conditioning Systems Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/28/2026——Heating and Air Conditioning Systems
Heat / Cool
York YORK, KJ090N18R2AAAAA1A1 90,000 BTU · Packaged Unit ×1
05/06/2026Permit IssuedOMUNDSEN CONSTRUCTION CORHeating and Air Conditioning Systems
Heat / Cool
York KE048H12B2AAAAA1A1 54,900 BTU · Rooftop Unit ×1
06/27/2025Permit IssuedMKNK WASTE REMOVAL INCAir Conditioning Systems, Refrigeration Systems, Ventilation Systems
Cooling
Lg MSZ-GL12NA 12,000 BTU · Split System ×2
Ventilation
Hood Products HP2-D.250-20D-3500-3 2,500 CFM · Makeup Air ×2
HPDU85H-2800-1-PE 3,000 CFM · Kitchen Exhaust ×2
Viking VWH560481SS 3,000 CFM · Kitchen Exhaust ×2
Refrigeration
Heatcraft CEL0060AS6AMAB0000 6,500 BTU · Refrigeration Unit ×6
Mrcool DIY-12-HP-C-115B 6,500 BTU · Condensing Unit ×4
Mitsubishi Electric MUZ-FS12NA-U1 12,000 BTU · Condensing Unit ×2
2 jobs · most recent 05/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/07/2026Permit IssuedIPS PLUMBING CORPGas
05/10/2024Permit IssuedA&H EXPRESS PLBG&HTG CORPGas, Water/Sanitary
3 jobs · most recent 07/15/2026
General Wiring
FiledStatusContractorScope
07/15/2026Permit IssuedASKO ELEC CONST & MAIN IN—
05/17/2026Permit IssuedASKO ELEC CONST & MAIN IN—
09/16/2025CompleteMAC ELECT'L CONTR. INC.General Wiring
1 job · most recent 09/12/2025
Fence
FiledStatusContractorScope
09/12/2025Permit IssuedMKNK WASTE REMOVAL INCFence
Building Lifecycle
All (93)Filed (12)Permit Issued (9)Signed Off (1)Violation (22)Inspection (7)Objection (12)Special Inspection (30)
08/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/30/2026
Filed — Alteration
INSTALLATION OF A NEW ILLUMINATED ACCESSORY BUSINESS SIGN, INCLUDING ELECTRICAL CONNECTIONS AND ASSOCIATED MOUNTING HARDWARE. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR BUILDING ENVELOPE.
S01436371-I1
07/28/2026
Filed — Alteration
Direct replacement of an existing 7.5 ton HVAC single package unit on existing steel dunnage.
S01436028-I1
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
07/24/2026
Special inspection requirement — Mechanical Systems
anthony santoro
07/24/2026
Special inspection requirement — Final
anthony santoro
06/18/2026
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
06/11/2026
Permit issued — Plumbing
S01398429-I1-PL
05/26/2026
Objection raised — Scope
05/26/2026
Objection resolved — Addressed
05/26/2026
Objection raised — Admin
05/26/2026
Objection resolved — Addressed
05/12/2026
Permit issued — Mechanical Systems
S01397377-I1-MS
05/07/2026
Filed — Alteration
Install gas kitchen equipment, gas hot water heater and gas furnace
S01398429-I1
05/06/2026
Filed — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF (1) EXISTING ROOF TOP MECHANICAL UNIT WITH NEW UNIT OF EQUAL CAPACITY. ANY GAS PIPING ALTERATIONS SHALL BE FILED UNDER SEPARATE LIMITED ALTERATION APPLICATION (LAA). NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01397377-I1
05/05/2026
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
05/05/2026
Special inspection requirement — Mechanical Systems
anthony santoro
05/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
05/05/2026
Special inspection requirement — Final
Vincent Torchio
05/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
01/22/2026
Violation issued (FDNY_NOV, closed)
09/30/2025
Permit issued — Construction Fence
S01284482-I1-FN
09/12/2025
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS SUBMITTED IN CONJUCTION WITH #S00895902-I1
S01284482-I1
09/09/2025
Permit issued — General Construction
S00895902-I1-MS
09/09/2025
Permit issued — Mechanical Systems
S00895902-I1-GC
09/02/2025
Special inspection requirement — Lighting controls
SERDAR CEYLAN
09/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
09/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
SERDAR CEYLAN
09/02/2025
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
09/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
09/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
09/02/2025
Special inspection requirement — Mechanical Systems
SERDAR CEYLAN
09/02/2025
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
09/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
SERDAR CEYLAN
09/02/2025
Special inspection requirement — Final
SERDAR CEYLAN
09/02/2025
Special inspection requirement — Fenestration areas
SERDAR CEYLAN
09/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SERDAR CEYLAN
08/21/2025
Objection resolved — Addressed
08/21/2025
Objection resolved — Addressed
08/05/2025
Objection raised — Zoning
08/05/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/09/2025
Objection raised — Scope
07/09/2025
Objection raised — Scope
07/09/2025
Objection raised — Scope
06/27/2025
Filed — Alteration
PROPOSING OFFICE SPACES AND WALK IN BOXES ON EXISTING FOOD MARKET ON THE FIRST FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS IS PROPOSED.
S00895902-P1
06/18/2025
Special inspection requirement — Fenestration areas
SERDAR CEYLAN
06/18/2025
Special inspection requirement — Lighting controls
SERDAR CEYLAN
06/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
06/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
06/18/2025
Special inspection requirement — Mechanical Systems
SERDAR CEYLAN
06/18/2025
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
06/18/2025
Special inspection requirement — Final
SERDAR CEYLAN
06/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
SERDAR CEYLAN
06/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
06/18/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SERDAR CEYLAN
05/10/2024
Filed — Alteration
PLUMBING WORK TYPE IS FILED IN CONJUNCTION WITH #S00895902-I1 (ALT-CO) AS PER PLANS SUBMITTED.
S00922954-P3
04/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/12/2024
Filed — Alteration
PLUMBING WORK TYPE IS FILED IN CONJUNCTION WITH #S00895902-I1 (ALT-CO) AS PER PLANS SUBMITTED.
S00922954-P2
03/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 93 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MARFRAN REALTY2703/22/2026
ALL RITE CONST CO.603/22/2026
AUTOZONE203/21/2026
BLOCKBUSTER203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A TECH ENGINEERING NYC203/21/2026
ZARA GRILL403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MKNK WASTE REMOVAL INCGeneral Contractor706/28/2026
ZAIM CONTRACTOR CORPGeneral Contractor403/21/2026
A & B HEATING & AIR CONDIGeneral Contractor203/21/2026
OMUNDSEN CONSTRUCTION CORGeneral Contractor106/28/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
FELIX DIAZ JRElectrical103/21/2026
IPS PLUMBING CORPPlumbing107/08/2026
HOWARD ZAMKOFFElectrical103/21/2026
SANG CHEUNGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738307/28/2026
CEYLAN DESIGN AND CONSULT8422606/27/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedIPS PLUMBING CORP06/11/2026
DOB NOWMechanical SystemsPermit IssuedOMUNDSEN CONSTRUCTION COR05/12/2026
DOB NOWConstruction FencePermit IssuedMKNK WASTE REMOVAL INC09/30/2025
DOB NOWGeneral ConstructionPermit IssuedMKNK WASTE REMOVAL INC09/09/2025
DOB NOWMechanical SystemsPermit IssuedMKNK WASTE REMOVAL INC09/09/2025
DOB NOWPlumbingPermit IssuedA&H EXPRESS PLBG&HTG CORP10/03/2023
DOB NOWMechanical SystemsPermit IssuedSUFFOLK CONSTRUCT CO. INC09/18/2023
DOB NOWMechanical SystemsPermit IssuedSUFFOLK CONSTRUCT CO. INC09/18/2023
DOB NOWMechanical SystemsSigned-offA & B HEATING & AIR CONDI08/11/2021
BISPLISSUEDMARCO POLO PLBG & HTG INC08/06/2015
BISMHISSUEDALL-RITE CONSTRUCTION CO06/22/2015
BISPLISSUEDACCURATE PLBG & HTG CORP02/26/2014
BIS—ISSUEDL.S. SIGN CO., INC04/19/2011
BIS—ISSUEDL.S. SIGN CO., INC04/19/2011
BISOTISSUEDALL-RITE CONSTRUCTION CO02/24/2011
BISPLISSUEDACCURATE PLBG & HTG CORP02/24/2011
BISEQISSUEDALL-RITE CONSTRUCTION CO02/24/2011
BISOTISSUEDALL-RITE CONSTRUCTION CO02/24/2011
BISMHISSUEDALL-RITE CONSTRUCTION CO02/24/2011
BISMHISSUEDMICHELLE KUO CORP10/01/2007
BISPLISSUEDPINNACLE PLBG & HTG CORP02/23/2007
BISOTISSUEDMICHELLE KUO CORP02/15/2007
BIS—ISSUEDAMERICAN SIGN & ELECL CON12/16/2003
BIS—ISSUEDAMERICAN SIGN & ELECL CON12/16/2003
BISOTISSUEDDONNELLY INDUSTRIES INC09/03/2003
BISEQISSUEDDONNELLY INDUSTRIES INC09/03/2003
BISMHISSUEDSKYLINE CONST CORP05/06/2003
BISPLISSUEDFRANK LIQUORI PLMBG. & HTG. INC06/20/2002
BISPLISSUEDFRANK LIQUORI PLBG & HTG INC09/06/2001
BIS—ISSUEDBIG D'S CONSTRUCTION CORP.06/21/2001
BISFPISSUEDLUND FIRE PRODUCTS CO. INC.02/25/1999
BISFPISSUEDLUND FIRE PRODUCTS CO. INC.06/14/1996
BISPLISSUEDRJ BRUNO INC12/30/1994
BISPLISSUEDRJ BRUNO INC11/15/1994
BIS—ISSUEDL.S. SIGN CO. INC.09/19/1994
BIS—ISSUEDL.S. SIGN CO. INC.09/19/1994
BISMHISSUEDINTER-COUNTY MECHANICAL CORP.08/29/1994
BISOTISSUEDTRI BROS CONSTRUCTION CORP.07/15/1994
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/18/2026Fail-Final PL - UndergroundFailView ↗
04/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
07/28/2026Energy Code Compliance Inspectionsanthony santoroprogress
07/24/2026Mechanical Systemsanthony santorospecial
07/24/2026Finalanthony santoroprogress
05/05/2026Duct leakage testing, insulation and designanthony santoroenergy_progress
05/05/2026Mechanical Systemsanthony santorospecial
05/05/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
05/05/2026FinalVincent Torchioprogress
05/05/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
09/02/2025Lighting controlsSERDAR CEYLANenergy_progress
09/02/2025HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
09/02/2025HVAC-R and service water heating system controlsSERDAR CEYLANenergy_progress
09/02/2025Interior lighting powerSERDAR CEYLANenergy_progress
09/02/2025HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
09/02/2025Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
09/02/2025Mechanical SystemsSERDAR CEYLANspecial
09/02/2025Energy Code Compliance InspectionsSERDAR CEYLANprogress
09/02/2025Fire-Resistance Rated ConstructionSERDAR CEYLANprogress
09/02/2025FinalSERDAR CEYLANprogress
09/02/2025Fenestration areasSERDAR CEYLANenergy_progress
09/02/2025Fenestration and door U-factor and product ratingsSERDAR CEYLANenergy_progress
06/18/2025Fenestration areasSERDAR CEYLANenergy_progress
06/18/2025Lighting controlsSERDAR CEYLANenergy_progress
06/18/2025HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
06/18/2025Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
06/18/2025Mechanical SystemsSERDAR CEYLANspecial
Latest 25 of 48.
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/25/2026S00569582-I1Request digital key ↗
08/21/2026S00922954-P3Request digital key ↗
08/21/2026S00922954-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits18
▸BISWORK PERMIT APPLICATION11
08/06/2015520236931Open ↗
06/23/2015520236931Open ↗
03/04/2014520059294Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
08/21/2015520236931Open ↗
06/15/2015520236931Open ↗
03/30/2011520062468Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/25/2026S00569582-I1Open ↗
08/21/2026S00922954-P2Open ↗
08/21/2026S00922954-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/18/2026S01397377-I1Open ↗
09/18/2026S01397377-I1Open ↗
09/02/2026S00895902-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
01/25/2016520236931Open ↗
06/15/2015520236931Open ↗
06/15/2015520236931Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/15/2015520236931Open ↗
03/30/2011520062468Open ↗
03/30/2011520062486Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/18/2026S01397377-I1Open ↗
09/02/2026S00895902-I1Open ↗
08/23/2026S01436028-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
03/30/2011520062468Open ↗
03/30/2011520062486Open ↗
02/10/2011520059294Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT1
08/15/2007510012898Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/15/2015520236931Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY1
08/15/2007510012898Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/15/2015520236931Open ↗
▸BISEQUIPMENT USE PERMITS1
12/22/2015520236931Open ↗
▸BISSCHEDULE B - PLUMBING1
02/10/2011520059294Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
09/09/2015520236931Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/25/2016520236931Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026S00922954-P2Open ↗
08/21/2026S00922954-P1Open ↗
08/21/2026S00922954-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
03/30/2011520062468Open ↗
03/30/2011520062486Open ↗
02/10/2011520059294Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/25/2016520236931Open ↗
06/15/2015520236931Open ↗
06/15/2015520236931Open ↗
▸BISTECHNICAL REPORT: ENERGY1
02/10/2011520059294Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/25/2016520236931Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00569582-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS5
06/15/2015520236931Open ↗
03/30/2011520062468Open ↗
03/30/2011520062486Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/30/2015520236931Open ↗
06/23/2011520062486Open ↗
06/23/2011520062468Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
01/25/2016520236931Open ↗
06/15/2015520236931Open ↗
06/23/2011520062486Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET6
06/15/2015520236931Open ↗
03/30/2011520062468Open ↗
03/30/2011520062486Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION1
08/21/2015520236931Open ↗
▸Other Documents1
▸BISECCCNYS Analysis1
02/10/2011520059294Open ↗