← Back
Shopping center, with or without parking
Georgetowne Shopping Center
2183 RALPH AVENUE · BIN 3326928
💬 Discuss this project
1969Year Built
1Stories
K6Building Class
R3-2Zoning
156,536 sfGross Floor Area
29Units
LL97 Covered4 Open Violations 1 unresolved · 3 paperwork only ▸FDNY Report ↗
Shopping center, with or without parking · Owner of record: FR GEORGETOWNE, LLC · 293,000 sf lot · 0.53 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction14p · 3 filings · 20 docs
Floor 1Under Construction19p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FEDERAL REALTY3009/01/2026
FEDERAL REALTY INVESTMENT TRUST1107/08/2026
VGR807/08/2026
FR GEORGETOWNE, LLC103/22/2026
HI-RITE ELECTRIC CORP103/22/2026
WALDBAUM203/22/2026
OWNER OF 2167 RALPH AVE103/22/2026
ASTORIA HOLDING3803/22/2026
VICTORY BUILDING SERVICES LLC103/22/2026
SEIKOU GROUP LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PROJECT ENTRY303/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
BUILDING BROTHERS803/21/2026
LOUIS STRIAR403/21/2026
W J PROFESSIONAL EXPEDITING COMPANY1403/21/2026
INDESIGN STUDIO403/21/2026
MILETO ARCH ASSOCAITE DPC1203/21/2026
GREGORY RALPH ARCHITECT403/21/2026
CITISCAPE CONSULTING LTD203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RETAIL PROJECT MANGEMENTGeneral Contractor404/09/2026
RRP PLUMBING CORPPlumbing407/08/2026
NEPTUNE SIGNS AWNINGSScaffold307/08/2026
VICTORY BUILDING & CONSGeneral Contractor303/21/2026
CAPITOL FIRE SPRINKLERPlumbing203/22/2026
FRANK MARCELLINOElectrical203/21/2026
S & L PLUMBING INCPlumbing207/08/2026
ACTIVE SIGNSScaffold207/08/2026
FIVE TOWN NEON SIGN CO INScaffold207/08/2026
CAPITOL FIRE SPRINKLER COFire Protection107/08/2026
YONGXIN INT CONTRACTOR I*General Contractor107/08/2026
DRILON PLBG & HTG INCPlumbing107/08/2026
PAUL SIGNSScaffold107/08/2026
FRANCIS, SHERWINElectrical103/21/2026
SIGNSTAR NYCScaffold107/08/2026
HI-RITE ELECTRIC CORPElectrical103/22/2026
JONG HYUN KIMElectrical103/22/2026
KEYSTONE MECHANICAL INCElectrical103/21/2026
ORLANDO TORRESElectrical103/21/2026
PENNACHIO, RElectrical103/21/2026
SAGASER, JACOBElectrical103/21/2026
TOMASZ PUZAElectrical103/21/2026
TORRES ORLANDOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BRIAN ILL DEVELOPMENT LLC1402405/15/2026
SOIL MECHANICS DRILLING C2325402/27/2026
AMERILAND BROOK LLC1506301/27/2026
WHITESTONE ASSOCIATES ENG8144103/24/2025
YAN GAO6619109/24/2024
ALLEN SHINFELD, P.E. PLLC1305311/01/2021
CROSSCHECK INSPECTION SER544102/03/2021
Building Lifecycle
All (148)Filed (33)Permit Issued (19)Signed Off (14)Violation (40)Inspection (12)Special Inspection (30)
06/02/2026
Signed off — Alteration
INTERIOR RENOVATION OF TAKE-OUT ON THE FIRST FLOOR. INSTALLATION OF NEW KITCHEN EQUIPMENT, KITCHEN EXHAUST SYSTEM, PLUMBING FIXTURES, NEW PARTITIONS, FLOOR/WALL/CEILING FINISHES. REPLACE HVAC UNIT. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01126181-S1
06/02/2026
Signed off — Alteration
INTERIOR RENOVATION OF TAKE-OUT ON THE FIRST FLOOR. INSTALLATION OF NEW KITCHEN PREP SINKS AND PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01122440-I1
06/02/2026
Signed off — Alteration
INTERIOR RENOVATION OF TAKE-OUT ON THE FIRST FLOOR. INSTALLATION OF NEW KITCHEN EQUIPMENT, KITCHEN EXHAUST SYSTEM, PLUMBING FIXTURES, NEW PARTITIONS, FLOOR/WALL/CEILING FINISHES. REPLACE HVAC UNIT. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01126181-I1
05/15/2026
Filed — Alteration
INTERIOR RENOVATION OF TAKE-OUT ON THE FIRST FLOOR. INSTALLATION OF NEW KITCHEN PREP SINKS AND PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01122440-P2
05/15/2026
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
05/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
05/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
05/14/2026
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
05/01/2026
Permit issued — Plumbing
B01122440-I1-PL
03/05/2026
Violation issued (FDNY_NOV, closed)
03/04/2026
Violation issued (FDNY_NOV, closed)
03/02/2026
Special inspection requirement — Post-installed Anchors
Joseph Bizarroque
03/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joseph Bizarroque
03/02/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Joseph Bizarroque
03/02/2026
Special inspection requirement — Final
Joseph Bizarroque
03/02/2026
Special inspection requirement — Concrete - Cast-In-Place
Joseph Bizarroque
02/27/2026
Filed — Alteration
FILING FOR PLUMBING FIT OUT OF EXISTING 1ST FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01197463-P3
02/27/2026
Special inspection requirement — Fenestration air leakage
Mudar Khantamr
02/27/2026
Special inspection requirement — Insulation placement and R values
Mudar Khantamr
02/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Mudar Khantamr
02/27/2026
Special inspection requirement — Fenestration areas
Mudar Khantamr
02/27/2026
Special inspection requirement — Final
Joseph Bizarroque
02/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Bizarroque
02/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
Joseph Bizarroque
02/27/2026
Special inspection requirement — Sprayed fire-resistant materials
Joseph Bizarroque
02/27/2026
Special inspection requirement — Air barrier - visual inspection
Mudar Khantamr
02/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Mudar Khantamr
02/26/2026
Filed — Alteration
FILING FOR PLUMBING FIT OUT OF EXISTING 1ST FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01197463-P1
02/26/2026
Filed — Alteration
FILING FOR PLUMBING FIT OUT OF EXISTING 1ST FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01197463-P2
02/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Mudar Khantamr
02/26/2026
Special inspection requirement — Post-installed Anchors
Joseph Bizarroque
02/26/2026
Special inspection requirement — Insulation placement and R values
Mudar Khantamr
02/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Mudar Khantamr
02/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joseph Bizarroque
02/26/2026
Special inspection requirement — Fenestration areas
Mudar Khantamr
02/26/2026
Special inspection requirement — Fenestration air leakage
Mudar Khantamr
02/26/2026
Special inspection requirement — Air barrier - visual inspection
Mudar Khantamr
02/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
Joseph Bizarroque
01/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/27/2026
Filed — Alteration
INTERIOR RENOVATION OF TAKE-OUT ON THE FIRST FLOOR. INSTALLATION OF NEW KITCHEN EQUIPMENT, KITCHEN EXHAUST SYSTEM, PLUMBING FIXTURES, NEW PARTITIONS, FLOOR/WALL/CEILING FINISHES. REPLACE HVAC UNIT. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01126181-P2
01/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/02/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/23/2025
Permit issued — Plumbing
B01197463-S3-PL
10/21/2025
Permit issued — Mechanical Systems
B01197463-S2-MS
10/21/2025
Permit issued — Structural
B01197463-S1-ST
10/20/2025
Permit issued — General Construction
B01197463-I1-GC
10/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/26/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/24/2025
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01267490-I1
08/18/2025
Signed off — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01209015-I1
07/08/2025
Filed — Alteration
INTERIOR RENOVATION OF TAKE-OUT ON THE FIRST FLOOR. INSTALLATION OF NEW KITCHEN EQUIPMENT, KITCHEN EXHAUST SYSTEM, PLUMBING FIXTURES, NEW PARTITIONS, FLOOR/WALL/CEILING FINISHES. REPLACE HVAC UNIT. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01126181-P1
06/20/2025
Permit issued — Sprinklers
B01126181-S1-EW-SP
06/03/2025
Violation issued (ECB, closed)
Unknown
05/29/2025
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
05/20/2025
Permit issued — Sign
B01209015-I1-SG
05/14/2025
Filed — Alteration
INTERIOR RENOVATION OF TAKE-OUT ON THE FIRST FLOOR. INSTALLATION OF NEW KITCHEN EQUIPMENT, KITCHEN EXHAUST SYSTEM, PLUMBING FIXTURES, NEW PARTITIONS, FLOOR/WALL/CEILING FINISHES. REPLACE HVAC UNIT. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01126181-S1
05/03/2025
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01209015-I1
04/11/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offS & L PLUMBING INC05/01/2026
DOB NOWPlumbingSigned-offRRP PLUMBING CORP10/23/2025
DOB NOWMechanical SystemsPermit IssuedRETAIL PROJECT MANGEMENT10/21/2025
DOB NOWStructuralPermit IssuedRETAIL PROJECT MANGEMENT10/21/2025
DOB NOWGeneral ConstructionPermit IssuedRETAIL PROJECT MANGEMENT10/20/2025
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO06/20/2025
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC05/20/2025
DOB NOWMechanical SystemsSigned-offYONGXIN INT CONTRACTOR I*02/21/2025
DOB NOWPlumbingSigned-offS & L PLUMBING INC02/20/2025
DOB NOWSignSigned-offDESTHERS, JOSEPH11/12/2024
DOB NOWSignSigned-offDESTHERS, JOSEPH10/26/2023
DOB NOWPlumbingSigned-offDRILON PLBG & HTG INC09/29/2021
DOB NOWMechanical SystemsSigned-offVICTORY BUILDING & CONS05/03/2021
DOB NOWSignSigned-offPAUL SIGNS, INC12/16/2020
DOB NOWSignSigned-offENRICO PASSARO11/25/2020
DOB NOWSignSigned-offENRICO PASSARO11/25/2020
DOB NOWSignSigned-offACTIVE SIGNS INC06/30/2020
DOB NOWSignSigned-offACTIVE SIGNS INC06/30/2020
DOB NOWSignSigned-offSIGNSTAR NYC02/19/2020
BISSPISSUEDJ. CAIAZZO PLBG & HTG CORP10/10/2018
BISOTISSUEDCUSTOM COMMERCIAL CONSTRUCTION10/03/2018
BISOTISSUEDCUSTOM COMMERCIAL CONSTRUCTION10/03/2018
BISFPISSUEDRELIABLE FIRE PROT. INC09/20/2018
BISSPISSUEDJ. CAIAZZO PLBG & HTG CORP07/24/2018
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR07/24/2018
BISPLISSUED7 C'S PLBG & HTG CORP07/24/2018
BISOTISSUEDCUSTOM COMMERCIAL CONSTRUCTION06/28/2018
BISOTISSUEDSOUTH EAST CONSTRUCTION G06/26/2018
BISPLISSUEDWNW & SONS PLBG & HTG INC06/26/2018
BISMHISSUEDSOUTH EAST CONSTRUCTION G06/26/2018
BISOTISSUEDVICTORY BUILDING & CONS04/18/2018
BISOTISSUEDVICTORY BUILDING & CONS04/18/2018
BISMHISSUEDVICTORY BUILDING & CONS03/02/2018
BISOTISSUEDVICTORY BUILDING & CONS02/26/2018
BISPLISSUEDWNW & SONS PLBG & HTG INC11/09/2017
BISOTISSUEDVICTORY BUILDING & CONS11/02/2017
BISOTISSUEDKORK INC10/20/2017
BIS—ISSUEDZ-CAR-D CORP04/20/2017
BISFPISSUEDALLIED FIRE CONTROL SVCS12/27/2016
BIS—ISSUEDCITY SIGNS INC12/21/2016
+ 29 more permits on file
2 projects · most recent 01/27/2026
Ventilation Systems Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/27/2026Signed-offYONGXIN INT CONTRACTOR I*Air Conditioning Systems, Ventilation Systems
Cooling
02/14/2024——Heating and Air Conditioning Systems, Ventilation Systems—
1 project · most recent 01/27/2026
Sprinkler System
FiledStatusContractorScope
01/27/2026Signed-offCAPITOL FIRE SPRINKLER COSprinkler System
4 projects · most recent 05/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/15/2026Signed-offS & L PLUMBING INCGas, Water/Sanitary
02/27/2026Signed-offRRP PLUMBING CORPGas, Water/Sanitary
01/27/2026———
02/14/2024——Gas
14 projects · most recent 07/15/2026
General Wiring
FiledStatusContractorScope
07/15/2026CompleteECS ELEC'L CONTG SERV INCGeneral Wiring
03/19/2026Permit IssuedL.E.B. ELECTRIC LTD—
06/20/2025CompleteJONG HYUN KIM—
06/11/2025CompleteHI-RITE ELECTRIC CORPGeneral Wiring
04/03/2025CompleteJONG HYUN KIM—
09/25/2024CompleteASKO ELEC CONST & MAIN IN—
11/08/2023CompleteASKO ELEC CONST & MAIN IN—
12/17/2020CompleteTMF ELEC'L CONTR. INC.—
07/17/2020Permit IssuedRAINBOW ELECTRIC CO., INC—
02/26/2020Permit IssuedRAINBOW ELECTRIC CO., INC—
10/02/2018Permit IssuedAPOLLO ELECTRIC INC.1 new_meters
09/17/2018Permit IssuedAPOLLO ELECTRIC INC.1 meters
09/07/2018CompleteHANISON ELECTRIC INCGeneral Wiring
06/21/2018CompleteACS ELECTRICAL CORPGeneral Wiring
1 project · most recent 01/27/2026
FiledStatusContractorScope
01/27/2026Signed-offCAPITOL FIRE SPRINKLER CO1 scope_items
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
01/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/26/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/29/2025Pass-Final Sign Permit InspectionPassView ↗
04/11/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/03/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/27/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
05/15/2026Energy Code Compliance InspectionsBRIAN ILLprogress
05/15/2026HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
05/15/2026Fire-Resistant Penetrations and JointsBRIAN ILLspecial
05/14/2026HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
05/14/2026Energy Code Compliance InspectionsBRIAN ILLprogress
05/14/2026Fire-Resistant Penetrations and JointsBRIAN ILLspecial
03/02/2026Post-installed AnchorsJoseph Bizarroquespecial
03/02/2026Structural Stability – Alterations of existing buildingsJoseph Bizarroquespecial
03/02/2026FinalJoseph Bizarroqueprogress
03/02/2026Subsurface Conditions – Fill Placement & In-Place DensityJoseph Bizarroquespecial
03/02/2026Concrete - Cast-In-PlaceJoseph Bizarroquespecial
02/27/2026Fenestration air leakageMudar Khantamrenergy_progress
02/27/2026Air barrier - visual inspectionMudar Khantamrenergy_progress
02/27/2026Energy Code Compliance InspectionsMudar Khantamrprogress
02/27/2026Fire-Resistance Rated ConstructionJoseph Bizarroqueprogress
02/27/2026FinalJoseph Bizarroqueprogress
02/27/2026Fire-Resistant Penetrations and JointsJoseph Bizarroquespecial
02/27/2026Sprayed fire-resistant materialsJoseph Bizarroquespecial
02/27/2026Fenestration areasMudar Khantamrenergy_progress
02/27/2026Insulation placement and R valuesMudar Khantamrenergy_progress
02/27/2026Fenestration and door U-factor and product ratingsMudar Khantamrenergy_progress
02/26/2026Post-installed AnchorsJoseph Bizarroquespecial
02/26/2026Energy Code Compliance InspectionsMudar Khantamrprogress
02/26/2026HVAC-R and service water piping design and insulationMudar Khantamrenergy_progress
02/26/2026Maintenance informationMudar Khantamrenergy_progress
Latest 25 of 71.
▾Documents — 660 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch18
09/03/2026B00001669-I1Request digital key ↗
09/01/2026B00598108-P2Request digital key ↗
09/01/2026B00598108-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Sign6
09/02/2026B00306824-I1Request digital key ↗
09/02/2026B00348751-I1Request digital key ↗
09/02/2026B00348741-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00421414-I1Request digital key ↗
09/01/2026B00461885-I1Request digital key ↗
▸Applications & Permits117
▸BISWORK PERMIT APPLICATION56
10/12/2018321815737Open ↗
10/04/2018321791227Open ↗
10/04/2018321791227Open ↗
Showing 3 of 56 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION45
10/04/2018321791227Open ↗
09/25/2018321815737Open ↗
09/05/2018321832200Open ↗
Showing 3 of 45 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION16
09/27/2018321791227Open ↗
09/20/2018321815737Open ↗
09/20/2018321815737Open ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications203
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION64
03/13/2019321791227Open ↗
01/24/2019321832200Open ↗
01/16/2019321791227Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/21/2026B00598108-P2Open ↗
09/21/2026B00598108-P2Open ↗
09/01/2026B01197463-S1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/03/2026B00001669-I1Open ↗
09/02/2026B00421414-I1Open ↗
09/02/2026B00407010-I1Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST23
07/30/2018321815737Open ↗
06/29/2018321791227Open ↗
05/25/2018321739213Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/21/2026B00598108-P2Open ↗
09/01/2026B01197463-S1Open ↗
09/01/2026B01197463-S1Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT20
07/30/2018321815737Open ↗
06/29/2018321791227Open ↗
05/25/2018321739213Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment47
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
10/04/2018321791227Open ↗
08/29/2018321739213Open ↗
08/29/2018321815737Open ↗
Showing 3 of 17 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
03/09/2017321278791Open ↗
03/09/2017321278791Open ↗
03/09/2017321278791Open ↗
Showing 3 of 11 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
01/24/2019321832200Open ↗
04/11/2017321460352Open ↗
▸BISEQUIPMENT USE PERMITS1
03/09/2017321278791Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes4
02/26/2018321795526Open ↗
10/23/2017321670278Open ↗
Showing 2 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
10/23/2017321674112Open ↗
▸Environmental & Asbestos44
▸BISASBESTOS: CERTIFICATION (DEP ACP5)22
10/12/2018321815737Open ↗
06/29/2018321791227Open ↗
05/25/2018321739213Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/02/2026B00421414-I1Open ↗
09/02/2026B00407010-I1Open ↗
09/02/2026B00407005-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Completion Form4
08/13/2026B01197463-S1Open ↗
08/13/2026B01197463-S2Open ↗
08/13/2026B01197463-S3Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance45
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS27
03/13/2019321791227Open ↗
06/29/2018321791227Open ↗
06/29/2018321791227Open ↗
Showing 3 of 27 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
03/13/2019321791227Open ↗
03/28/2018321674112Open ↗
Showing 2 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00598108-I1Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
01/31/2018321278808Open ↗
05/23/2017321278808Open ↗
05/23/2017321278808Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
05/23/2017321278808Open ↗
05/16/2017321278808Open ↗
Showing 2 of 3 on file for this type
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs44
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST24
05/14/2019321815737Open ↗
03/13/2019321791227Open ↗
01/24/2019321832200Open ↗
Showing 3 of 24 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
04/28/2017321540891Open ↗
Showing 1 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
06/12/2018321795526Open ↗
06/12/2018321795526Open ↗
06/12/2018321795526Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership50
▸BISCOST AFFIDAVIT50
05/14/2019321815737Open ↗
03/13/2019321791227Open ↗
01/24/2019321832200Open ↗
Showing 3 of 50 on file for this type
▸Filing & Intake Forms61
▸BISEFILING COVER SHEET28
09/05/2018321832200Open ↗
07/30/2018321815737Open ↗
06/28/2018321791227Open ↗
Showing 3 of 28 on file for this type
▸BISADDITIONAL INFORMATION21
01/18/2019321815737Open ↗
01/15/2019321815737Open ↗
10/03/2018321791227Open ↗
Showing 3 of 21 on file for this type
▸BISBOROUGH INTAKE FORM8
05/14/2019321815737Open ↗
03/13/2019321791227Open ↗
01/24/2019321832200Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents5
▸BISOP-4 - Special Report2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLOCAL LAW - SUPPPORTING DOCUMENTATION1
06/12/2018321795526Open ↗