← Back
One story retail building
2177 WHITE PLAINS ROAD
BRONX · BIN 2095032
💬 Discuss this project
1940Year Built
1Stories
K1Building Class
C4-4Zoning
9,650 sfGross Floor Area
4Units
0 Open Violations
One story retail building · Owner of record: DAVID PLAINS CO · 9,980 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 5 filings · 20 docs
Floor 16p · 1 filing · 15 docs
CellarUnder Construction6p · 4 filings · 20 docs
1 job · most recent 11/18/2020
FiledStatusContractorScope
11/18/2020———
2 jobs · most recent 07/15/2022
Water/Sanitary Gas
FiledStatusContractorScope
07/15/2022Permit IssuedCROSSFIELD P & H CORPGas, Water/Sanitary
11/18/2020——Water/Sanitary
4 jobs · most recent 03/15/2022
General Wiring
FiledStatusContractorScope
03/15/2022Permit IssuedKJK ELECTRIC INCGeneral Wiring
01/14/2021CompleteSIGNS CAD CORP—
12/02/2020CompleteUS1 ELECTRIC CORPGeneral Wiring
09/23/2020CompleteK.N.C ELECTRIC INCGeneral Wiring
Building Lifecycle
All (50)Filed (12)Permit Issued (9)Signed Off (2)Violation (7)Special Inspection (20)
05/14/2026
Signed off — Alteration
X01384059-I1
04/23/2026
Permit issued — Mechanical Systems
X01384059-I1-MS
04/17/2026
Filed — Alteration
X01384059-I1
04/17/2026
Special inspection requirement — Energy Code Compliance Inspections
YEON LEE
04/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
YEON LEE
04/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
YEON LEE
04/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
YEON LEE
04/16/2026
Special inspection requirement — Maintenance information
YEON LEE
04/07/2026
Special inspection requirement — Mechanical Systems
YEON LEE
04/07/2026
Special inspection requirement — Final
YEON LEE
02/10/2026
Permit issued — Plumbing
X01281030-S1-PL
02/10/2026
Permit issued — Mechanical Systems
X01281030-I1-MS
01/19/2026
Filed — Alteration
SUNSEQUENT FILING OF PLUMBING (GAS) WORK IN CONJUNCTION WITH X01281030-I1 (ROOF HVAC UNITS). WORK INCLUDES REPLACEMENT OF GAS METER WITH PIPING AS PER PLAN HEREWITH. THIS APPLICATION IS SUPERSEDING JOB#X00357835-I1. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
X01281030-I1
01/19/2026
Filed — Alteration
SUNSEQUENT FILING OF PLUMBING (GAS) WORK IN CONJUNCTION WITH X01281030-I1 (ROOF HVAC UNITS). WORK INCLUDES REPLACEMENT OF GAS METER WITH PIPING AS PER PLAN HEREWITH. THIS APPLICATION IS SUPERSEDING JOB#X00357835-I1. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
X01281030-S1
09/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
SUKHWAN KIM
09/03/2025
Special inspection requirement — Mechanical Systems
SUKHWAN KIM
09/03/2025
Special inspection requirement — Final
SUKHWAN KIM
09/03/2025
Special inspection requirement — Energy Code Compliance Inspections
SUKHWAN KIM
09/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUKHWAN KIM
07/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Wai
07/18/2022
Special inspection requirement — Mechanical Systems
James Wai
07/18/2022
Special inspection requirement — Interior lighting power
James Wai
07/18/2022
Special inspection requirement — Lighting controls
James Wai
07/18/2022
Special inspection requirement — Energy Code Compliance Inspections
James Wai
07/18/2022
Special inspection requirement — Fire-Resistance Rated Construction
James Wai
07/18/2022
Special inspection requirement — Final
James Wai
07/15/2022
Filed — Alteration
Interior renovation of existing eating and drinking establishment. Remove and install partition walls, finishing floor, walls and ceiling. Install exhaust system on roof. No change in egress, occupancy or use is involved under this application.
X00598956-P2
07/15/2022
Filed — Alteration
Interior renovation of existing eating and drinking establishment. Remove and install partition walls, finishing floor, walls and ceiling. Install exhaust system on roof. No change in egress, occupancy or use is involved under this application.
X00598956-P1
03/11/2022
Permit issued — Plumbing
X00598956-S1-PL
11/19/2021
Permit issued — Mechanical Systems
X00598956-I1-MS
11/05/2021
Permit issued — General Construction
X00598956-I1-GC
10/01/2021
Filed — Alteration
Interior renovation of existing eating and drinking establishment. Remove and install partition walls, finishing floor, walls and ceiling. Install exhaust system on roof. No change in egress, occupancy or use is involved under this application.
X00598956-S1
09/24/2021
Filed — Alteration
Interior renovation of existing eating and drinking establishment. Remove and install partition walls, finishing floor, walls and ceiling. Install exhaust system on roof. No change in egress, occupancy or use is involved under this application.
X00598956-I1
01/14/2021
Signed off — Alteration
REPLACE ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN ON THE EXISTING SIGN BAND FRAME, NO CHANGE TO USE, EGRESS OR OCCUPATION
X00402888-I1
11/27/2020
Violation issued (ECB, closed)
Unknown
11/18/2020
Filed — Alteration
INSTALLATION OF (3)SPRINKLER HEADS. THIS APPLICATION IS IN CONJUNCTION WITH ALT2# 240287202. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
X00423682-I1
11/18/2020
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURE. THIS APPLICATION IS IN CONJUNCTION WITH ALT2# 240287202. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
X00423660-I1
11/04/2020
Special inspection requirement — Sprinkler Systems
SUNGBOM YI
09/30/2020
Permit issued — Sign
X00402888-I1-SG
09/29/2020
Filed — Alteration
REPLACE ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN ON THE EXISTING SIGN BAND FRAME, NO CHANGE TO USE, EGRESS OR OCCUPATION
X00402888-I1
07/22/2020
Permit issued — Plumbing
X00357835-I1-PL
06/25/2020
Permit issued — Mechanical Systems
X00354672-I1-MS
06/17/2020
Filed — Alteration
X00357835-I1
06/17/2020
Filed — Alteration
X00354672-I1
12/26/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/26/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/1991
Violation issued (ECB, closed)
Construction
08/01/1990
Violation issued (ECB, closed)
Public Assembly
05/17/1989
Violation issued (ECB, closed)
Public Assembly
06/01/1988
Violation issued (ECB, closed)
Public Assembly
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAND ASSET MANAGEMENT1005/15/2026
PRIMAVERA PROPERTIES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEE ENGINEERING, P.C.104/17/2026
DESIGN GROUP IN H&K LLC201/19/2026
JKW ENGINEERING, P.C.407/15/2022
SY ENGINEERING PLLC211/18/2020
HC ARCHITECT, PC109/29/2020
GREEN DESIGN206/17/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN GROUP IN H K403/21/2026
JKW ENGINEERING PC803/21/2026
JP EXPEDITE203/21/2026
C PLUS DESIGN GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DELUXE CORPGeneral Contractor403/21/2026
PETER PLUMBING ASSOC.INCGeneral Contractor203/21/2026
KJK ELECTRIC INCElectrical103/22/2026
URIM SYLAElectrical103/21/2026
US1 ELECTRIC CORPElectrical103/22/2026
KL HVAC INCGeneral Contractor105/15/2026
UPPER RESTORATION INCGeneral Contractor107/08/2026
BRUCKNER PLUMBING LTDPlumbing107/08/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
PETER PLUMBING ASSOC. INC.Plumbing107/08/2026
FRANK ZIZZOElectrical103/21/2026
SIGNS CADScaffold107/08/2026
JAMES BASILEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEE ENGINEERING, P.C.2157104/17/2026
DESIGN GROUP IN H&K LLC1363201/19/2026
JKW ENGINEERING, P.C.1856207/15/2022
SY ENGINEERING PLLC5149111/18/2020
BUTTERFIELD & O'CONNOR4189206/17/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKL HVAC INC04/23/2026
DOB NOWPlumbingPermit IssuedPETER PLUMBING ASSOC. INC.02/10/2026
DOB NOWMechanical SystemsPermit IssuedPETER PLUMBING ASSOC.INC02/10/2026
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG03/11/2022
DOB NOWMechanical SystemsPermit IssuedDELUXE CORP11/19/2021
DOB NOWGeneral ConstructionPermit IssuedDELUXE CORP11/05/2021
DOB NOWSignSigned-offSIGNS CAD CORP09/30/2020
DOB NOWPlumbingPermit IssuedBRUCKNER PLUMBING LTD07/22/2020
DOB NOWMechanical SystemsPermit IssuedUPPER RESTORATION INC06/25/2020
BISOTISSUEDSTONEGATE MGM INC09/23/2020
BISEQISSUEDDOW CONSTRUCTION AND DESI10/20/2009
BISOTISSUEDLEE & COMPANY OF NY, INC02/27/2007
BIS—ISSUEDBERGER SIGN FABRICATION INC03/23/2001
BIS—ISSUEDBERGER SIGN FABRICATION INC03/23/2001
BIS—ISSUEDBERGER SIGN FABRICATION INC03/23/2001
BISSPISSUEDSTARMET FIRE EQUIPMENT INC.01/10/2000
BISFPISSUEDSAFETY CONSULTANTS INC11/18/1999
BISEQISSUEDFULL SERVICE CONTRATING09/21/1999
BISOTISSUEDFULL SERVICE CONTRATING09/21/1999
BISOTISSUEDFULL SERVICE CONTRACTING07/27/1999
BISMHISSUEDBROIS CONSTRUCTION01/26/1995
BISOTISSUEDBROIS CONTRACTION CORP.12/15/1994
BISFPISSUEDALLSTATE FIRE & SAFETY EQUIPMENT11/27/1992
BISMHISSUEDROYAL CARD & STATIONERY07/25/1991
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
04/17/2026Energy Code Compliance InspectionsYEON LEEprogress
04/16/2026HVAC-R and service water heating system controlsYEON LEEenergy_progress
04/16/2026HVAC-R and service water heating equipmentYEON LEEenergy_progress
04/16/2026HVAC-R and service water piping design and insulationYEON LEEenergy_progress
04/16/2026Maintenance informationYEON LEEenergy_progress
04/07/2026Mechanical SystemsYEON LEEspecial
04/07/2026FinalYEON LEEprogress
09/03/2025HVAC-R and service water heating equipmentSUKHWAN KIMenergy_progress
09/03/2025Mechanical SystemsSUKHWAN KIMspecial
09/03/2025FinalSUKHWAN KIMprogress
09/03/2025Energy Code Compliance InspectionsSUKHWAN KIMprogress
09/03/2025Fire-Resistant Penetrations and JointsSUKHWAN KIMspecial
07/18/2022Fire-Resistant Penetrations and JointsJames Waispecial
07/18/2022Mechanical SystemsJames Waispecial
07/18/2022Interior lighting powerJames Waienergy_progress
07/18/2022Lighting controlsJames Waienergy_progress
07/18/2022Energy Code Compliance InspectionsJames Waiprogress
07/18/2022Fire-Resistance Rated ConstructionJames Waiprogress
07/18/2022FinalJames Waiprogress
11/04/2020Sprinkler SystemsSUNGBOM YIspecial
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch7
08/24/2026X00598956-P2Contact architect ↗
08/24/2026X00598956-P1Contact architect ↗
08/24/2026X00598956-S1Contact architect ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing Legalization1
08/26/2026X00357835-I1Contact architect ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/25/2026X00423660-I1Contact architect ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026X00354672-I1Contact architect ↗
▸DOB NOWPlans/Sketch - Sign1
08/25/2026X00402888-I1Contact architect ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/25/2026X00423682-I1Contact architect ↗
▸Applications & Permits9
▸BISPLACE OF ASSEMBLY3
04/22/2025220614887Open ↗
02/27/2019220614887Open ↗
09/20/2017220614887Open ↗
▸BISWORK PERMIT APPLICATION3
09/23/2020240287202Open ↗
10/20/2009220033041Open ↗
10/20/2009220033041Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
05/29/2025220614887Open ↗
09/22/2020240287202Open ↗
10/20/2009220033041Open ↗
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026X00354672-I1Open ↗
08/26/2026X00357835-I1Open ↗
08/25/2026X00423660-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/29/2026X01384059-I1Open ↗
08/29/2026X01384059-I1Open ↗
08/29/2026X01384059-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026X01384059-I1Open ↗
08/25/2026X01281030-S1Open ↗
08/24/2026X01281030-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/20/2017220614887Open ↗
10/20/2009220033041Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/22/2020240287202Open ↗
09/20/2017220614887Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/20/2017220614887Open ↗
10/20/2009220033041Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/20/2009220033041Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/22/2020240287202Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/22/2020240287202Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/20/2009220033041Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/26/2026X00354672-I1Open ↗
08/26/2026X00357835-I1Open ↗
08/25/2026X00423660-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/20/2009220033041Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/22/2020240287202Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/23/2020240287202Open ↗
09/22/2020240287202Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/22/2020240287202Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/23/2020240287202Open ↗
09/22/2020240287202Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
10/20/2009220033041Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/06/2019220614887Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/22/2020240287202Open ↗
10/20/2009220033041Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
05/29/2025220614887Open ↗
02/27/2019220614887Open ↗
09/20/2017220614887Open ↗
▸BISEFILING COVER SHEET1
10/20/2009220033041Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/22/2020240287202Open ↗