← Back
Miscellaneous asylum / home
218-04 140 AVENUE
QUEENS · Laurelton · BIN 4310894
💬 Discuss this project
1987Year Built
2Stories
N9Building Class
R3-2Zoning
5,675 sfGross Floor Area
6Units
0 Open ViolationsFDNY Report ↗
Miscellaneous asylum / home · Owner of record: PROGRAM PLANND/LF/EN/INC · 5,950 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingFire Protection
Roof2p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IAQ SYSTEMS INC110/30/2025
MITROPOULOS ARCHITECT404/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MIELE ASSOCIATES, LLP1003/21/2026
Building Lifecycle
All (103)Filed (5)Permit Issued (1)Violation (12)Objection (55)Special Inspection (30)
10/01/2026
Permit issued — Construction Fence
Q00969902-I1-FN
04/21/2026
Objection resolved — Resolved
04/14/2026
Objection resolved — Resolved
04/10/2026
Objection raised — Scope
03/05/2026
Special inspection requirement — Air barrier continuity plan testing
03/05/2026
Special inspection requirement — Air barrier — testing
02/13/2026
Objection raised — Structural
01/29/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
01/14/2026
Objection raised — Admin
11/22/2025
Objection raised — Scope
11/22/2025
Objection raised — Plumbing
11/22/2025
Objection raised — Scope
11/22/2025
Objection raised — Mechanical
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2025
Filed — Alteration CO
Propose to alter existing 20 bed community residence, Occupancy Classification J2, Use Group 2, to 20 bed community residence, Occupancy Classification I-1, Use Group III(A), as per plans filed herewith.
Q00963937-S3
10/29/2025
Objection resolved — Addressed
10/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
10/29/2025
Special inspection requirement — Duct leakage testing, insulation and design
10/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
10/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
10/29/2025
Special inspection requirement — Maintenance information
10/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/24/2025
Special inspection requirement — Fenestration areas
10/24/2025
Special inspection requirement — Metering
10/24/2025
Special inspection requirement — Lighting in dwelling units
10/24/2025
Special inspection requirement — Protection of exposed foundation insulation
10/24/2025
Special inspection requirement — Duct leakage testing, insulation and design
10/23/2025
Special inspection requirement — Mechanical Systems
10/23/2025
Special inspection requirement — Final
10/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/17/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
09/25/2025
Special inspection requirement — Energy Code Compliance Inspections
09/25/2025
Special inspection requirement — Structural Wood Frame
09/17/2025
Objection resolved — Addressed
05/20/2025
Objection raised — Other
05/19/2025
Objection raised — Other
05/07/2025
Objection resolved — Addressed
05/07/2025
Objection resolved — Addressed
05/07/2025
Objection resolved — Addressed
05/07/2025
Objection resolved — Addressed
05/07/2025
Objection resolved — Addressed
05/07/2025
Objection resolved — Addressed
04/09/2025
Objection resolved — Addressed
04/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
04/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
04/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/2024
Objection raised — Scope
04/11/2024
Objection raised — Scope
04/11/2024
Objection raised — Scope
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedMICHAEL BORRUTO GENERAL CONTR.10/01/2026
1 project · most recent 10/30/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/30/2025——Heating and Air Conditioning Systems, Ventilation Systems
Ventilation
Greenheck MODEL NO. SP-110-VG 75 CFM · Exhaust Fan ×7
Heat / Cool
Lg MODEL NO. ARNU053SJA4 6,000 BTU · Vrf Indoor ×14
MODEL NO. ARNU093SJA4 9,600 BTU · Vrf Indoor ×10
MODEL NO. ARNU183SKA4 19,100 BTU · Vrf Indoor ×2
MODEL NO. ARNU243SKA4 23,297 BTU · Vrf Indoor ×2
MODEL ARUM121BTE5 119,700 BTU · Vrf Outdoor ×1
MODEL: ARUM072BTE5 72,000 BTU · Vrf Outdoor ×1
MODEL: ARUM096BTE5 96,000 BTU · Vrf Outdoor ×1
Qmark MODEL CWH120DSF 2 kW · Electric Heater ×15
MODEL CDF548 4 kW · Electric Heater ×1
Greenheck MODEL SP-110-VG 75 CFM · Exhaust Fan ×7
1 project · most recent 10/30/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/30/2025——Gas, Storm, Water/Sanitary
1 project · most recent 10/30/2025
Steel Concrete Masonry Wood
FiledStatusContractorScope
10/30/2025——Steel, Concrete, Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
03/05/2026Air barrier continuity plan testing—energy_progress
03/05/2026Air barrier — testing —energy_progress
10/29/2025HVAC-R and service water piping design and insulation—energy_progress
10/29/2025Duct leakage testing, insulation and design—energy_progress
10/29/2025HVAC-R and service water heating equipment—energy_progress
10/29/2025HVAC-R and service water heating system controls—energy_progress
10/29/2025Maintenance information—energy_progress
10/29/2025Structural Stability – Alterations of existing buildings—special
10/24/2025Fenestration areas—energy_progress
10/24/2025Metering—energy_progress
10/24/2025Lighting in dwelling units—energy_progress
10/24/2025Protection of exposed foundation insulation—energy_progress
10/24/2025Duct leakage testing, insulation and design—energy_progress
10/23/2025Mechanical Systems—special
10/23/2025Final—progress
10/23/2025Tenant Protection Plan Compliance—special
09/25/2025Energy Code Compliance Inspections—progress
09/25/2025Structural Wood Frame—progress
04/08/2025HVAC-R and service water heating equipment—energy_progress
04/08/2025HVAC-R and service water heating system controls—energy_progress
04/08/2025HVAC-R and service water piping design and insulation—energy_progress
02/13/2024Tenant Protection Plan Compliance—special
02/13/2024Tenant Protection Plan Compliance—special
02/13/2024Tenant Protection Plan Compliance—special
12/01/2023Sprinkler Systems—special
Latest 25 of 44.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
OMH - Phoenix House Long IslandOther—
Project Q00963937 Alteration CO · Plan Examiner Review · 04/01/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026Q00969902-I1Request digital key ↗
08/18/2026Q00963937-I1Request digital key ↗
08/18/2026Q00963937-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/18/2026Q00963937-I1Open ↗
08/13/2026Q00963937-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/18/2026Q00963937-I1Open ↗
08/13/2026Q00963937-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026Q00963937-S3Open ↗
08/18/2026Q00963937-S2Open ↗
08/18/2026Q00963937-S1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00963937-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026Q00963937-S3Open ↗
08/18/2026Q00963937-S2Open ↗
08/18/2026Q00963937-S1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026Q00963937-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/13/2026Q00963937-S2Open ↗
08/13/2026Q00963937-S1Open ↗
08/13/2026Q00963937-S3Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00963937-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00963937-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q00963937-I1Open ↗