← Back
Two stories - detached, small or mid-size
218-04 40 AVENUE
QUEENS · BIN 4138525
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R2AZoning
2,090 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: VK191 PROPERTY LLC · 6,000 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VK191 PROPERTY403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/20/2025$1.1M—Private party → VK191 PROPERTY LLC$538/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEI ARCHITECT PLLC107/02/2026
MEHDI GHAZI203/10/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC403/21/2026
Building Lifecycle
All (36)Filed (3)Objection (10)Special Inspection (23)
09/17/2026
Objection resolved — Resolved
09/17/2026
Objection resolved — Resolved
09/17/2026
Objection resolved — Resolved
09/17/2026
Objection resolved — Resolved
09/17/2026
Objection resolved — Resolved
08/10/2026
Objection raised — Structural
08/10/2026
Objection raised — Zoning
08/10/2026
Objection raised — Structural
08/10/2026
Objection raised — Admin
08/10/2026
Objection raised — Zoning
07/02/2026
Filed — New Building
PROPOSED NEW 2-STORY DETACHED RESIDENCE FOR SINGLE-DWELLING UNIT. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01396164-I1
05/04/2026
Special inspection requirement — Permanent certificate
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/04/2026
Special inspection requirement — Heating Systems
05/04/2026
Special inspection requirement — Interior lighting power
05/04/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
05/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/04/2026
Special inspection requirement — Air barrier — testing
05/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/04/2026
Special inspection requirement — Maintenance information
05/04/2026
Special inspection requirement — Fenestration air leakage
05/04/2026
Special inspection requirement — Air barrier - visual inspection
05/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/04/2026
Special inspection requirement — Protection of exposed foundation insulation
05/04/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/04/2026
Special inspection requirement — Insulation placement and R values
05/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/04/2026
Special inspection requirement — Electric vehicle service equipment requirements
05/04/2026
Special inspection requirement — Fenestration areas
05/04/2026
Special inspection requirement — Ventilation and air distribution system
05/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/01/2026
Special inspection requirement — Mechanical Systems
05/01/2026
Special inspection requirement — Final
03/10/2026
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE FOR LOT #1 AND #2 W/ 160'-0" FRONTAGE AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01335293-I1
11/24/2025
Filed — Full Demolition
FULL DEMOLITION ON EXISTING 2-STORY DETACHED RESIDENCE.
Q01307977-I1
Nothing on file for this building.
1 project · most recent 07/02/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/02/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NLHZ 48,000 BTU · Heat Pump Outdoor ×3
1 project · most recent 03/10/2026
Fence
FiledStatusContractorScope
03/10/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
05/04/2026Permanent certificate—energy_progress
05/04/2026Fire-Resistant Penetrations and Joints—special
05/04/2026Heating Systems—special
05/04/2026Interior lighting power—energy_progress
05/04/2026Subsurface Investigations (Borings/Test Pits)—special
05/04/2026Energy Code Compliance Inspections—progress
05/04/2026Fire-Resistance Rated Construction—progress
05/04/2026Air barrier — testing —energy_progress
05/04/2026HVAC-R and service water heating system controls—energy_progress
05/04/2026Maintenance information—energy_progress
05/04/2026Fenestration air leakage—energy_progress
05/04/2026Air barrier - visual inspection—energy_progress
05/04/2026HVAC-R and service water piping design and insulation—energy_progress
05/04/2026Protection of exposed foundation insulation—energy_progress
05/04/2026Duct leakage testing, insulation and design—energy_progress
05/04/2026Insulation placement and R values—energy_progress
05/04/2026Fenestration and door U-factor and product ratings—energy_progress
05/04/2026Electric vehicle service equipment requirements—energy_progress
05/04/2026Fenestration areas—energy_progress
05/04/2026Ventilation and air distribution system—energy_progress
05/04/2026HVAC-R and service water heating equipment—energy_progress
05/01/2026Mechanical Systems—special
05/01/2026Final—progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026Q01307977-I1Request digital key ↗
08/17/2026Q01335293-I1Request digital key ↗
08/15/2026Q01396164-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026Q01396164-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026Q01396164-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026Q01307977-I1Open ↗
08/16/2026Q01396164-I1Open ↗
08/13/2026Q01335293-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/15/2026Q01396164-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/18/2026Q01307977-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01307977-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026Q01396164-I1Open ↗