← Back
QUEENS
218-05 135 AVENUE
QUEENS · BIN 4624858
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureMechanical
Floor 23p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J J DESIGNS203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.602/23/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor807/08/2026
VMC PLUMBING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D&E BUILD EVERGREEN I9342302/23/2026
CL ENGINEERING P.C.6781105/07/2024
TRIANGLE INSPECTION & TES7495105/07/2024
Building Lifecycle
All (59)Filed (6)Permit Issued (5)Signed Off (4)Violation (2)Inspection (10)Objection (2)Special Inspection (30)
04/21/2026
Signed off — New Building
Curb cut application filed in conjunction with NB applications #Q00945648-I1 & #Q00945653-I1. Propose 10'-0" curb cut with 1' splay on 135 AVENUE 208.74' From 219 STREET.
Q00945648-I1
04/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2026
Special inspection requirement — Interior lighting power
Danny Chen
03/12/2026
Special inspection requirement — Air barrier — testing
Danny Chen
03/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Danny Chen
03/12/2026
Special inspection requirement — Metering
Danny Chen
03/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Danny Chen
03/12/2026
Special inspection requirement — Fenestration air leakage
Danny Chen
03/12/2026
Special inspection requirement — Permanent certificate
Danny Chen
03/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Danny Chen
03/12/2026
Special inspection requirement — Mechanical Systems
Danny Chen
03/12/2026
Special inspection requirement — Masonry
Danny Chen
03/12/2026
Special inspection requirement — Heating Systems
Danny Chen
03/12/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Danny Chen
03/12/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/12/2026
Special inspection requirement — Concrete - Cast-In-Place
Danny Chen
03/12/2026
Special inspection requirement — Subgrade Inspections
Danny Chen
03/12/2026
Special inspection requirement — Structural Steel - Details
Danny Chen
03/12/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Danny Chen
03/12/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Danny Chen
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
03/12/2026
Special inspection requirement — Footing and Foundation
Danny Chen
03/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
Danny Chen
03/12/2026
Special inspection requirement — Structural Wood Frame
Danny Chen
03/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Danny Chen
03/12/2026
Special inspection requirement — Final
PETER CHO
03/12/2026
Special inspection requirement — Fenestration areas
Danny Chen
03/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Danny Chen
03/12/2026
Special inspection requirement — Air barrier - visual inspection
Danny Chen
03/12/2026
Special inspection requirement — Electric vehicle service equipment requirements
Danny Chen
03/12/2026
Special inspection requirement — Duct leakage testing, insulation and design
Danny Chen
03/12/2026
Special inspection requirement — Insulation placement and R values
Danny Chen
02/23/2026
Filed — New Building
Curb cut application filed in conjunction with NB applications #Q00945648-I1 & #Q00945653-I1. Propose 10'-0" curb cut with 1' splay on 135 AVENUE 208.74' From 219 STREET.
Q00945648-P2
01/14/2026
Signed off — New Building
Curb cut application filed in conjunction with NB applications #Q00945648-I1 & #Q00945653-I1. Propose 10'-0" curb cut with 1' splay on 135 AVENUE 208.74' From 219 STREET.
Q00945648-S2
01/07/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/13/2025
Signed off — New Building
Curb cut application filed in conjunction with NB applications #Q00945648-I1 & #Q00945653-I1. Propose 10'-0" curb cut with 1' splay on 135 AVENUE 208.74' From 219 STREET.
Q00945648-S1
11/12/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
11/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/15/2025
Filed — New Building
Curb cut application filed in conjunction with NB applications #Q00945648-I1 & #Q00945653-I1. Propose 10'-0" curb cut with 1' splay on 135 AVENUE 208.74' From 219 STREET.
Q00945648-P1
07/02/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/27/2025
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
06/25/2025
Permit issued — Curb Cut
Q00945648-S2-CC
06/24/2025
Signed off — New Building
Curb cut application filed in conjunction with NB applications #Q00945648-I1 & #Q00945653-I1. Propose 10'-0" curb cut with 1' splay on 135 AVENUE 208.74' From 219 STREET.
Q00945648-S3
04/24/2025
Violation issued (ECB, closed)
Unknown
04/24/2025
Violation issued (ECB, closed)
Construction
10/11/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/04/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/10/2024
Permit issued — Plumbing
Q00945648-S1-PL
06/26/2024
Permit issued — Construction Fence
Q00945648-S3-FN
06/18/2024
Filed — New Building
Curb cut application filed in conjunction with NB applications #Q00945648-I1 & #Q00945653-I1. Propose 10'-0" curb cut with 1' splay on 135 AVENUE 208.74' From 219 STREET.
Q00945648-S3
06/18/2024
Permit issued — Mechanical Systems
Q00945648-I1-GC-CX
06/18/2024
Permit issued — Foundation
Q00945648-I1-FO-EA
05/24/2024
Objection resolved — Addressed
05/17/2024
Objection raised — Energy
05/07/2024
Filed — New Building
Curb cut application filed in conjunction with NB applications #Q00945648-I1 & #Q00945653-I1. Propose 10'-0" curb cut with 1' splay on 135 AVENUE 208.74' From 219 STREET.
Q00945648-S1
04/30/2024
Filed — New Building
Curb cut application filed in conjunction with NB applications #Q00945648-I1 & #Q00945653-I1. Propose 10'-0" curb cut with 1' splay on 135 AVENUE 208.74' From 219 STREET.
Q00945648-S2
03/01/2024
Filed — New Building
Curb cut application filed in conjunction with NB applications #Q00945648-I1 & #Q00945653-I1. Propose 10'-0" curb cut with 1' splay on 135 AVENUE 208.74' From 219 STREET.
Q00945648-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJ&J DESIGNS INC06/25/2025
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC09/10/2024
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC06/26/2024
DOB NOWMechanical SystemsPermit IssuedJ&J DESIGNS INC06/18/2024
DOB NOWFoundationSigned-offJ&J DESIGNS INC06/18/2024
1 project · most recent 02/23/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/23/2026Signed-offJ&J DESIGNS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Fujitsu AOU36RLXFZ1 36,400 BTU · Condensing Unit ×6
AOU24RLXFZ 24,000 BTU · Condensing Unit ×3
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×15
Samsung ME16A4021AS 900 CFM · Kitchen Exhaust ×6
1 project · most recent 02/23/2026
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
02/23/2026Signed-offVMC PLUMBING & HEATING INPlumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 06/13/2025
General Wiring
FiledStatusContractorScope
06/13/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 02/23/2026
Steel Wood
FiledStatusContractorScope
02/23/2026Signed-offJ&J DESIGNS INCSteel, Wood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/07/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
11/12/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
11/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/02/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/27/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
10/11/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/11/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/04/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 102
DateRequirementInspectorRole
03/12/2026HVAC-R and service water piping design and insulationDanny Chenenergy_progress
03/12/2026Ventilation and air distribution systemDanny Chenenergy_progress
03/12/2026Insulation placement and R valuesDanny Chenenergy_progress
03/12/2026Air barrier — testing Danny Chenenergy_progress
03/12/2026Fenestration air leakageDanny Chenenergy_progress
03/12/2026HVAC-R and service water heating equipmentDanny Chenenergy_progress
03/12/2026Interior lighting powerDanny Chenenergy_progress
03/12/2026MeteringDanny Chenenergy_progress
03/12/2026Fenestration and door U-factor and product ratingsDanny Chenenergy_progress
03/12/2026Mechanical SystemsDanny Chenspecial
03/12/2026MasonryDanny Chenspecial
03/12/2026Heating SystemsDanny Chenspecial
03/12/2026Structural Steel - High Strength BoltingDanny Chenspecial
03/12/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/12/2026Concrete - Cast-In-PlaceDanny Chenspecial
03/12/2026Subgrade InspectionsDanny Chenspecial
03/12/2026Structural Steel - DetailsDanny Chenspecial
03/12/2026Excavations - Sheeting, Shoring, and BracingDanny Chenspecial
03/12/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDanny Chenspecial
03/12/2026Fire-Resistant Penetrations and JointsDanny Chenspecial
03/12/2026Footing and FoundationDanny Chenprogress
03/12/2026Fire-Resistance Rated ConstructionDanny Chenprogress
03/12/2026Structural Wood FrameDanny Chenprogress
03/12/2026Energy Code Compliance InspectionsDanny Chenprogress
03/12/2026FinalPETER CHOprogress
Latest 25 of 102.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/19/2026Q00945648-S3Request digital key ↗
08/19/2026Q00945648-S2Request digital key ↗
08/19/2026Q00945648-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records16
▸DOB NOWRestrictive Declaration/Easement 16
08/13/2026Q00945648-P1Open ↗
08/13/2026Q00945648-S3Open ↗
08/13/2026Q00945648-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00945648-P1Open ↗
08/13/2026Q00945648-P2Open ↗
08/13/2026Q00945648-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 23
08/13/2026Q00945648-I1Open ↗
08/13/2026Q00945648-P1Open ↗
08/13/2026Q00945648-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00945648-P2Open ↗
08/13/2026Q00945648-P1Open ↗
08/13/2026Q00945648-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00945648-I1Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026Q00945648-P2Open ↗
09/01/2026Q00945648-P2Open ↗
09/01/2026Q00945648-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026Q00945648-P2Open ↗
09/01/2026Q00945648-P2Open ↗
09/01/2026Q00945648-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/19/2026Q00945648-S2Open ↗
08/19/2026Q00945648-S1Open ↗
08/19/2026Q00945648-I1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00945648-P2Open ↗
08/13/2026Q00945648-I1Open ↗
08/13/2026Q00945648-P1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00945648-I1Open ↗
08/13/2026Q00945648-P1Open ↗
08/13/2026Q00945648-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00945648-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00945648-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00945648-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026Q00945648-P1Open ↗
08/13/2026Q00945648-P2Open ↗
08/13/2026Q00945648-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00945648-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/13/2026Q00945648-P2Open ↗
08/13/2026Q00945648-P1Open ↗
08/13/2026Q00945648-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00945648-P1Open ↗
08/13/2026Q00945648-P2Open ↗
08/13/2026Q00945648-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/19/2026Q00945648-P1Open ↗
08/19/2026Q00945648-I1Open ↗
08/19/2026Q00945648-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00945648-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00945648-I1Open ↗