← Back
BuildNYC
Public elementary, junior or senior high
P.S. 188 Kingsbury
218-12 HARTLAND AVENUE · BIN 4164350
💬 Discuss this project
1957Year Built
3Stories
W1Building Class
R2AZoning
123,648 sfGross Floor Area
0Units
LL97 Covered14 Active Violations 0 unresolved · 14 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 120,000 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 32 filings
Floor 22 filings
Floor 16 filings
Cellar3 filings
Sub-Basement1 filing
Filed — no permit issued1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority5710/13/2026
NYC Department of Education103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AK Consulting Services109/24/2026
Rawlings Architects509/17/2026
Associates407/15/2026
Maitra Associates302/09/2026
Eme Group/Salas O'Brien208/12/2024
Eme Consulting Engineering Group110/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV Associates1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RNH Electric CompanyElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Universal Testing and Ins400202/08/2026
JPC Logistics Dba JPCL EN351308/12/2024
Building Lifecycle
All (153)Filed (16)Violation (91)Objection (6)Special Inspection (27)
10/02/2026
Objection raised — Other
09/24/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 188Q AT 218-12 HARTLAND AVENUE, QUEENS IN CONJUNCTION WITH JOB # Q01321170 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01449807-I1
09/17/2026
Filed — Alteration
P.S. 188-Q: Installation of new partitions in existing school building.
Q01321170-P1
09/17/2026
Filed — Alteration
P.S. 188-Q: Installation of new partitions in existing school building.
Q01321170-P2
09/15/2026
Special inspection requirement — Masonry
09/15/2026
Special inspection requirement — Post-installed Anchors
09/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/15/2026
Special inspection requirement — Footing and Foundation
09/15/2026
Special inspection requirement — Final
09/15/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
09/15/2026
Special inspection requirement — Subgrade Inspections
09/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/15/2026
Special inspection requirement — Concrete - Cast-In-Place
09/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
09/15/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
09/10/2026
Objection resolved — Resolved
07/28/2026
Objection raised — Other
07/15/2026
Filed — Alteration
Q01427709-I1
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/08/2026
Special inspection requirement — Sprinkler Systems
06/26/2026
Objection raised — Other
06/15/2026
Elevator Category 1 inspection report filed
06/09/2026
Filed — Alteration
P.S. 188-Q: Existing Building Alteration including new doors and window removal.
Q01401577-S1
05/19/2026
Filed — Alteration
P.S. 188-Q: Existing Building Alteration including new doors and window removal.
Q01401577-I1
05/19/2026
Special inspection requirement — Masonry
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/19/2026
Special inspection requirement — Post-installed Anchors
05/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/14/2026
Reissue: 35720071K date of issue: 06/13/2025. Failure to maintain building in code-compliant manner. At the time of inspection observed and noted…
ECB violation · open
05/14/2026
Reissue #35720072M date of issue: 06/13/2025. Failure to maintain building in code-compliant manner. At the time of inspection observed and noted…
ECB violation · open
05/13/2026
Special inspection requirement — Mechanical Systems
05/13/2026
Special inspection requirement — Final
02/09/2026
Filed — Alteration
P.S. 188-Q: Installation of new partitions in existing school building.
Q01321170-S7
02/08/2026
Filed — Alteration
P.S. 188-Q: Installation of new partitions in existing school building.
Q01321170-S6
02/07/2026
Special inspection requirement — Post-installed Anchors
02/05/2026
Special inspection requirement — Post-installed Anchors
02/05/2026
Special inspection requirement — Concrete - Cast-In-Place
02/05/2026
Special inspection requirement — Subgrade Inspections
02/05/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
02/05/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
02/05/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
01/29/2026
Special inspection requirement — Final
12/23/2025
Filed — Alteration
P.S. 188-Q: Installation of new partitions in existing school building.
Q01321170-S4
12/23/2025
Filed — Alteration
P.S. 188-Q: Installation of new partitions in existing school building.
Q01321170-S3
12/18/2025
Filed — Alteration
P.S. 188-Q: Installation of new partitions in existing school building.
Q01321170-I1
12/18/2025
Filed — Alteration
P.S. 188-Q: Installation of new partitions in existing school building.
Q01321170-S2
12/18/2025
Filed — Alteration
P.S. 188-Q: Installation of new partitions in existing school building.
Q01321170-S1
12/17/2025
Boiler inspection report filed
Initial · no defects · Accepted
07/24/2025
PA-21-01b: Failed to comply with the provisions of the construction codes, Fire Code, Fire Department rules, and applicable standards associated…
FDNY_ORDER violation · closed
06/13/2025
Failure to maintain building in code-compliant manner.noted at bulkhead & between stairwell 2ND & 3RD floors running cracks on walls.rem:repair…
ECB violation · open
06/13/2025
Reissue#35677575N failure to maintain building in code-compliant manner.noted at exit 10 exterior steps large openings between outer wall & stet…
ECB violation · open
06/13/2025
Reissue#35677499K failure to maintain building in cdoe-compliant manner.noted at roof top parapet missing guardrails.rem:repair and/or replace.
ECB violation · open
11/15/2024
Objection resolved — Addressed
08/12/2024
Filed — Alteration
Q01092651-I1
08/12/2024
Objection raised — Other
08/08/2024
Filed — Alteration
Q01092752-I1
07/18/2024
Failure to maintain building wall(s)or appurtenances.noted:at back of the building in front of exit#10,retaining wall with railing pulling away…
ECB violation · open
07/18/2024
Reissue#35676256L failure to maintain building wall(s)or appurtenancesnoted at roof top parapet is below the required height of 42"building with…
ECB violation · open
03/13/2024
Boiler inspection report filed
Initial · defects found · Accepted
03/13/2024
Boiler inspection report filed
Initial · no defects · Accepted
Latest 60 of 153 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—Sun General Construction—
BIS—Sun General Construction—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—S & L Plumbing & Heating—
BIS—S & L Plumbing & Heating—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—S & L Plumbing & Heating—
BIS—S & L Plumbing & Heating—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—WDF—
BIS—Ark Systems Electric—
BIS—WDF—
BIS—WDF—
+ 10 more permits on file
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
10/04/2026Q01449807-I1Request the plans ↗
08/24/2026Q00928009-I1Request the plans ↗
08/21/2026Q01092752-I1Request the plans ↗
Showing 3 of 14 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION5
06/09/2017402332711Open ↗
06/09/2017402332711Open ↗
06/09/2017402878267Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature16
10/04/2026Q01449807-I1Open ↗
09/22/2026Q01321170-P1Open ↗
09/22/2026Q01321170-P2Open ↗
Showing 3 of 16 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
10/04/2026Q01449807-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT2
09/22/2026Q01321170-P1Open ↗
08/13/2026Q01321170-I1Open ↗
▸Approvals, Objections & Sign-offs32
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
10/04/2026Q01449807-I1Open ↗
09/22/2026Q01321170-P1Open ↗
09/22/2026Q01321170-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)16
10/04/2026Q01449807-I1Open ↗
09/22/2026Q01321170-P1Open ↗
09/22/2026Q01321170-P2Open ↗
Showing 3 of 16 on file for this type
▸Other Documents15
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal15
10/04/2026Q01449807-I1Open ↗
09/22/2026Q01321170-P1Open ↗
09/22/2026Q01321170-P2Open ↗
Showing 3 of 15 on file for this type