← Back
Two stories - detached, small or mid-size
218-19 141 AVENUE
QUEENS · Laurelton · BIN 4280613
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R3XZoning
1,606 sfGross Floor Area
1Units
3 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: R&J 218-19 141 AVE LLC · 6,236 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 9 docs
Cellar1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
308 CHAUNCET203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/22/2022$520K—Private party → R&J 218-19 141 AVE LLC$324/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BARRY J. BANK, P.E., CONSULTING ENG103/25/2024
Building Lifecycle
All (27)Filed (1)Violation (4)Special Inspection (22)
06/15/2026
Violation issued (ECB, open)
Construction
06/15/2026
Violation issued (ECB, open)
Construction
06/15/2026
Violation issued (ECB, open)
Unknown
04/07/2025
Violation issued (DOB, closed)
V%-DOB VIOLATION
03/25/2024
Filed — Alteration CO
Q01021120-I1
03/16/2024
Special inspection requirement — Concrete - Cast-In-Place
03/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/16/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
03/16/2024
Special inspection requirement — Subgrade Inspections
03/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/16/2024
Special inspection requirement — Final
03/16/2024
Special inspection requirement — Footing and Foundation
03/16/2024
Special inspection requirement — Energy Code Compliance Inspections
03/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
03/16/2024
Special inspection requirement — Structural Wood Frame
03/16/2024
Special inspection requirement — Air barrier - visual inspection
03/16/2024
Special inspection requirement — Maintenance information
03/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
03/16/2024
Special inspection requirement — Fenestration areas
03/16/2024
Special inspection requirement — Fenestration air leakage
03/16/2024
Special inspection requirement — Metering
03/16/2024
Special inspection requirement — Insulation placement and R values
03/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
03/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
03/16/2024
Special inspection requirement — Permanent certificate
03/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
03/16/2024
Special inspection requirement — Interior lighting power
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
03/16/2024Concrete - Cast-In-Place—special
03/16/2024Fire-Resistant Penetrations and Joints—special
03/16/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
03/16/2024Subgrade Inspections—special
03/16/2024Structural Stability – Alterations of existing buildings—special
03/16/2024Final—progress
03/16/2024Footing and Foundation—progress
03/16/2024Energy Code Compliance Inspections—progress
03/16/2024Fire-Resistance Rated Construction—progress
03/16/2024Structural Wood Frame—progress
03/16/2024Air barrier - visual inspection—energy_progress
03/16/2024Maintenance information—energy_progress
03/16/2024HVAC-R and service water piping design and insulation—energy_progress
03/16/2024Fenestration areas—energy_progress
03/16/2024Fenestration air leakage—energy_progress
03/16/2024Metering—energy_progress
03/16/2024Insulation placement and R values—energy_progress
03/16/2024HVAC-R and service water heating equipment—energy_progress
03/16/2024Fenestration and door U-factor and product ratings—energy_progress
03/16/2024Permanent certificate—energy_progress
03/16/2024HVAC-R and service water heating system controls—energy_progress
03/16/2024Interior lighting power—energy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026Q01021120-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01021120-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01021120-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01021120-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01021120-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01021120-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01021120-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q01021120-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01021120-I1Open ↗