← Back
Two stories - detached, small or mid-size
218-23 82 AVENUE
QUEENS · Oakland Gardens-Hollis Hills · BIN 4165254
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
2,496 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 20 docs
Floor 25p · 1 filing · 20 docs
Floor 1
Cellar1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MLS COMPLETE ENGINEERING405/29/2025
EDWARD C. HICKS RA312/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABRIS DESIGN STUDIO703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROBKE PLUS INCGeneral Contractor607/08/2026
FOUR POINTS P & H CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616605/29/2025
Building Lifecycle
All (74)Filed (7)Permit Issued (6)Violation (2)Inspection (9)Objection (20)Special Inspection (30)
07/15/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/08/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
07/08/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/08/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FAHAD FATEH
07/08/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
FAHAD FATEH
07/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
07/08/2025
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
07/08/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
07/08/2025
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
FAHAD FATEH
07/08/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
07/08/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
07/08/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
07/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
06/13/2025
Objection resolved — Addressed
06/11/2025
Objection raised — Scope
05/29/2025
Filed — Alteration
PROPOSING 2 STORY HORIZONTAL ENLARGEMENT TO EXISTING ONE FAMILY DWELLING .
Q08045184-P3
05/27/2025
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
05/27/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
FAHAD FATEH
05/27/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FAHAD FATEH
05/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/27/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
05/27/2025
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
FAHAD FATEH
05/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
05/27/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/27/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/27/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/27/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/27/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
05/27/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/23/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/02/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/21/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/18/2025
Objection resolved — Addressed
02/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/20/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/27/2025
Permit issued — Plumbing
Q00813525-I1-PL
01/24/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/09/2025
Objection raised — Other
12/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/12/2024
Filed — Alteration
PROPOSING 2 STORY HORIZONTAL ENLARGEMENT TO EXISTING ONE FAMILY DWELLING .
Q08045184-P2
12/12/2024
Filed — Alteration
Replacing existing plumbing fixtures. New bathrooms and kitchen fixtures
Q00813525-P1
11/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/15/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
10/15/2024
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
05/29/2024
Permit issued — General Construction
Q08045184-I1-GC
05/29/2024
Permit issued — Construction Fence
Q00881824-I1-FN
02/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/19/2023
Objection resolved — Addressed
12/18/2023
Objection resolved — Addressed
12/18/2023
Objection resolved — Addressed
12/12/2023
Objection raised — Structural
12/07/2023
Objection raised — Scope
12/07/2023
Objection raised — Admin
11/28/2023
Filed — Alteration
PROPOSING 2 STORY HORIZONTAL ENLARGEMENT TO EXISTING ONE FAMILY DWELLING .
Q08045184-P1
11/28/2023
Violation issued (ECB, open)
Construction
10/18/2023
Permit issued — Plumbing
Q00813525-I1-PL
10/02/2023
Filed — Alteration
Replacing existing plumbing fixtures. New bathrooms and kitchen fixtures
Q00813525-I1
07/11/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP01/27/2025
DOB NOWGeneral ConstructionSigned-offROBKE PLUS INC05/29/2024
DOB NOWConstruction FencePermit IssuedROBKE PLUS INC05/29/2024
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP10/18/2023
DOB NOWConstruction FencePermit IssuedROBKE PLUS INC06/12/2023
DOB NOWGeneral ConstructionSigned-offROBKE PLUS INC06/05/2023
BISPLISSUEDISIS PLUMBING INC01/05/2004
1 project · most recent 12/12/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/12/2024Signed-offFOUR POINTS P & H CORPGas, Storm, Water/Sanitary
1 project · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025CompleteNAS ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/15/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/23/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/02/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/21/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/20/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
07/08/2025Fenestration air leakageFAHAD FATEHenergy_progress
07/08/2025Fenestration areasFAHAD FATEHenergy_progress
07/08/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/08/2025Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
07/08/2025Construction Operations Influencing Adjacent StructuresFAHAD FATEHspecial
07/08/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
07/08/2025Concrete - Cast-In-PlaceFAHAD FATEHspecial
07/08/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
07/08/2025Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical ComponentsFAHAD FATEHspecial
07/08/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
07/08/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
07/08/2025Interior lighting powerFAHAD FATEHenergy_progress
07/08/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/27/2025Concrete - Cast-In-PlaceFAHAD FATEHspecial
05/27/2025Construction Operations Influencing Adjacent StructuresFAHAD FATEHspecial
05/27/2025Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
05/27/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/27/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
05/27/2025Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical ComponentsFAHAD FATEHspecial
05/27/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
05/27/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
05/27/2025Fenestration areasFAHAD FATEHenergy_progress
05/27/2025Interior lighting powerFAHAD FATEHenergy_progress
05/27/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/27/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
Latest 25 of 54.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026Q00881824-I1Request digital key ↗
08/21/2026Q00813525-P1Request digital key ↗
08/21/2026Q00813525-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q08045184-P3Open ↗
08/13/2026Q08045184-I1Open ↗
08/13/2026Q08045184-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026Q00881824-I1Open ↗
08/21/2026Q00813525-I1Open ↗
08/21/2026Q00813525-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026Q08045184-P1Open ↗
09/01/2026Q00813525-P1Open ↗
08/28/2026Q08045184-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026Q08045184-P1Open ↗
08/28/2026Q08045184-I1Open ↗
08/27/2026Q08045184-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026Q08045184-P2Open ↗
08/15/2026Q08045184-P1Open ↗
08/15/2026Q08045184-I1Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms1
▸DOB NOWAI1 Form1
08/13/2026Q00813525-I1Open ↗
▸Other Documents12
▸DOB NOWPlot Diagram4
08/13/2026Q08045184-P3Open ↗
08/13/2026Q08045184-I1Open ↗
08/13/2026Q08045184-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026Q08045184-P2Open ↗
08/13/2026Q08045184-I1Open ↗
08/13/2026Q08045184-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q08045184-P1Open ↗
08/13/2026Q08045184-I1Open ↗
08/13/2026Q08045184-P3Open ↗
Showing 3 of 4 on file for this type