| Owner | Filings | Most Recent |
|---|---|---|
| NYC School Construction | 12 | 10/13/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Langan Engineering | 2 | 09/24/2026 |
| Gregory Cellamare | 1 | 08/31/2026 |
| Associates | 4 | 05/07/2026 |
| Rawlings Architects | 2 | 04/29/2026 |
| Maitra Associates | 2 | 03/17/2026 |
| Silman | 2 | 03/12/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| JMV Associates | 8 | 03/21/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/31/2026 | — | — | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Mitsubishi Electric TRUYA0121KA70NA 12,000 BTU · Heat Pump Outdoor ×6 TRUYA0241HA70NA 24,000 BTU · Split System ×2 Heating Jetson ACCM-030-A-F-D-2-1 111 tons · Heat Pump Outdoor ×1 Ventilation Loren Cook SQN-D VF 400 CFM · Exhaust Fan ×3 ACE-B 1,600 CFM · Exhaust Fan ×2 ACRUB-B 650 CFM · Kitchen Exhaust ×1 ACSC-HP 9,000 CFM · Makeup Air ×1 VCR 3,600 CFM · Kitchen Exhaust ×1 Scott Springfield CUSTOM 7,500 CFM ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/31/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/24/2026 | — | — | 2 scope_items |
| 08/31/2026 | — | — | Steel, Concrete |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/21/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 09/21/2026 | Concrete - Cast-In-Place | — | special |
| 09/21/2026 | Structural Steel - Welding | — | special |
| 09/21/2026 | Structural Steel - Details | — | special |
| 09/21/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 09/21/2026 | Subgrade Inspections | — | special |
| 09/21/2026 | Post-installed Anchors | — | special |
| 08/18/2026 | Air barrier — testing | — | energy_progress |
| 08/18/2026 | Protection of exposed foundation insulation | — | energy_progress |
| 08/18/2026 | Vestibules | — | energy_progress |
| 05/29/2026 | Post-installed Anchors | — | special |
| 05/29/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 05/29/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 05/29/2026 | Fire-Resistance Rated Construction | — | progress |
| 05/29/2026 | Energy Code Compliance Inspections | — | progress |
| 05/29/2026 | Wall Panels, Curtain Walls, and Veneers | — | special |
| 04/09/2026 | Concrete - Cast-In-Place | — | special |
| 04/08/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 04/08/2026 | Post-installed Anchors | — | special |
| 03/30/2026 | Post-installed Anchors | — | special |
| 03/27/2026 | Preliminary | — | progress |
| 03/27/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 03/27/2026 | Heating Systems | — | special |
| 03/27/2026 | Post-installed Anchors | — | special |
| 03/27/2026 | Energy Code Compliance Inspections | — | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| P.S. 188Q | Education | — | Project Q01338002 |