P.S. 188Q
218-24 HARTLAND AVENUE · BIN 4625786
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
Structural
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 31 filing · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar2 filings · 20 docs
Filed — no permit issuedP.S. 188Q7p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction1210/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Langan Engineering209/24/2026
Gregory Cellamare108/31/2026
Associates405/07/2026
Rawlings Architects204/29/2026
Maitra Associates203/17/2026
Silman203/12/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV Associates803/21/2026
Building Lifecycle
All (59)Filed (13)Objection (16)Special Inspection (30)
09/30/2026
Objection raised — Other
09/24/2026
Filed — Alteration
P.S. 188-Q: SUPPORT OF EXCAVATION FOR A NEW 3-STORY SCHOOL BUILDING.
Q01338002-P1
09/21/2026
Special inspection requirement — Structural Steel - Welding
09/21/2026
Special inspection requirement — Subgrade Inspections
09/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/21/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
09/21/2026
Special inspection requirement — Structural Steel - Details
09/21/2026
Special inspection requirement — Post-installed Anchors
09/21/2026
Special inspection requirement — Concrete - Cast-In-Place
09/11/2026
Objection resolved — Resolved
09/11/2026
Objection resolved — Resolved
08/31/2026
Filed — New Building
PA 188-Q: Subsequent filing of General Plumbing work type.
Q01332952-S9
08/18/2026
Special inspection requirement — Protection of exposed foundation insulation
08/18/2026
Special inspection requirement — Air barrier — testing
08/18/2026
Special inspection requirement — Vestibules
07/17/2026
Objection resolved — Resolved
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/29/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/29/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
05/29/2026
Special inspection requirement — Post-installed Anchors
05/29/2026
Special inspection requirement — Energy Code Compliance Inspections
05/26/2026
Objection raised — Other
05/07/2026
Filed — New Building
PA 188-Q: Subsequent filing of General Plumbing work type.
Q01332952-S8
05/06/2026
Objection raised — Other
05/04/2026
Objection raised — Other
04/29/2026
Filed — No Work
Q01387933-I1
04/14/2026
Filed — New Building
PA 188-Q: Subsequent filing of General Plumbing work type.
Q01332952-S7
04/13/2026
Objection resolved — Addressed
04/09/2026
Special inspection requirement — Concrete - Cast-In-Place
04/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/08/2026
Special inspection requirement — Post-installed Anchors
04/05/2026
Objection raised — Other
04/05/2026
Objection raised — Other
04/01/2026
Filed — New Building
PA 188-Q: Subsequent filing of General Plumbing work type.
Q01332952-S5
04/01/2026
Filed — New Building
PA 188-Q: Subsequent filing of General Plumbing work type.
Q01332952-S6
04/01/2026
Objection raised — Other
03/30/2026
Objection raised — Other
03/30/2026
Objection raised — Other
03/30/2026
Special inspection requirement — Post-installed Anchors
03/27/2026
Objection raised — Other
03/27/2026
Special inspection requirement — Heating Systems
03/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/27/2026
Special inspection requirement — Interior lighting power
03/27/2026
Special inspection requirement — Energy Code Compliance Inspections
03/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/27/2026
Special inspection requirement — Maintenance information
03/27/2026
Special inspection requirement — Preliminary
03/27/2026
Special inspection requirement — Lighting controls
03/27/2026
Special inspection requirement — Electrical motors and elevators
03/27/2026
Special inspection requirement — Post-installed Anchors
03/17/2026
Filed — New Building
PA 188-Q: Subsequent filing of General Plumbing work type.
Q01332952-S3
03/17/2026
Filed — New Building
PA 188-Q: Subsequent filing of General Plumbing work type.
Q01332952-S4
03/12/2026
Filed — New Building
PA 188-Q: Subsequent filing of General Plumbing work type.
Q01332952-S2
03/12/2026
Filed — New Building
PA 188-Q: Subsequent filing of General Plumbing work type.
Q01332952-S1
01/12/2026
Objection raised — Other
12/29/2025
Filed — Alteration
P.S. 188-Q: SUPPORT OF EXCAVATION FOR A NEW 3-STORY SCHOOL BUILDING.
Q01338002-I1
12/16/2025
Objection raised — Other
12/15/2025
Filed — New Building
PA 188-Q: Subsequent filing of General Plumbing work type.
Q01332952-I1
Nothing on file for this building.
1 project · most recent 08/31/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/31/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric TRUYA0121KA70NA 12,000 BTU · Heat Pump Outdoor ×6
TRUYA0241HA70NA 24,000 BTU · Split System ×2
Heating
Berner ARE12-1042E 8 kW · Air Curtain ×1
ARE12-2072E 12 kW · Air Curtain ×1
Jetson ACCM-030-A-F-D-2-1 111 tons · Heat Pump Outdoor ×1
Ventilation
Loren Cook SQN-D VF 400 CFM · Exhaust Fan ×3
ACE-B 1,600 CFM · Exhaust Fan ×2
ACRUB-B 650 CFM · Kitchen Exhaust ×1
ACSC-HP 9,000 CFM · Makeup Air ×1
VCR 3,600 CFM · Kitchen Exhaust ×1
Scott Springfield CUSTOM 7,500 CFM ×2
1 project · most recent 08/31/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/31/2026——Storm, Water/Sanitary
2 projects · most recent 09/24/2026
Steel Concrete
FiledStatusContractorScope
09/24/2026——2 scope_items
08/31/2026——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
09/21/2026Excavations - Sheeting, Shoring, and Bracing—special
09/21/2026Concrete - Cast-In-Place—special
09/21/2026Structural Steel - Welding—special
09/21/2026Structural Steel - Details—special
09/21/2026Structural Stability – Alterations of existing buildings—special
09/21/2026Subgrade Inspections—special
09/21/2026Post-installed Anchors—special
08/18/2026Air barrier — testing —energy_progress
08/18/2026Protection of exposed foundation insulation—energy_progress
08/18/2026Vestibules—energy_progress
05/29/2026Post-installed Anchors—special
05/29/2026Fire-Resistant Penetrations and Joints—special
05/29/2026Subsurface Investigations (Borings/Test Pits)—special
05/29/2026Fire-Resistance Rated Construction—progress
05/29/2026Energy Code Compliance Inspections—progress
05/29/2026Wall Panels, Curtain Walls, and Veneers—special
04/09/2026Concrete - Cast-In-Place—special
04/08/2026Fire-Resistant Penetrations and Joints—special
04/08/2026Post-installed Anchors—special
03/30/2026Post-installed Anchors—special
03/27/2026Preliminary—progress
03/27/2026Fire-Resistant Penetrations and Joints—special
03/27/2026Heating Systems—special
03/27/2026Post-installed Anchors—special
03/27/2026Energy Code Compliance Inspections—progress
Latest 25 of 68.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 188QEducation—
Project Q01338002 Alteration · Plan Examiner Review · 12/29/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch10
08/17/2026Q01338002-I1Request digital key ↗
08/16/2026Q01332952-S1Request digital key ↗
08/16/2026Q01332952-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/14/2026Q01387933-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026Q01332952-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01332952-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature12
10/04/2026Q01338002-P1Open ↗
08/17/2026Q01338002-I1Open ↗
08/17/2026Q01387933-I1Open ↗
Showing 3 of 12 on file for this type
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/16/2026Q01332952-S1Open ↗
▸Approvals, Objections & Sign-offs23
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
10/04/2026Q01338002-P1Open ↗
08/17/2026Q01338002-I1Open ↗
08/16/2026Q01332952-S6Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)11
10/04/2026Q01338002-P1Open ↗
08/16/2026Q01332952-S6Open ↗
08/16/2026Q01332952-S5Open ↗
Showing 3 of 11 on file for this type
▸Other Documents16
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal13
10/04/2026Q01338002-P1Open ↗
08/17/2026Q01338002-I1Open ↗
08/16/2026Q01332952-S6Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSite Survey: Initial2
08/16/2026Q01332952-I1Open ↗
08/16/2026Q01332952-S3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026Q01332952-I1Open ↗