← Back
BuildNYC
Over six families without stores
218 CUMBERLAND STREET
BROOKLYN · Fort Greene · BIN 3058964
💬 Discuss this project
1895Year Built
5Stories
C1Building Class
R6BZoning
8,800 sfGross Floor Area
10Units
Rent Stabilized0 Active Violations 3 likely answered ▸FDNY Report ↗
Over six families without stores · Owner of record: 218 Cumberland · 2,200 sf lot · 4 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFourth floor renovation with new partitions1p · 1 filing · 10 docs
Floor 4Fourth floor renovation with new partitions6p · 2 filings · 16 docs
Floor 3
Floor 2Unit 2A, Unit 2R2p · 2 filings · 12 docs
Floor 12p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
218 Cumberland703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/14/2020$2.3M—SEMEIA-COLOMBO REALTY MANAGEMENT, LLC → 218 CUMBERLAND LLC$261/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Just Consulting Engineering402/22/2023
Billah Engineering201/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ecdesign Studio1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yilin ConstructionGeneral Contractor303/21/2026
Catman PlumbingPlumbing207/08/2026
KJK ElectricElectrical103/22/2026
Splen ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G Engineering7778202/22/2023
Billah Engineering5838101/29/2021
Building Lifecycle
04/27/2026
Boiler inspection report filed
Initial · no defects · Accepted
09/11/2025
Boiler inspection report filed
Initial · no defects · Accepted
03/06/2025
Boiler inspection report filed
Subsequent · no defects · Accepted
12/18/2024
Boiler inspection report filed
Initial · defects found · Accepted
09/23/2024
Failure to file 2023 external low pressure inspection
DOB violation · open
118 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSplen Construction09/06/2022
DOB NOWPlumbingSigned-offCatman Plumbing09/03/2022
DOB NOWMechanical SystemsSigned-offYilin Construction02/05/2021
DOB NOWPlumbingSigned-offCatman Plumbing10/06/2020
BISOTISSUEDYilin Construction10/19/2020
3 projects · most recent 03/31/2023
General Wiring
FiledStatusContractorScope
03/31/2023CompleteJ Y ElectricGeneral Wiring
07/27/2021CompleteKJK Electric—
01/13/2021CompleteKJK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/14/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
02/24/2023Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
02/24/2023Fire-Resistance Rated ConstructionXIONGCAI GUprogress
02/24/2023Energy Code Compliance InspectionsXIONGCAI GUprogress
02/22/2023Fire-Resistance Rated ConstructionXIONGCAI GUprogress
02/22/2023Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
02/22/2023Energy Code Compliance InspectionsXIONGCAI GUprogress
01/29/2021Energy Code Compliance InspectionsMOHAMMAD BILLAHprogress
01/22/2021Mechanical SystemsMOHAMMAD BILLAHspecial
01/22/2021FinalMOHAMMAD BILLAHprogress
57 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account