← Back
Over six families without stores
218 SOUTH 3 STREET
BROOKLYN · Williamsburg · BIN 3063298
💬 Discuss this project
1918Year Built
6Stories
C1Building Class
R6Zoning
38,700 sfGross Floor Area
41Units
LL97 CoveredRent Stabilized45 Open Violations 44 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: 218 S 3RD STREET HOLDING, LLC · 7,125 sf lot · 5.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 19p · 2 filings · 20 docs
Cellar15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
202 SOUTH 2ND STREET2903/21/2026
218 SOUTH THIRD MANAGEMENT1803/21/2026
218 SOUTH THIRD MANAGEMENLLC303/21/2026
218 S 3RD MANAGEMENT LLC203/21/2026
218 SOUTH 3RD STREET LLC C/O WAY203/21/2026
218 SOUTH 3RD STREET LLC C O WAY203/21/2026
218 S 3RD STREET HOLDING, LLC103/22/2026
NOVEL PROPERTY VENTURES103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/16/2017$23.0M—218 SOUTH THIRD OWNER LLC → 218 S 3RD STREET HOLDING, LLC$594/sf building
11/25/2014$12.8M—— → —$329/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.506/02/2026
ARCHITECTURE WORK PC403/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M SQUARED CONTRACTORS LLCGeneral Contractor603/21/2026
ERIC FRANCHINOElectrical103/21/2026
LINDON WEBSTERElectrical103/21/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
NEW YORK HEATING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808209/04/2024
ARCHITECTURE WORK PC2410603/24/2022
Building Lifecycle
All (148)Filed (9)Permit Issued (5)Signed Off (4)Violation (60)Inspection (4)Objection (40)Special Inspection (26)
08/19/2026
Violation issued (HPD, open)
B
08/11/2026
Violation issued (HPD, open)
A
08/06/2026
Signed off — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT BOILER AND GAS/OIL BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01105853-I1
07/09/2026
Signed off — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT BOILER AND GAS/OIL BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01105853-S1
06/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
06/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Bazini
06/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Bazini
06/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
06/18/2026
Objection resolved — Addressed
06/18/2026
Objection resolved — Addressed
06/15/2026
Objection raised — Scope
06/15/2026
Objection raised — Scope
06/02/2026
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT BOILER AND GAS/OIL BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01105853-P3
06/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Bazini
06/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
06/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Bazini
04/26/2026
Violation issued (HPD, open)
B
04/26/2026
Violation issued (HPD, open)
B
04/19/2026
Violation issued (HPD, open)
B
04/19/2026
Violation issued (HPD, open)
B
04/19/2026
Violation issued (HPD, closed)
A
04/19/2026
Violation issued (HPD, open)
B
04/19/2026
Violation issued (HPD, open)
B
04/16/2026
Violation issued (HPD, open)
B
04/16/2026
Violation issued (HPD, open)
B
04/16/2026
Violation issued (HPD, open)
B
04/16/2026
Violation issued (HPD, closed)
C
02/26/2026
Violation issued (HPD, closed)
A
02/19/2026
Violation issued (HPD, closed)
B
02/19/2026
Violation issued (HPD, open)
B
02/19/2026
Violation issued (HPD, closed)
B
02/19/2026
Violation issued (HPD, closed)
B
02/19/2026
Violation issued (HPD, closed)
B
02/01/2026
Violation issued (HPD, open)
B
02/01/2026
Violation issued (HPD, open)
C
02/01/2026
Violation issued (HPD, open)
C
01/29/2026
Violation issued (HPD, closed)
C
01/29/2026
Violation issued (HPD, open)
C
01/29/2026
Violation issued (HPD, open)
B
01/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
12/17/2025
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT BOILER AND GAS/OIL BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01105853-P1
12/17/2025
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT BOILER AND GAS/OIL BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01105853-P2
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Bazini
12/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Bazini
12/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/10/2025
Violation issued (HPD, closed)
A
12/04/2025
Violation issued (HPD, open)
B
12/01/2025
Violation issued (HPD, closed)
B
11/29/2025
Violation issued (HPD, closed)
A
11/29/2025
Violation issued (HPD, closed)
B
11/29/2025
Violation issued (HPD, closed)
C
11/05/2025
Violation issued (HPD, closed)
C
11/05/2025
Violation issued (HPD, closed)
C
11/05/2025
Violation issued (HPD, open)
C
09/26/2025
Violation issued (HPD, closed)
A
09/26/2025
Violation issued (HPD, closed)
A
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offNEW YORK HEATING CORP09/02/2025
DOB NOWPlumbingSigned-offHIGH RISE PLBG & HTG CORP02/05/2025
DOB NOWGeneral ConstructionSigned-offM SQUARED CONTRACTORS LLC08/18/2022
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC06/09/2022
DOB NOWStructuralSigned-offM SQUARED CONTRACTORS LLC06/07/2022
BISPLISSUEDA. M. PLUMBING COMPANY06/14/2019
BISOTISSUEDG.M. CONSTRUCTION & HOME05/16/2019
BISPLISSUEDPETER MICELI PLUMBING11/14/2017
BISMHISSUEDGOOD LIVING NY INC10/27/2017
BISPLISSUEDORBIT PLBG & HTG INC02/28/2017
BISMHISSUEDTRIDENT RESTORATION INC12/07/2016
BISPLISSUEDORBIT PLBG & HTG INC11/16/2016
BISOTISSUEDTRIDENT RESTORATION INC10/20/2016
BISPLISSUEDORBIT PLBG & HTG INC09/13/2016
BISOTISSUEDTRIDENT RESTORATION INC08/10/2016
BISPLISSUEDORBIT PLBG & HTG INC06/08/2016
BISOTISSUEDTRIDENT RESTORATION INC05/23/2016
BISPLISSUEDORBIT PLBG & HTG INC04/27/2016
BISPLISSUEDORBIT PLBG & HTG INC04/27/2016
BISOTISSUEDTRIDENT RESTORATION INC04/07/2016
BISOTISSUEDTRIDENT RESTORATION INC04/07/2016
BISPLISSUEDALL PRO PLBG & HTG INC02/01/2016
BISPLISSUEDALL PRO PLBG & HTG INC01/29/2016
BISOTISSUEDTRIDENT RESTORATION INC01/13/2016
BISOTISSUEDTRIDENT RESTORATION INC12/09/2015
BISOTISSUEDTRIDENT RESTORATION INC12/09/2015
BISOTISSUEDTRIDENT RESTORATION INC12/08/2015
BISPLISSUEDORBIT PLBG & HTG INC11/09/2015
BISPLISSUEDORBIT PLBG & HTG INC11/09/2015
BISPLISSUEDORBIT PLBG & HTG INC11/09/2015
BISOTISSUEDTRIDENT RESTORATION INC11/04/2015
BISOTISSUEDTRIDENT RESTORATION INC10/23/2015
BISOTISSUEDTRIDENT RESTORATION INC10/14/2015
BISPLISSUEDORBIT PLBG & HTG INC08/13/2015
BISPLISSUEDORBIT PLBG & HTG INC08/13/2015
BISPLISSUEDORBIT PLBG & HTG INC08/13/2015
BISOTISSUEDTRIDENT RESTORATION INC08/06/2015
BISMHISSUEDTRIDENT RESTORATION INC08/06/2015
BISOTISSUEDTRIDENT RESTORATION INC07/14/2015
BISPLISSUEDORBIT PLBG & HTG INC04/09/2015
+ 5 more permits on file
1 project · most recent 06/02/2026
Gas
FiledStatusContractorScope
06/02/2026Signed-offNEW YORK HEATING CORPGas
3 projects · most recent 10/21/2025
General Wiring
FiledStatusContractorScope
10/21/2025Permit IssuedL.J.F. & SONS ELECL CONTS—
08/18/2025Permit IssuedWEBSTAR ELECL CONTRS INCGeneral Wiring
05/15/2019Permit IssuedAMRA ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/31/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/08/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
06/30/2026Tenant Protection Plan ComplianceJoseph Bazinispecial
06/30/2026HVAC-R and service water piping design and insulationJoseph Bazinienergy_progress
06/30/2026HVAC-R and service water heating system controlsJoseph Bazinienergy_progress
06/30/2026HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
06/01/2026HVAC-R and service water piping design and insulationJoseph Bazinienergy_progress
06/01/2026Tenant Protection Plan Compliance—special
06/01/2026HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
06/01/2026HVAC-R and service water heating system controlsJoseph Bazinienergy_progress
01/08/2026Tenant Protection Plan ComplianceJoseph Bazinispecial
12/11/2025Tenant Protection Plan Compliance—special
12/11/2025HVAC-R and service water piping design and insulationJoseph Bazinienergy_progress
12/11/2025HVAC-R and service water heating system controlsJoseph Bazinienergy_progress
12/11/2025HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
12/11/2025Tenant Protection Plan Compliance—special
04/07/2022HVAC-R and service water heating system controlsWilliam Kingenergy_progress
04/07/2022Insulation placement and R valuesWilliam Kingenergy_progress
04/07/2022HVAC-R and service water heating equipmentWilliam Kingenergy_progress
04/07/2022HVAC-R and service water piping design and insulationWilliam Kingenergy_progress
04/07/2022Lighting in dwelling unitsWilliam Kingenergy_progress
04/07/2022Energy Code Compliance InspectionsWilliam Kingprogress
04/07/2022FinalWilliam Kingprogress
04/07/2022Fire-Resistant Penetrations and JointsWilliam Kingspecial
04/07/2022Mechanical SystemsWilliam Kingspecial
04/07/2022Post-installed AnchorsWilliam Kingspecial
03/25/2022Fire-Resistant Penetrations and JointsWilliam Kingspecial
Latest 25 of 26.
▾Documents — 354 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/31/2026B00621137-P1Request digital key ↗
08/24/2026B01105853-P1Request digital key ↗
08/24/2026B01105853-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits72
▸BISWORK PERMIT APPLICATION42
05/22/2019321955470Open ↗
11/15/2017321671437Open ↗
10/30/2017321671437Open ↗
Showing 3 of 42 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION22
04/16/2019321955470Open ↗
03/26/2018321671437Open ↗
10/25/2017321671437Open ↗
Showing 3 of 22 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION8
03/21/2018321671437Open ↗
02/23/2017321262842Open ↗
02/23/2017321306298Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications76
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION44
03/06/2020321955470Open ↗
03/06/2020321955470Open ↗
05/22/2019321955470Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026B01105853-I1Open ↗
09/01/2026B01105853-I1Open ↗
09/01/2026B01105853-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/31/2026B00621137-P1Open ↗
08/31/2026B00621137-I1Open ↗
08/31/2026B00621100-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B01105853-I1Open ↗
08/30/2026B01105853-S1Open ↗
08/26/2026B00621100-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/22/2016321302149Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/25/2017321671437Open ↗
01/22/2016321302149Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISProfessional and Owner Certification (POC3)1
10/25/2017321671437Open ↗
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE18
04/16/2019321955470Open ↗
03/26/2018321671437Open ↗
10/25/2017321671437Open ↗
Showing 3 of 18 on file for this type
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes8
04/16/2019321955470Open ↗
10/25/2017321671437Open ↗
09/27/2016321374614Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos29
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
04/16/2019321955470Open ↗
10/25/2017321671437Open ↗
09/27/2016321374614Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/31/2026B00621137-P1Open ↗
08/24/2026B01105853-S1Open ↗
08/24/2026B01105853-P1Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance50
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS34
03/06/2020321955470Open ↗
05/22/2019321955470Open ↗
07/19/2018321671437Open ↗
Showing 3 of 34 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
03/06/2020321955470Open ↗
07/19/2018321671437Open ↗
02/10/2017321374614Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00621100-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/24/2026B01105853-I1Open ↗
▸Inspections & Test Reports1
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
07/19/2018321671437Open ↗
▸Approvals, Objections & Sign-offs27
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
04/22/2020321955470Open ↗
07/19/2018321671437Open ↗
02/10/2017321374614Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
05/11/2016321307634Open ↗
03/30/2016321306298Open ↗
01/29/2016321209492Open ↗
Showing 3 of 13 on file for this type
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT34
03/06/2020321955470Open ↗
04/16/2019321955470Open ↗
07/19/2018321671437Open ↗
Showing 3 of 34 on file for this type
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET19
04/16/2019321955470Open ↗
10/24/2017321671437Open ↗
09/27/2016321374614Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION7
03/01/2017321306298Open ↗
10/04/2016321262842Open ↗
10/04/2016321248725Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM2
04/22/2020321955470Open ↗
07/19/2018321671437Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type