ECB02/25/20251RCNY 103-09(e). Failure to file a retaining wall condition assessmentreport by the deadline as required by 1RCNY 103-09(e)(2) and (5). To date, the department has not received a retaining wall condition assess$1K due
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB12/15/2022Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09Issued 2022; DOB's record still lists it as active
Two family converted from one family · 4,972 sf lot · 0.46 FAR built
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Contractors (License-Anchored)
Firm
Trade
Roles
Most Recent
Kinetic Elect'l Contracting
Electrical
2
03/21/2026
Building Lifecycle
02/25/2025
1RCNY 103-09(e). Failure to file a retaining wall condition assessmentreport by the deadline as required by 1RCNY 103-09(e)(2) and (5). To date,…
ECB violation · open
12/15/2022
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
DOB violation · open · Issued 2022; DOB's record still lists it as active