← Back
Primarily 2 family with 1 store or office
218 WEST 20 STREET
MANHATTAN · BIN 1013989
💬 Discuss this project
1920Year Built
3Stories
S2Building Class
R8BZoning
4,978 sfGross Floor Area
3Units
0 Open Violations
Primarily 2 family with 1 store or office · 2,150 sf lot · 2.32 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HKS CONSTRUCTION CORP503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/17/2017$7.8M—THE DOROTHEA AND LEO RABKIN FOUNDATION → Private party$1,557/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALAN WANZENBERG ARCHITECT PC101/23/2019
HAIDER ENGINEERING, P.E.112/20/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.203/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ORION CONSTRUCTION & PAINTINGGeneral Contractor707/08/2026
HKS CONSTRUCTION CORPGeneral Contractor303/21/2026
ROBERT J DIVILIOElectrical103/21/2026
Building Lifecycle
All (12)Filed (2)Permit Issued (5)Signed Off (2)Violation (1)Special Inspection (2)
05/20/2022
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00112428-I1
04/22/2022
Signed off — Alteration
Erect temporary construction fence in conjunction with Alt 1 #123588723.
M00114406-I1
01/27/2020
Permit issued — Construction Fence
M00114406-I1-FN
12/11/2019
Permit issued — Construction Fence
M00114406-I1-FN
06/20/2019
Permit issued — Construction Fence
M00114406-I1-FN
02/11/2019
Permit issued — Construction Fence
M00114406-I1-FN
01/23/2019
Filed — Alteration
Erect temporary construction fence in conjunction with Alt 1 #123588723.
M00114406-I1
01/18/2019
Special inspection requirement — Final
Alan Wanzenberg
12/21/2018
Permit issued — Sidewalk Shed
M00112428-I1-SH
12/20/2018
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00112428-I1
12/20/2018
Special inspection requirement — Final
Sunil Saigal
02/09/2015
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offORION CONSTRUCTION & PAIN01/27/2020
DOB NOWConstruction FenceSigned-offORION CONSTRUCTION & PAIN12/11/2019
DOB NOWConstruction FenceSigned-offORION CONSTRUCTION & PAIN06/20/2019
DOB NOWConstruction FenceSigned-offORION CONSTRUCTION & PAIN02/11/2019
DOB NOWSidewalk ShedSigned-offHKS CONSTRUCTION CORP12/21/2018
BISPLISSUEDMASTER 2 PLBG & HTG INC12/10/2021
BIS—ISSUEDORION CONSTRUCTION & PAINTING01/05/2021
BISPLISSUEDMASTER 2 PLBG & HTG INC12/09/2020
BIS—ISSUEDORION CONSTRUCTION & PAINTING01/29/2020
BIS—ISSUEDORION CONSTRUCTION & PAINTING12/09/2019
BISPLISSUEDMASTER 2 PLBG & HTG INC12/19/2018
BIS—ISSUEDORION CONSTRUCTION & PAINTING12/14/2018
BISPLISSUEDACCURATE MECHANICAL INC08/14/2017
3 projects · most recent 10/21/2019
General Wiring
FiledStatusContractorScope
10/21/2019CompleteWCK ELECTRIC CORP.—
12/29/2018CompleteREMEDY ELECTRIC LLCGeneral Wiring
12/20/2018CompleteRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
01/18/2019FinalAlan Wanzenbergprogress
12/20/2018FinalSunil Saigalprogress
▾Documents — 120 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00114406-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00112428-I1Request digital key ↗
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION14
12/26/2021123588723Open ↗
12/23/2021123588723Open ↗
12/22/2021123588723Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION6
01/29/2020123588723Open ↗
12/10/2019123588723Open ↗
12/20/2018123588723Open ↗
Showing 3 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
05/15/2009110295118Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/12/2021123588723Open ↗
▸Seals & Professional Certifications15
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
08/08/2019123588723Open ↗
08/08/2019123588723Open ↗
12/14/2018123588723Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026M00114406-I1Open ↗
08/13/2026M00112428-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026M00114406-I1Open ↗
08/23/2026M00112428-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/04/2017121233110Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/04/2017121233110Open ↗
▸Trade Schedules & Equipment29
▸BISEQUIPMENT USE PERMITS15
04/29/2022123588723Open ↗
04/29/2022123588723Open ↗
04/29/2022123588723Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING5
12/26/2021123588723Open ↗
12/23/2021123588723Open ↗
12/22/2021123588723Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
06/08/2018123588723Open ↗
08/31/2017121233110Open ↗
08/30/2017121233110Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
04/29/2022123588723Open ↗
04/25/2022123588723Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/19/2022123588723Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/19/2022123588723Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/31/2022123588723Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
08/04/2017121233110Open ↗
▸BISSTREET TREE CHECKLIST1
10/11/2018123588723Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/16/2008110295118Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
12/14/2018123588723Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/14/2018123588723Open ↗
10/11/2018123588723Open ↗
08/04/2017121233110Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/19/2022123588723Open ↗
11/29/2021121233110Open ↗
▸BISFENESTRATION AIR LEAKAGE1
01/31/2022123588723Open ↗
▸BISINTERIOR LIGHTING POWER1
01/19/2022123588723Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
01/19/2022123588723Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/31/2022123588723Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/19/2022123588723Open ↗
▸Inspections & Test Reports8
▸BISSTRUCTURAL STEEL - DETAILS1
01/19/2022123588723Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
01/19/2022123588723Open ↗
▸BISMECHANICAL SYSTEMS1
01/31/2022123588723Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/31/2022123588723Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/31/2022123588723Open ↗
▸BISPOST-INSTALLED ANCHORS1
01/19/2022123588723Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
01/19/2022123588723Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
01/19/2022123588723Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/29/2021121233110Open ↗
05/15/2009110295118Open ↗
▸BISFINAL1
11/29/2021121233110Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/16/2008110295118Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/14/2018123588723Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
11/29/2021121233110Open ↗
06/08/2018123588723Open ↗
08/04/2017121233110Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/31/2022123588723Open ↗
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION9
01/19/2022123588723Open ↗
01/19/2022123588723Open ↗
09/21/2021123588723Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET5
06/08/2018123588723Open ↗
06/08/2018123588723Open ↗
06/08/2018123588723Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
08/06/2019123588723Open ↗
08/30/2017121233110Open ↗
08/18/2017121233110Open ↗
▸Other Documents4
▸BISSTRUCTURAL COLD-FORMED STEEL1
01/19/2022123588723Open ↗
▸BISMAINTENANCE INFORMATION1
01/19/2022123588723Open ↗
▸BISPLOT DIAGRAM1
06/08/2018123588723Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00112428-I1Open ↗