← Back
Two stories - detached, small or mid-size
219-25 132 ROAD
QUEENS · Laurelton · BIN 4278390
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2Zoning
1,458 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,800 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof4p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SQUARE ARCH, LLC105/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOLOGISTICS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNATION SOLAR SYSTEMSGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802105/09/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
09/18/2024
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS,USE, OR OCCUPANCY.
Q01043668-I1
05/13/2024
Permit issued — Solar
Q01043668-I1-SL
05/09/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS,USE, OR OCCUPANCY.
Q01043668-I1
04/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
04/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
04/30/2024
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
04/30/2024
Special inspection requirement — Final
Chun Feng
04/30/2024
Special inspection requirement — Air barrier - visual inspection
Chun Feng
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNATION SOLAR SYSTEMS05/13/2024
BISPLISSUEDW.G. PLBG & HTG CORP04/08/2009
BISPLISSUEDW.G PLUMBING & HEATING11/29/2006
1 project · most recent 05/07/2024
FiledStatusContractorScope
05/07/2024CompleteGALLANT ELEC'L CONST, INC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/30/2024Fire-Resistant Penetrations and JointsChun Fengspecial
04/30/2024Structural Stability – Alterations of existing buildingsChun Fengspecial
04/30/2024Energy Code Compliance InspectionsChun Fengprogress
04/30/2024FinalChun Fengprogress
04/30/2024Air barrier - visual inspectionChun Fengenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q01043668-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026Q01043668-I1Open ↗
08/29/2026Q01043668-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/22/2026Q01043668-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026Q01043668-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/22/2026Q01043668-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01043668-I1Open ↗