← Back
Two family frame
219-37 112TH AVE
QUEENS · BIN 4624365
💬 Discuss this project
2023Year Built
2Stories
B2Building Class
R3-2Zoning
2,374 sfGross Floor Area
2Units
6 Open Violations ▸
Two family frame · Owner of record: 219-35 112 AVENUE LLC · 3,960 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 8 docs
Floor 220p · 2 filings · 20 docs
Floor 114p · 2 filings · 20 docs
Cellar15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J J DESIGNS103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/10/2025$1.3M—219-35 112 AVENUE LLC → Private party$563/sf building
03/19/2021$560K—Private party → R&J ACQ LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC103/22/2026
JAHMAL SABAHA PE CONSULTING ENGR903/31/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMS DRAFTING1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MOKEN HOME IMPROVEMENTGeneral Contractor407/08/2026
RAE MGMT INCGeneral Contractor407/08/2026
J&J DESIGNS INCGeneral Contractor303/21/2026
BT'S PLUMBING AND HEATINGPlumbing207/08/2026
TRINITY SOLAR LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036103/22/2026
AA BUILDING & INSPECTION1519603/31/2025
CL ENGINEERING P.C.6781110/14/2024
Building Lifecycle
All (77)Filed (10)Permit Issued (8)Signed Off (4)Violation (5)Inspection (10)Objection (10)Special Inspection (30)
03/25/2026
Permit issued — Solar
Q01374709-I1-SL
03/22/2026
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Q01374709-I1
03/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
03/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUL AHSAN
03/18/2026
Special inspection requirement — Final
Ayracon Almaraz
03/18/2026
Special inspection requirement — Air barrier - visual inspection
Ayracon Almaraz
03/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
KAMRUL AHSAN
07/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/17/2025
Special inspection requirement — Air barrier — testing
Younes Abouyaala
04/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
04/17/2025
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
04/17/2025
Special inspection requirement — Footing and Foundation
Younes Abouyaala
04/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/17/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
04/17/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
04/17/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
04/17/2025
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
04/17/2025
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/17/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
04/17/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
04/17/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
04/17/2025
Special inspection requirement — Masonry
Younes Abouyaala
04/17/2025
Special inspection requirement — Final
NAVEEN KUMAR
04/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
04/17/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
04/17/2025
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
04/17/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
04/17/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
04/17/2025
Special inspection requirement — Metering
Younes Abouyaala
04/17/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
03/31/2025
Filed — New Building
Propose HVAC with related components as per plan.
Q00656330-P2
03/04/2025
Signed off — Alteration
Propose plumbing fixtures throughout with related components, along with sprinkler wet piping throughout with related components.
Q00715815-I1
01/16/2025
Signed off — New Building
Propose HVAC with related components as per plan.
Q00656330-S5
01/08/2025
Permit issued — Mechanical Systems
Q00656330-S5-MS
12/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
12/23/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
12/16/2024
Signed off — Alteration
Q00445177-I1
12/10/2024
Filed — Alteration
Propose plumbing fixtures throughout with related components, along with sprinkler wet piping throughout with related components.
Q00715815-P2
12/04/2024
Permit issued — Plumbing
Q00715815-I1-PL
11/08/2024
Objection resolved — Addressed
11/04/2024
Objection raised — Admin
11/01/2024
Signed off — New Building
Propose HVAC with related components as per plan.
Q00656330-S1
10/31/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/28/2024
Filed — Alteration
Propose plumbing fixtures throughout with related components, along with sprinkler wet piping throughout with related components.
Q00715815-P1
10/14/2024
Filed — New Building
Propose HVAC with related components as per plan.
Q00656330-S5
10/07/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/09/2024
Filed — New Building
Propose HVAC with related components as per plan.
Q00656330-P1
07/09/2024
Permit issued — Curb Cut
Q00656330-S1-CC
05/17/2024
Filed — New Building
Propose HVAC with related components as per plan.
Q00656330-S1
03/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/02/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/07/2023
Violation issued (ECB, closed)
Construction
08/30/2023
Permit issued — Plumbing
Q00715815-I1-PL
04/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2023
Permit issued — Structural
Q00656330-I1-GC-CX
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedTRINITY SOLAR LLC03/25/2026
DOB NOWMechanical SystemsSigned-offMOKEN HOME IMPROVEMENT01/08/2025
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING12/04/2024
DOB NOWCurb CutSigned-offMOKEN HOME IMPROVEMENT07/09/2024
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING08/30/2023
DOB NOWStructuralPermit IssuedJ&J DESIGNS INC03/03/2023
DOB NOWConstruction FenceSigned-offRAE MGMT INC09/16/2021
DOB NOWConstruction FenceSigned-offRAE MGMT INC05/14/2021
1 project · most recent 03/31/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/31/2025Signed-offMOKEN HOME IMPROVEMENTHeating and Air Conditioning Systems
Heat / Cool
Cooper & Hunter Cooper & Hunter Model# CH-NHPR48LCU 44,010 BTU · Condensing Unit ×2
Cooper & Hunter Model# CH-36AHU 40,000 BTU · Fan Coil Indoor ×1
Cooper & Hunter Model# CH-48AHU 48,000 BTU · Fan Coil Indoor ×1
3 projects · most recent 05/06/2026
General Wiring
FiledStatusContractorScope
05/06/2026Permit IssuedISLAND ELECTRIC CORP—
03/18/2026CancelledREDLINE ELECTRIC INC—
07/26/2023CompleteINDY ELECTRIC CORP.General Wiring
1 project · most recent 03/31/2025
Concrete Masonry Wood
FiledStatusContractorScope
03/31/2025Signed-offMOKEN HOME IMPROVEMENTConcrete, Masonry, Wood
1 project · most recent 03/22/2026
FiledStatusContractorScope
03/22/2026Permit IssuedTRINITY SOLAR LLC36 panels, 14.76 kw, 936 roof_area_sqft
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/31/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/07/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
09/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
03/18/2026Structural Stability – Alterations of existing buildingsKAMRUL AHSANspecial
03/18/2026Fire-Resistant Penetrations and JointsKAMRUL AHSANspecial
03/18/2026Air barrier - visual inspectionAyracon Almarazenergy_progress
03/18/2026FinalAyracon Almarazprogress
03/18/2026Energy Code Compliance InspectionsAyracon Almarazprogress
04/17/2025Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
04/17/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/17/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
04/17/2025Subgrade InspectionsYounes Abouyaalaspecial
04/17/2025Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
04/17/2025Footing and FoundationYounes Abouyaalaprogress
04/17/2025Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
04/17/2025FinalNAVEEN KUMARprogress
04/17/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/17/2025MasonryYounes Abouyaalaspecial
04/17/2025Permanent certificateYounes Abouyaalaenergy_progress
04/17/2025Maintenance informationYounes Abouyaalaenergy_progress
04/17/2025MeteringYounes Abouyaalaenergy_progress
04/17/2025Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
04/17/2025Interior lighting powerYounes Abouyaalaenergy_progress
04/17/2025Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
04/17/2025Air barrier — testing Younes Abouyaalaenergy_progress
04/17/2025Fenestration areasYounes Abouyaalaenergy_progress
04/17/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
04/17/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
Latest 25 of 91.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
08/26/2026Q00715815-P2Request digital key ↗
08/26/2026Q00715815-I1Request digital key ↗
08/26/2026Q00715815-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00445177-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00656330-I1Open ↗
08/13/2026Q00656330-P1Open ↗
08/13/2026Q00656330-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00656330-P1Open ↗
08/13/2026Q00656330-P2Open ↗
08/13/2026Q00656330-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00656330-I1Open ↗
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026Q00656330-P1Open ↗
09/01/2026Q00656330-P1Open ↗
09/01/2026Q00656330-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026Q00445177-I1Open ↗
08/26/2026Q00715815-P1Open ↗
08/26/2026Q00715815-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026Q00656330-P1Open ↗
09/01/2026Q00656330-P1Open ↗
08/28/2026Q00715815-I1Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00656330-P2Open ↗
08/13/2026Q00656330-P1Open ↗
08/13/2026Q00656330-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00656330-P1Open ↗
08/13/2026Q00656330-P2Open ↗
08/13/2026Q00656330-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00656330-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00656330-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00656330-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01374709-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00656330-I1Open ↗
08/13/2026Q00715815-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/13/2026Q00656330-I1Open ↗
08/13/2026Q00656330-P2Open ↗
08/13/2026Q00656330-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00656330-P2Open ↗
08/13/2026Q00656330-P1Open ↗
08/13/2026Q00656330-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026Q00656330-P2Open ↗
08/21/2026Q00656330-P1Open ↗
08/14/2026Q00656330-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00656330-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00656330-I1Open ↗