← Back
One family attached or semi-detached
219-38 RYAN ROAD
QUEENS · Laurelton · BIN 4450459
💬 Discuss this project
1991Year Built
2Stories
A5Building Class
R3-2Zoning
1,400 sfGross Floor Area
1Units
One family attached or semi-detached · 3,313 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC103/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272103/05/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
06/11/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01013276-I1
03/07/2024
Permit issued — Solar
Q01013276-I1-SL
03/05/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01013276-I1
03/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
03/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/01/2024
Special inspection requirement — Final
Walid Abdulla
03/01/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC03/07/2024
BIS—ISSUEDDENNIS ORGANIZATION CO.07/31/1991
BISPLISSUEDWATER WORKS PIPING INC11/13/1990
1 project · most recent 03/05/2024
FiledStatusContractorScope
03/05/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/01/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/01/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
03/01/2024Energy Code Compliance InspectionsWalid Abdullaprogress
03/01/2024FinalWalid Abdullaprogress
03/01/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026Q01013276-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q01013276-I1Open ↗
08/25/2026Q01013276-I1Open ↗
08/25/2026Q01013276-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q01013276-I1Open ↗
08/25/2026Q01013276-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01013276-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01013276-I1Open ↗