← Back
Two family converted from one family
219-42 112 ROAD
QUEENS · BIN 4241732
💬 Discuss this project
1950Year Built
2Stories
B3Building Class
R3-2Zoning
2,894 sfGross Floor Area
2Units
Two family converted from one family · 5,000 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
Architecture
Floor 219p · 2 filings · 20 docs
Floor 115p · 1 filing · 20 docs
Cellar16p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZMIROT1507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/02/2025$1.5M—— → —$511/sf building
08/20/2024$612K—— → —$212/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN505/29/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
26 BONIM LLCGeneral Contractor307/08/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519405/29/2025
Building Lifecycle
All (59)Filed (5)Permit Issued (3)Signed Off (2)Inspection (7)Objection (12)Special Inspection (30)
07/09/2025
Signed off — Alteration
installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the existing one family dwelling to be converted into a two family dwelling. Filed in conjunction with ALT I app #Q01118984-I1
Q01173849-I1
06/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
06/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
06/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
06/03/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
05/29/2025
Filed — Alteration
installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the existing one family dwelling to be converted into a two family dwelling. Filed in conjunction with ALT I app #Q01118984-I1
Q01173849-P1
05/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
05/29/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
05/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
05/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
05/22/2025
Signed off — Alteration
Q01131963-I1
05/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/07/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/01/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
05/01/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
05/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
05/01/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
05/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
05/01/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
05/01/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
05/01/2025
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
05/01/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
05/01/2025
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
05/01/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
05/01/2025
Special inspection requirement — Metering
Younes Abouyaala
05/01/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
05/01/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
05/01/2025
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
05/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/01/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
05/01/2025
Special inspection requirement — Chimneys and vents
Younes Abouyaala
04/21/2025
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS.
Q01118984-P1
03/26/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/26/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/11/2025
Permit issued — Plumbing
Q01173849-I1-PL
01/31/2025
Filed — Alteration
installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the existing one family dwelling to be converted into a two family dwelling. Filed in conjunction with ALT I app #Q01118984-I1
Q01173849-I1
01/31/2025
Permit issued — General Construction
Q01118984-I1-GC-CX
01/28/2025
Objection resolved — Addressed
12/12/2024
Objection resolved — Addressed
11/01/2024
Permit issued — Construction Fence
Q01131963-I1-FN
10/30/2024
Filed — Alteration
Q01131963-I1
10/28/2024
Objection resolved — Addressed
10/28/2024
Objection resolved — Addressed
10/28/2024
Objection resolved — Addressed
10/28/2024
Objection resolved — Addressed
10/24/2024
Objection raised — Energy
10/24/2024
Objection raised — Zoning
10/24/2024
Objection raised — Scope
10/24/2024
Objection raised — Inspections
10/24/2024
Objection raised — Zoning
10/24/2024
Objection raised — Structural
10/08/2024
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS.
Q01118984-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLBG P & H INC02/11/2025
DOB NOWGeneral ConstructionPermit Issued26 BONIM01/31/2025
DOB NOWConstruction FenceSigned-off26 BONIM11/01/2024
1 project · most recent 06/03/2025
General Wiring
FiledStatusContractorScope
06/03/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 04/21/2025
Concrete Wood
FiledStatusContractorScope
04/21/2025Permit Issued26 BONIM LLCConcrete, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/26/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/26/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
06/03/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/03/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/03/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
06/03/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
06/03/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
06/03/2025Maintenance informationYounes Abouyaalaenergy_progress
05/29/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/29/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/29/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
05/29/2025Maintenance informationYounes Abouyaalaenergy_progress
05/29/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
05/29/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
05/01/2025Fenestration air leakageYounes Abouyaalaenergy_progress
05/01/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
05/01/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
05/01/2025Permanent certificateYounes Abouyaalaenergy_progress
05/01/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
05/01/2025Fenestration areasYounes Abouyaalaenergy_progress
05/01/2025Interior lighting powerYounes Abouyaalaenergy_progress
05/01/2025Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
05/01/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
05/01/2025Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
05/01/2025Maintenance informationYounes Abouyaalaenergy_progress
05/01/2025MeteringYounes Abouyaalaenergy_progress
05/01/2025Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
Latest 25 of 58.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q01131963-I1Request digital key ↗
08/20/2026Q01118984-I1Request digital key ↗
08/20/2026Q01118984-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01118984-I1Open ↗
08/13/2026Q01118984-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01118984-I1Open ↗
08/13/2026Q01118984-P1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature10
09/29/2026Q01118984-P1Open ↗
09/29/2026Q01118984-P1Open ↗
09/29/2026Q01118984-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/29/2026Q01118984-P1Open ↗
09/29/2026Q01118984-P1Open ↗
08/31/2026Q01173849-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q01131963-I1Open ↗
08/13/2026Q01118984-P1Open ↗
08/13/2026Q01118984-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01118984-I1Open ↗
08/13/2026Q01118984-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026Q01173849-P1Open ↗
08/13/2026Q01118984-P1Open ↗
08/13/2026Q01118984-I1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q01118984-P1Open ↗
08/13/2026Q01118984-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01118984-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026Q01118984-I1Open ↗
08/13/2026Q01118984-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01118984-I1Open ↗
08/13/2026Q01118984-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q01118984-P1Open ↗
08/13/2026Q01118984-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/13/2026Q01118984-I1Open ↗
08/13/2026Q01118984-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01118984-I1Open ↗