← Back
BuildNYC
Large suburban residence
219 CHEEVERS LANE
STATEN ISLAND · BIN 5165163
💬 Discuss this project
2021Year Built
2Stories
A3Building Class
R1-2Zoning
4,013 sfGross Floor Area
1Units
Large suburban residence · 6,595 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 7 docs
Floor 29p · 3 filings · 9 docs
Floor 110p · 3 filings · 9 docs
Cellar9p · 3 filings · 9 docs
Site & exteriorProposed construction fence1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1671 Hylan BLVD203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tom Petersen Architect107/15/2026
Tony Sayad Architect210/26/2020
A Tech Engineering NYC209/17/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A Tech Engineering NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Capital Contracting P&Hspecialty_contractor907/08/2026
Blue Star GroupGeneral Contractor203/21/2026
R&M Piping & HeatingPlumbing107/08/2026
Ficazzola Consultingspecialty_contractor107/25/2026
Blue Star GroupScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854107/15/2026
A Tech Engineering NYC, P6738103/20/2020
Building Lifecycle
08/31/2026
Signed off — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
S01431539-I1
07/24/2026
Permit issued — Solar
S01431539-I1-SL
07/15/2026
Filed — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
S01431539-I1
07/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
07/15/2026
Special inspection requirement — Final
TOM PETERSEN
22 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offFicazzola Consulting07/24/2026
DOB NOWSprinklersSigned-offCapital Contracting P & H03/08/2021
DOB NOWPlumbingPermit IssuedCapital Contracting P&H03/07/2021
DOB NOWPlumbingSigned-offCapital Contracting P&H03/05/2021
DOB NOWConstruction FenceSigned-offBlue Star Group10/28/2020
DOB NOWPlumbingPermit IssuedR&M Piping & Heating06/25/2020
DOB NOWPlumbingPermit IssuedCapital Contracting P&H03/02/2020
BIS—ISSUEDBlue Star Group04/07/2021
BIS—ISSUEDBlue Star Group10/22/2020
BIS—ISSUEDBlue Star Group02/13/2020
1 project · most recent 09/17/2020
FiledStatusContractorScope
09/17/2020Signed-offCapital Contracting P & H—
2 projects · most recent 09/17/2020
Water/Sanitary Gas Storm
FiledStatusContractorScope
09/17/2020Signed-offCapital Contracting P&HWater/Sanitary
01/16/2020Permit IssuedCapital Contracting P&HGas, Storm, Water/Sanitary
3 projects · most recent 07/14/2026
General Wiring
FiledStatusContractorScope
07/14/2026CompleteAmber Electl Contng—
07/14/2021CompleteTrue ElectricGeneral Wiring
03/29/2018CancelledTrue ElectricGeneral Wiring
1 project · most recent 07/15/2026
FiledStatusContractorScope
07/15/2026Signed-offFicazzola Consulting—
1 project · most recent 10/26/2020
Fence
FiledStatusContractorScope
10/26/2020Signed-offBlue Star GroupFence
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/15/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
07/15/2026FinalTOM PETERSENprogress
07/15/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
07/15/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
07/15/2026Energy Code Compliance InspectionsTOM PETERSENprogress
09/21/2020Sprinkler Systemsanthony santorospecial
08/13/2020Sprinkler Systems—special
92 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account