| Owner | Filings | Most Recent |
|---|---|---|
| PFIZER | 324 | 03/21/2026 |
| 219 GC | 138 | 10/01/2026 |
| DAVID WERNER REAL ESTATE INVESTM | 10 | 03/21/2026 |
| JEM CONTRACTING | 8 | 07/08/2026 |
| PFIZER GLOBAL OPERATIONS | 6 | 04/09/2026 |
| PRESTIGE CONSTRUCTION SERVICES | 2 | 03/21/2026 |
| 219 OWNER LLC | 1 | 03/22/2026 |
| 219/235 EAST LLC C/O DWREI | 1 | 03/21/2026 |
| 219 235 EAST LLC C O DWREI | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 07/09/2024 | $60.0M | — | ARE-NY REGION NO. 1, LLC → 219 OWNER LLC | $200/sf building |
| 07/10/2018 | $142.0M | — | PFIZER INC. → 219/235 EAST LLC | $473/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| GACE DPC | 6 | 07/31/2026 |
| GENSLER | 5 | 03/19/2026 |
| OSPINO ENGINEERING PLLC | 2 | 11/10/2025 |
| JMV CONSULTING ENGINEERING | 9 | 09/11/2025 |
| ASHRAF CORP | 7 | 08/01/2025 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 06/04/2025 |
| H & O ENGINEERING, DPC | 2 | 03/26/2025 |
| BLACK SHEEP ENGINEERING GROUP | 4 | 03/19/2025 |
| SURFACE DESIGN | 2 | 02/26/2025 |
| FL&M ENGINEERING DESIGN &INSPECTION | 1 | 11/01/2022 |
| HOFFMANN ARCHITECTS, INC. | 1 | 10/21/2022 |
| JAROS BAUM & BOLLES | 1 | 12/02/2019 |
| MARTIN E. RICH | 3 | 11/28/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| DVA Advisors | 21 | 03/21/2026 |
| KD DESIGNS | 11 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 1 | 03/21/2026 |
| HIERARCH-E | 4 | 03/21/2026 |
| RENAISSANCE CODE CONSULTANTS | 8 | 03/21/2026 |
| GREEN STUDIO | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| ARSENAL SCAFFOLD INC | General Contractor | 23 | 10/01/2026 |
| 219 GC LLC | General Contractor | 17 | 07/08/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 9 | 07/19/2026 |
| NORTHEAST SPECIALIST GROUP | General Contractor | 9 | 07/08/2026 |
| TT MECHANICAL CORP | Plumbing | 4 | 07/08/2026 |
| JEM CONTRACTING CORP | General Contractor | 3 | 07/08/2026 |
| DEFALCO CONSTRUCTION INC | General Contractor | 3 | 07/08/2026 |
| SOLAS ELECTRICAL CORP | Electrical | 1 | 03/22/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 1 | 04/09/2026 |
| STRUCTURE TONE, LLC | General Contractor | 1 | 04/09/2026 |
| THE GRENADIER CORPORATION | General Contractor | 1 | 04/09/2026 |
| TTM GROUP CORP | Fire Protection | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| DOMANI INSPECTION SERVICE | 843 | 19 | 07/31/2026 |
| GACE CONSULTING ENGINEERS | 1545 | 4 | 07/31/2026 |
| COLE TECHNOLOGIES/CONTROL | 1290 | 1 | 10/21/2022 |
| JACK GREEN ASSOCIATES | 422 | 1 | 12/02/2019 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 09/30/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 08/28/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 08/28/2026 |
| DOB NOW | Construction Fence | Permit Issued | ARSENAL SCAFFOLD INC | 08/28/2026 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 07/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 07/17/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 07/08/2026 |
| DOB NOW | Structural | Permit Issued | 219 GC LLC | 06/17/2026 |
| DOB NOW | General Construction | Permit Issued | 219 GC LLC | 06/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | 219 GC LLC | 06/11/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 06/10/2026 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 06/08/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | JEM CONTRACTING CORP | 03/27/2026 |
| DOB NOW | General Construction | Permit Issued | 219 GC LLC | 03/26/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 03/19/2026 |
| DOB NOW | General Construction | Permit Issued | 219 GC LLC | 12/26/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | JEM CONTRACTING CORP | 12/11/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 12/08/2025 |
| DOB NOW | General Construction | Signed-off | NORTHEAST SPECIALIST GROUP | 10/20/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 10/01/2025 |
| DOB NOW | General Construction | Permit Issued | 219 GC LLC | 09/17/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 09/09/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 09/09/2025 |
| DOB NOW | Construction Fence | Permit Issued | ARSENAL SCAFFOLD INC | 09/09/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | DEFALCO CONSTRUCTION | 08/21/2025 |
| DOB NOW | Foundation | Permit Issued | 219 GC LLC | 08/20/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ARSENAL SCAFFOLD INC | 08/01/2025 |
| DOB NOW | Plumbing | Signed-off | TT MECHANICAL CORP | 07/28/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | JEM CONTRACTING CORP | 06/27/2025 |
| DOB NOW | Mechanical Systems | Signed-off | NORTHEAST SPECIALIST GROUP | 06/20/2025 |
| DOB NOW | General Construction | Permit Issued | NORTHEAST SPECIALIST GROUP | 06/20/2025 |
| DOB NOW | General Construction | Signed-off | NORTHEAST SPECIALIST GROUP | 06/20/2025 |
| DOB NOW | General Construction | Permit Issued | 219 GC LLC | 06/17/2025 |
| DOB NOW | Plumbing | Permit Issued | TT MECHANICAL CORP | 06/16/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | 219 GC LLC | 06/12/2025 |
| DOB NOW | Structural | Permit Issued | 219 GC LLC | 06/04/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | DEFALCO CONSTRUCTION | 06/04/2025 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 06/02/2025 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 06/02/2025 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 05/30/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/31/2026 | Signed-off | NORTHEAST SPECIALIST GROU | Others | Other N/A N/A 1 BTU ×41 |
| 01/23/2026 | Permit Issued | 219 GC LLC | Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Mitsubishi Electric MXZ-SM36NAM2 36,000 BTU · Heat Pump Outdoor ×1 PUHY-HP96YNU-A1 96,000 BTU · Vrf Outdoor ×1 Heat / Cool Mitsubishi Electric PUHY-HP192YSNU-A1 192,000 BTU · Vrf Outdoor ×16 MXZ-SM60NAM2 60,000 BTU · Heat Pump Outdoor ×5 MXZ-SM36NAM2 36,000 BTU · Heat Pump Outdoor ×4 PUHY-P120TNU-A 120,000 BTU · Vrf Outdoor ×4 PUHY-P72TNU-A 72,000 BTU · Vrf Outdoor ×4 MXZ-SM48NAM2 48,000 BTU · Heat Pump Outdoor ×3 PUHY-P96TNU-A 96,000 BTU · Vrf Outdoor ×3 PUHY-EP192TNU-A1 192,000 BTU · Vrf Outdoor ×2 PUHY-HP120YNU-A1 120,000 BTU · Vrf Outdoor ×2 PUHY-P168TNU-A 168,000 BTU · Vrf Outdoor ×1 PUHY-P96YNU-A 96,000 BTU · Vrf Outdoor ×1 Carrier 50FCQA06 60,500 BTU · Heat Pump Outdoor ×3 Ephoca APE10N3H2 (HPAC-1), APK10N3H2 (HPAC-2) 8,900 BTU · Heat Pump Outdoor ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/31/2026 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 19 outlets |
| 01/23/2026 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/31/2026 | Signed-off | TT MECHANICAL CORP | Gas, Water/Sanitary |
| 01/23/2026 | Permit Issued | TT MECHANICAL CORP | Storm, Water/Sanitary |
| 09/11/2025 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/06/2025 | Permit Issued | ROZ-A-LITE ELEC'L CONTG I | General Wiring |
| 09/30/2025 | Permit Issued | ROZ-A-LITE ELEC'L CONTG I | — |
| 07/20/2025 | Permit Issued | JAM ELECTRICAL CORP | — |
| 12/09/2024 | Permit Issued | SOLAS ELECTRICAL CORP | — |
| 10/10/2024 | Permit Issued | SOLAS ELECTRICAL CORP | — |
| 10/10/2024 | Permit Issued | SOLAS ELECTRICAL CORP | — |
| 10/10/2024 | Permit Issued | SOLAS ELECTRICAL CORP | — |
| 08/28/2024 | Permit Issued | ROZ-A-LITE ELEC'L CONTG I | — |
| 10/28/2022 | Complete | TOP SHELF ELECTRIC CORP | — |
| 09/16/2019 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 09/10/2019 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 02/25/2019 | Cancelled | T. DIRUSSO ELEC'L CONT IN | General Wiring |
| 08/22/2018 | Complete | UNITY ELECTRIC CO INC | General Wiring |
| 01/26/2018 | Complete | UNITY ELECTRIC CO INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/31/2026 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | Steel, Concrete |
| 01/23/2026 | Permit Issued | 219 GC LLC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/10/2025 | Permit Issued | 219 GC LLC | Scaffold |
| 04/23/2025 | Permit Issued | ARSENAL SCAFFOLD INC | Sidewalk Shed |
| 09/14/2024 | Permit Issued | ARSENAL SCAFFOLD INC | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/24/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/08/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/20/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 02/10/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/28/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 01/07/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/09/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/04/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/28/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/25/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/25/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/24/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/21/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/14/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/13/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/13/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/10/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/07/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/03/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/24/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/21/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/16/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/14/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/14/2026 | Structural Steel - Welding | JOHN MCMONAGLE | special |
| 08/14/2026 | Final | JOHN MCMONAGLE | progress |
| 08/14/2026 | Concrete - Cast-In-Place | JOHN MCMONAGLE | special |
| 08/14/2026 | Post-installed Anchors | CHRISTOPHER BEHAN | special |
| 08/14/2026 | Structural Steel - Details | JOHN MCMONAGLE | special |
| 08/14/2026 | Structural Steel - High Strength Bolting | JOHN MCMONAGLE | special |
| 07/31/2026 | Concrete - Cast-In-Place | JOHN MCMONAGLE | special |
| 07/31/2026 | Post-installed Anchors | CHRISTOPHER BEHAN | special |
| 07/31/2026 | Final | JOHN MCMONAGLE | progress |
| 07/31/2026 | Footing and Foundation | JOHN MCMONAGLE | progress |
| 07/27/2026 | Final | JOHN MCMONAGLE | progress |
| 07/27/2026 | Post-installed Anchors | CHRISTOPHER BEHAN | special |
| 07/27/2026 | Structural Steel - Welding | JOHN MCMONAGLE | special |
| 07/27/2026 | Structural Steel - High Strength Bolting | JOHN MCMONAGLE | special |
| 07/27/2026 | Structural Steel - Details | JOHN MCMONAGLE | special |
| 07/27/2026 | Footing and Foundation | JOHN MCMONAGLE | progress |
| 07/27/2026 | Concrete - Cast-In-Place | JOHN MCMONAGLE | special |
| 07/27/2026 | Final | JOHN MCMONAGLE | progress |
| 07/27/2026 | Post-installed Anchors | CHRISTOPHER BEHAN | special |
| 07/27/2026 | Concrete - Cast-In-Place | JOHN MCMONAGLE | special |
| 02/04/2026 | HVAC-R and service water heating system controls | JOHN MCMONAGLE | energy_progress |
| 02/04/2026 | HVAC-R and service water heating equipment | JOHN MCMONAGLE | energy_progress |
| 02/04/2026 | HVAC-R and service water piping design and insulation | JOHN MCMONAGLE | energy_progress |
| 02/04/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 02/04/2026 | Maintenance information | JOHN MCMONAGLE | energy_progress |