| Owner | Filings | Most Recent |
|---|---|---|
| Pfizer | 337 | 04/09/2026 |
| 219 GC | 141 | 10/20/2026 |
| David Werner Real Estate Investm | 10 | 03/21/2026 |
| 219 235 East | 2 | 03/21/2026 |
| 219 Owner | 1 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 07/09/2024 | $60.0M | — | ARE-NY REGION NO. 1, LLC → 219 OWNER LLC | $200/sf building |
| 07/10/2018 | $142.0M | — | PFIZER INC. → 219/235 EAST LLC | $473/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| JMV Consulting Engineering | 11 | 10/05/2026 |
| Gensler | 6 | 10/02/2026 |
| Gace | 6 | 07/31/2026 |
| Ospino Engineering | 2 | 11/10/2025 |
| Ashraf | 7 | 08/01/2025 |
| Lombardo Professional Engineering | 1 | 06/04/2025 |
| NYC Department of Housing Preservation and Development | 2 | 03/26/2025 |
| Black Sheep Engineering Group | 4 | 03/19/2025 |
| Surface Design | 2 | 02/26/2025 |
| FL&M Engineering Design & Inspection | 1 | 11/01/2022 |
| Hoffmann Architects | 1 | 10/21/2022 |
| Jaros Baum & Bolles | 1 | 12/02/2019 |
| Martin E. Rich | 3 | 11/28/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| DVA Advisors | 21 | 03/21/2026 |
| KD Designs | 11 | 03/21/2026 |
| Lombardo Building Consultants | 1 | 03/21/2026 |
| Hierarch-E | 4 | 03/21/2026 |
| Renaissance Code Consultants | 8 | 03/21/2026 |
| Green Studio | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Arsenal Scaffold | Scaffold | 23 | 10/01/2026 |
| 219 GC | General Contractor | 17 | 07/08/2026 |
| Rael Automatic Sprinkler Co | Fire Protection | 9 | 07/19/2026 |
| Northeast Specialist Group | General Contractor | 9 | 07/08/2026 |
| TT Mechanical | Plumbing | 4 | 07/08/2026 |
| Jem Contracting | Scaffold | 3 | 07/08/2026 |
| Defalco Construction | Scaffold | 2 | 04/09/2026 |
| TTM Group | Fire Protection | 1 | 07/08/2026 |
| Defalco Construction | General Contractor | 1 | 07/08/2026 |
| Structure Tone | General Contractor | 1 | 04/09/2026 |
| The Grenadier | General Contractor | 1 | 04/09/2026 |
| Spring Scaffolding | Scaffold | 1 | 04/09/2026 |
| Solas Electrical | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Domani Inspection Service | 843 | 21 | 10/05/2026 |
| Gace Consulting Engineers | 1545 | 5 | 07/31/2026 |
| Cole Technologies/Control | 1290 | 1 | 10/21/2022 |
| Jack Green Associates | 422 | 1 | 12/02/2019 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Boiler Equipment | Permit Issued | RB Heating Consulting Group | 10/19/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Arsenal Scaffold | 09/30/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Arsenal Scaffold | 08/28/2026 |
| DOB NOW | Construction Fence | Permit Issued | Arsenal Scaffold | 08/28/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Arsenal Scaffold | 08/28/2026 |
| DOB NOW | Sprinklers | Permit Issued | Rael Automatic Sprinkler Co | 07/17/2026 |
| DOB NOW | Standpipe | Permit Issued | Rael Automatic Sprinkler Co | 07/17/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Arsenal Scaffold | 07/08/2026 |
| DOB NOW | Structural | Permit Issued | 219 GC | 06/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | 219 GC | 06/11/2026 |
| DOB NOW | General Construction | Permit Issued | 219 GC | 06/11/2026 |
| DOB NOW | Sprinklers | Permit Issued | Rael Automatic Sprinkler Co | 06/10/2026 |
| DOB NOW | Standpipe | Permit Issued | Rael Automatic Sprinkler Co | 06/08/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | Jem Contracting | 03/27/2026 |
| DOB NOW | General Construction | Permit Issued | 219 GC | 03/26/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Arsenal Scaffold | 03/19/2026 |
| DOB NOW | General Construction | Permit Issued | 219 GC | 12/26/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | Jem Contracting | 12/11/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Arsenal Scaffold | 12/08/2025 |
| DOB NOW | General Construction | Signed-off | Northeast Specialist Group | 10/20/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | Arsenal Scaffold | 10/01/2025 |
| DOB NOW | General Construction | Permit Issued | 219 GC | 09/17/2025 |
| DOB NOW | Construction Fence | Permit Issued | Arsenal Scaffold | 09/09/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Arsenal Scaffold | 09/09/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Arsenal Scaffold | 09/09/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Defalco Construction | 08/21/2025 |
| DOB NOW | Foundation | Permit Issued | 219 GC | 08/20/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Arsenal Scaffold | 08/01/2025 |
| DOB NOW | Plumbing | Signed-off | TT Mechanical | 07/28/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | Jem Contracting | 06/27/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Northeast Specialist Group | 06/20/2025 |
| DOB NOW | General Construction | Permit Issued | Northeast Specialist Group | 06/20/2025 |
| DOB NOW | General Construction | Signed-off | Northeast Specialist Group | 06/20/2025 |
| DOB NOW | General Construction | Permit Issued | 219 GC | 06/17/2025 |
| DOB NOW | Plumbing | Permit Issued | TT Mechanical | 06/16/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | 219 GC | 06/12/2025 |
| DOB NOW | Structural | Permit Issued | 219 GC | 06/04/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Defalco Construction | 06/04/2025 |
| DOB NOW | Standpipe | Permit Issued | Rael Automatic Sprinkler Co | 06/02/2025 |
| DOB NOW | Standpipe | Permit Issued | Rael Automatic Sprinkler Co | 06/02/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/05/2026 | Permit Issued | 219 GC | Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Mitsubishi Electric MXZ-SM36NAM2 36,000 BTU · Heat Pump Outdoor ×1 PUHY-HP96YNU-A1 96,000 BTU · Vrf Outdoor ×1 Heat / Cool Mitsubishi Electric PUHY-HP192YSNU-A1 192,000 BTU · Vrf Outdoor ×16 MXZ-SM60NAM2 60,000 BTU · Heat Pump Outdoor ×5 MXZ-SM36NAM2 36,000 BTU · Heat Pump Outdoor ×4 PUHY-P120TNU-A 120,000 BTU · Vrf Outdoor ×4 PUHY-P72TNU-A 72,000 BTU · Vrf Outdoor ×4 MXZ-SM48NAM2 48,000 BTU · Heat Pump Outdoor ×3 PUHY-P96TNU-A 96,000 BTU · Vrf Outdoor ×3 PUHY-EP192TNU-A1 192,000 BTU · Vrf Outdoor ×2 PUHY-HP120YNU-A1 120,000 BTU · Vrf Outdoor ×2 PUHY-P168TNU-A 168,000 BTU · Vrf Outdoor ×1 PUHY-P96YNU-A 96,000 BTU · Vrf Outdoor ×1 Carrier 50FCQA06 60,500 BTU · Heat Pump Outdoor ×3 Ephoca APE10N3H2 (HPAC-1), APK10N3H2 (HPAC-2) 8,900 BTU · Heat Pump Outdoor ×2 |
| 07/31/2026 | Signed-off | Northeast Specialist Group | Others | Other N/A N/A 1 BTU ×41 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/05/2026 | Permit Issued | Rael Automatic Sprinkler Co | Sprinkler System |
| 07/31/2026 | Permit Issued | Rael Automatic Sprinkler Co | 19 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/05/2026 | Permit Issued | TT Mechanical | Storm, Water/Sanitary |
| 07/31/2026 | Signed-off | TT Mechanical | Gas, Water/Sanitary |
| 09/11/2025 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/06/2025 | Permit Issued | Roz-A-Lite Electrical Contg I | General Wiring |
| 09/30/2025 | Permit Issued | Roz-A-Lite Electrical Contg I | — |
| 07/20/2025 | Permit Issued | Jam Electrical | — |
| 12/09/2024 | Permit Issued | Solas Electrical | — |
| 10/10/2024 | Permit Issued | Solas Electrical | — |
| 10/10/2024 | Permit Issued | Solas Electrical | — |
| 10/10/2024 | Permit Issued | Solas Electrical | — |
| 08/28/2024 | Permit Issued | Roz-A-Lite Electrical Contg I | — |
| 10/28/2022 | Complete | Top Shelf Electric | — |
| 09/16/2019 | Complete | Nead Electric | General Wiring |
| 09/10/2019 | Complete | Nead Electric | General Wiring |
| 02/25/2019 | Cancelled | T. Dirusso Electrical Cont | General Wiring |
| 08/22/2018 | Complete | Unity Electric Co | General Wiring |
| 01/26/2018 | Complete | Unity Electric Co | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/05/2026 | Permit Issued | 219 GC | Steel, Concrete |
| 07/31/2026 | Permit Issued | Rael Automatic Sprinkler Co | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/10/2025 | Permit Issued | 219 GC | Scaffold |
| 04/23/2025 | Permit Issued | Arsenal Scaffold | Sidewalk Shed |
| 09/14/2024 | Permit Issued | Arsenal Scaffold | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 10/08/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/28/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 09/25/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 09/18/2026 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 02/20/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 01/07/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/09/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/25/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/24/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/21/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/14/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/07/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/03/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/21/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/16/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/14/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/01/2025 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 09/23/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/20/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/16/2024 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 12/16/2024 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/05/2026 | Emergency and Standby Power Systems (Generator) | — | special |
| 09/14/2026 | HVAC-R and service water piping design and insulation | JOHN MCMONAGLE | energy_progress |
| 09/14/2026 | Shutoff dampers | JOHN MCMONAGLE | energy_progress |
| 09/14/2026 | Metering | JOHN MCMONAGLE | energy_progress |
| 09/14/2026 | Maintenance information | JOHN MCMONAGLE | energy_progress |
| 09/14/2026 | Duct leakage testing, insulation and design | JOHN MCMONAGLE | energy_progress |
| 09/14/2026 | Electrical motors and elevators | JOHN MCMONAGLE | energy_progress |
| 09/14/2026 | Exterior lighting power | JOHN MCMONAGLE | energy_progress |
| 09/14/2026 | HVAC-R and service water heating system controls | JOHN MCMONAGLE | energy_progress |
| 09/14/2026 | Lighting controls | JOHN MCMONAGLE | energy_progress |
| 09/14/2026 | HVAC-R and service water heating equipment | JOHN MCMONAGLE | energy_progress |
| 09/14/2026 | Final | JOHN MCMONAGLE | progress |
| 09/14/2026 | Post-installed Anchors | JOHN MCMONAGLE | special |
| 09/14/2026 | Mechanical Systems | JOHN MCMONAGLE | special |
| 09/14/2026 | Interior lighting power | JOHN MCMONAGLE | energy_progress |
| 09/14/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 09/14/2026 | Lighting in dwelling units | JOHN MCMONAGLE | energy_progress |
| 09/14/2026 | Public Assembly Emergency Lighting | — | progress |
| 08/14/2026 | Structural Steel - High Strength Bolting | JOHN MCMONAGLE | special |
| 08/14/2026 | Structural Steel - Details | JOHN MCMONAGLE | special |
| 08/14/2026 | Structural Steel - Welding | JOHN MCMONAGLE | special |
| 08/14/2026 | Final | JOHN MCMONAGLE | progress |
| 08/14/2026 | Concrete - Cast-In-Place | JOHN MCMONAGLE | special |
| 08/14/2026 | Post-installed Anchors | CHRISTOPHER BEHAN | special |
| 08/11/2026 | Sprayed fire-resistant materials | JOHN MCMONAGLE | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Pfizer | Office | Sub-basement, Floor 1 | Project M00187371 |