← Back
Over six families without stores
219 EAST 5 STREET
MANHATTAN · East Village · BIN 1076946
💬 Discuss this project
1900Year Built
5Stories
C1Building Class
R8BZoning
9,190 sfGross Floor Area
14Units
Rent Stabilized42 Open Violations 37 unresolved · 5 paperwork only ▸
Over six families without stores · Owner of record: 219 EAST 5TH ST LLC · 2,425 sf lot · 3.79 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipmentLandscapeGeneralOther
Floor 45p · 1 filing · 9 docs
Floor 311p · 2 filings · 17 docs
Floor 29p · 2 filings · 17 docs
Floor 13p · 1 filing · 2 docs
Site & exterior7p · 1 filing · 13 docs
Filed — no permit issued19p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PETER DANNY CONTRACTORS407/08/2026
219 EAST 5TH ST LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/17/2022$2.6M—— → —$283/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYED ENGINEERING, P.C.111/25/2024
CONCESSI ENGINEERING, P.C.810/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MP DESIGN AND CONSTRUCTION1603/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOTAL BUILDER CONSTRUCTIOGeneral Contractor1007/08/2026
PETER & DANNY CONTRACT LLGeneral Contractor107/08/2026
GLENNS PLUMBING SVCS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCESSI ENGINEERING, P.C540507/12/2024
Building Lifecycle
All (107)Filed (9)Permit Issued (8)Signed Off (4)Violation (60)Inspection (2)Objection (6)Special Inspection (18)
09/04/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
C
05/16/2026
Violation issued (HPD, open)
C
03/22/2026
Violation issued (HPD, closed)
C
03/22/2026
Violation issued (HPD, open)
C
03/05/2026
Violation issued (HPD, closed)
C
03/04/2026
Violation issued (HPD, closed)
A
03/04/2026
Violation issued (HPD, closed)
C
03/04/2026
Violation issued (HPD, open)
A
03/04/2026
Violation issued (HPD, open)
B
03/04/2026
Violation issued (HPD, closed)
A
03/04/2026
Violation issued (HPD, closed)
C
03/04/2026
Violation issued (HPD, open)
C
03/04/2026
Violation issued (HPD, closed)
B
03/04/2026
Violation issued (HPD, closed)
B
03/04/2026
Violation issued (HPD, open)
A
03/04/2026
Violation issued (HPD, closed)
B
02/04/2026
Violation issued (HPD, closed)
C
02/04/2026
Violation issued (HPD, open)
C
10/20/2025
Signed off — Alteration
REPAIRS OF EXISTING MORTAR IN THE REAR BUILDING FACADE THAT IS DETERIORATED. REPAIR OF LINTEL IN FRONT BUILDING. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M08041370-S2
10/20/2025
Signed off — Alteration
REPAIRS OF EXISTING MORTAR IN THE REAR BUILDING FACADE THAT IS DETERIORATED. REPAIR OF LINTEL IN FRONT BUILDING. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M08041370-I1
08/11/2025
Violation issued (ECB, closed)
Construction
06/27/2025
Violation issued (HPD, closed)
B
06/27/2025
Violation issued (HPD, closed)
C
06/27/2025
Violation issued (HPD, open)
C
06/03/2025
Violation issued (HPD, closed)
C
06/03/2025
Violation issued (HPD, closed)
B
06/03/2025
Violation issued (HPD, closed)
B
05/13/2025
Violation issued (HPD, closed)
B
05/13/2025
Violation issued (HPD, closed)
C
05/13/2025
Violation issued (HPD, closed)
B
05/13/2025
Violation issued (HPD, closed)
B
05/13/2025
Violation issued (HPD, closed)
C
05/13/2025
Violation issued (HPD, closed)
C
05/13/2025
Violation issued (HPD, closed)
B
05/13/2025
Violation issued (HPD, closed)
B
05/13/2025
Violation issued (HPD, open)
C
05/13/2025
Violation issued (HPD, closed)
B
04/03/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01146892-I1
03/24/2025
Permit issued — General Construction
M08041370-I1-GC
02/14/2025
Violation issued (HPD, closed)
C
02/14/2025
Violation issued (HPD, closed)
C
02/14/2025
Violation issued (HPD, closed)
C
02/14/2025
Violation issued (HPD, closed)
C
12/06/2024
Violation issued (HPD, closed)
C
12/06/2024
Violation issued (HPD, closed)
C
12/06/2024
Violation issued (HPD, closed)
C
12/02/2024
Permit issued — Sidewalk Shed
M01146892-I1-SH
11/25/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01146892-I1
10/25/2024
Permit issued — General Construction
M08041370-S2-GC
10/21/2024
Filed — Alteration
REPAIRS OF EXISTING MORTAR IN THE REAR BUILDING FACADE THAT IS DETERIORATED. REPAIR OF LINTEL IN FRONT BUILDING. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M08041370-S2
10/21/2024
Violation issued (ECB, open)
Boilers
10/18/2024
Violation issued (HPD, closed)
B
10/18/2024
Violation issued (HPD, closed)
B
10/18/2024
Violation issued (HPD, closed)
B
10/18/2024
Violation issued (HPD, closed)
C
10/18/2024
Violation issued (HPD, closed)
C
10/18/2024
Violation issued (HPD, closed)
C
10/18/2024
Violation issued (HPD, closed)
B
10/18/2024
Violation issued (HPD, closed)
B
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTOTAL BUILDER CONSTRUCTIO03/24/2025
DOB NOWSidewalk ShedSigned-offPETER & DANNY CONTRACT LL12/02/2024
DOB NOWGeneral ConstructionSigned-offTOTAL BUILDER CONSTRUCTIO10/25/2024
DOB NOWGeneral ConstructionPermit IssuedTOTAL BUILDER CONSTRUCTIO07/17/2024
DOB NOWGeneral ConstructionSigned-offTOTAL BUILDER CONSTRUCTIO01/04/2024
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC12/02/2022
DOB NOWGeneral ConstructionSigned-offTOTAL BUILDER CONSTRUCTIO11/29/2022
DOB NOWGeneral ConstructionSigned-offTOTAL BUILDER CONSTRUCTIO10/21/2022
2 projects · most recent 10/21/2024
Water/Sanitary
FiledStatusContractorScope
10/21/2024Signed-offGLENNS PLUMBING SVCS INCWater/Sanitary
07/18/2024——Water/Sanitary
7 projects · most recent 12/18/2024
General Wiring
FiledStatusContractorScope
12/18/2024Permit IssuedRICHARD NEU—
11/16/2024Permit IssuedKWONG MING ELECTRIC INC11 meters
07/31/2024Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
12/18/2023Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
06/16/2023CompleteKWONG MING ELECTRIC INC—
03/13/2023CompleteKWONG MING ELECTRIC INC—
09/19/2022CompleteKWONG MING ELECTRIC INC—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
07/17/2024Tenant Protection Plan Compliance—special
07/11/2024FinalRobert Concessiprogress
12/15/2022Structural Stability – Alterations of existing buildings—special
12/15/2022Lighting in dwelling unitsRobert Concessienergy_progress
12/15/2022Air barrier - visual inspectionRobert Concessienergy_progress
12/15/2022Fenestration air leakageRobert Concessienergy_progress
12/15/2022Permanent certificateRobert Concessienergy_progress
12/15/2022Fenestration air leakageRobert Concessienergy_progress
12/15/2022Lighting in dwelling unitsRobert Concessienergy_progress
12/15/2022Air barrier - visual inspectionRobert Concessienergy_progress
12/15/2022Permanent certificateRobert Concessienergy_progress
12/15/2022Construction Operations Influencing Adjacent StructuresRobert Concessispecial
11/12/2022Fire-Resistant Penetrations and JointsRobert Concessispecial
11/12/2022FinalRobert Concessiprogress
11/12/2022Lighting in dwelling unitsRobert Concessienergy_progress
11/12/2022Fenestration air leakageRobert Concessienergy_progress
11/12/2022Air barrier - visual inspectionRobert Concessienergy_progress
11/12/2022Structural Stability – Alterations of existing buildingsRobert Concessispecial
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/01/2026M08020304-I1Request digital key ↗
09/01/2026M08039032-I1Request digital key ↗
09/01/2026M08041370-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/13/2026M08041370-I1Open ↗
08/13/2026M01079203-S1Open ↗
08/13/2026M08041370-S2Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026M08055337-I1Open ↗
08/13/2026M08039032-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026M08020304-I1Open ↗
09/01/2026M08041370-S2Open ↗
09/01/2026M08041370-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026M08039032-I1Open ↗
08/25/2026M08039032-I1Open ↗
08/23/2026M08041370-S2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026M08039032-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026M08055337-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026M08020304-I1Open ↗
09/01/2026M08041370-I1Open ↗
09/01/2026M08041370-S2Open ↗
Showing 3 of 8 on file for this type
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/13/2026M08039032-I1Open ↗
08/13/2026M08055337-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M08039032-I1Open ↗
08/13/2026M08055337-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026M08055337-I1Open ↗
08/13/2026M08039032-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026M08055337-I1Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M01079203-I1Open ↗