← Back
Primarily 5-6 family with 1 store or office
219 SOUTH 4 STREET
BROOKLYN · Williamsburg · BIN 3063319
💬 Discuss this project
1920Year Built
4Stories
S5Building Class
R6Zoning
5,757 sfGross Floor Area
7Units
Rent Stabilized14 Open Violations ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: 219 SOUTH 4TH LLC · 2,043 sf lot · 2.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivil
Roof41p · 1 filing · 20 docs
Penthouse41p · 1 filing · 20 docs
Floor 442p · 1 filing · 20 docs
Floor 339p · 1 filing · 20 docs
Floor 242p · 1 filing · 20 docs
Floor 124p · 1 filing · 20 docs
Cellar24p · 1 filing · 20 docs
Site & exterior8p · 3 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GW EQUITIES2907/08/2026
RASKINRISERS1207/08/2026
J G CONSTRUCTION SRVCS703/22/2026
219 SOUTH 4TH LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/01/2023$1.8M—— → —$313/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAOBAB ARCHITECTS P.C.606/12/2025
CHOSEN MEP, CORP.305/16/2024
ASHRAF CORP205/08/2024
BGM ENGINEERING404/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMG GROUP USA1003/21/2026
ELLIPSES DESIGN103/21/2026
HIGHRISE GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADOR BUILDERS LLCGeneral Contractor807/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor303/21/2026
TRUE POWER ELECL CONT LLCElectrical103/22/2026
DOUG'S PLBG & HTG SERV COFire Protection107/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524606/12/2025
CENTURY TESTING & CONSULT4081605/16/2024
Building Lifecycle
All (213)Filed (15)Permit Issued (9)Signed Off (8)Violation (60)Inspection (11)Objection (80)Special Inspection (30)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/15/2025
Special inspection requirement — Maintenance information
ALDO BRAVO
07/15/2025
Special inspection requirement — Fenestration air leakage
ALDO BRAVO
07/15/2025
Special inspection requirement — Lighting controls
ALDO BRAVO
07/15/2025
Special inspection requirement — Insulation placement and R values
ALDO BRAVO
07/15/2025
Special inspection requirement — Lighting in dwelling units
ALDO BRAVO
07/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/15/2025
Special inspection requirement — Air barrier - visual inspection
ALDO BRAVO
07/15/2025
Special inspection requirement — Metering
ALDO BRAVO
07/15/2025
Special inspection requirement — Exterior lighting power
ALDO BRAVO
07/15/2025
Special inspection requirement — Fenestration areas
ALDO BRAVO
07/15/2025
Special inspection requirement — Interior lighting power
ALDO BRAVO
07/15/2025
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
07/15/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Shahrish Shuvo
07/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ALDO BRAVO
07/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
07/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
ALDO BRAVO
07/15/2025
Special inspection requirement — Protection of exposed foundation insulation
ALDO BRAVO
06/12/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
ALTERATION TYPE 1 APPLICATION FOR ENLARGEMENT TO EXISTING 3 STORY + CLELLAR MIXED USE BUILDING. PROPOSED 4 STORY + CELLAR, PENTHOUSE MIXED USE BUILDING.
B08050434-P6
06/10/2025
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
06/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
ALDO BRAVO
06/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
06/10/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Shahrish Shuvo
06/10/2025
Special inspection requirement — Exterior lighting power
ALDO BRAVO
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
06/10/2025
Special inspection requirement — Protection of exposed foundation insulation
ALDO BRAVO
06/10/2025
Special inspection requirement — Fenestration air leakage
ALDO BRAVO
06/10/2025
Special inspection requirement — Air barrier - visual inspection
ALDO BRAVO
06/10/2025
Special inspection requirement — Insulation placement and R values
ALDO BRAVO
06/10/2025
Special inspection requirement — Interior lighting power
ALDO BRAVO
06/10/2025
Special inspection requirement — Maintenance information
ALDO BRAVO
06/10/2025
Special inspection requirement — Fenestration areas
ALDO BRAVO
01/14/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
ALTERATION TYPE 1 APPLICATION FOR ENLARGEMENT TO EXISTING 3 STORY + CLELLAR MIXED USE BUILDING. PROPOSED 4 STORY + CELLAR, PENTHOUSE MIXED USE BUILDING.
B08050434-S2
12/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/13/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
ALTERATION TYPE 1 APPLICATION FOR ENLARGEMENT TO EXISTING 3 STORY + CLELLAR MIXED USE BUILDING. PROPOSED 4 STORY + CELLAR, PENTHOUSE MIXED USE BUILDING.
B08050434-P5
10/30/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
ALTERATION TYPE 1 APPLICATION FOR ENLARGEMENT TO EXISTING 3 STORY + CLELLAR MIXED USE BUILDING. PROPOSED 4 STORY + CELLAR, PENTHOUSE MIXED USE BUILDING.
B08050434-S3
10/28/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
ALTERATION TYPE 1 APPLICATION FOR ENLARGEMENT TO EXISTING 3 STORY + CLELLAR MIXED USE BUILDING. PROPOSED 4 STORY + CELLAR, PENTHOUSE MIXED USE BUILDING.
B08050434-S1
10/16/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/15/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/10/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/2024
Signed off — Alteration
FENCE APPLICATION HEREBY BEING FILED IN CONJUNCTION TO ALT-CO B08050434-I1
B00920631-I1
09/12/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
ALTERATION TYPE 1 APPLICATION FOR ENLARGEMENT TO EXISTING 3 STORY + CLELLAR MIXED USE BUILDING. PROPOSED 4 STORY + CELLAR, PENTHOUSE MIXED USE BUILDING.
B08050434-P4
09/10/2024
Permit issued — Mechanical Systems
B08050434-S2-MS
08/27/2024
Permit issued — Sprinklers
B08050434-S3-EW-SP
08/20/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01046603-I1
08/20/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01032602-I1
07/25/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
ALTERATION TYPE 1 APPLICATION FOR ENLARGEMENT TO EXISTING 3 STORY + CLELLAR MIXED USE BUILDING. PROPOSED 4 STORY + CELLAR, PENTHOUSE MIXED USE BUILDING.
B08050434-S4
07/12/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
Latest 60 of 213 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offADOR BUILDERS LLC09/10/2024
DOB NOWSprinklersSigned-offDOUG'S PLBG & HTG SERV CO08/27/2024
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC06/03/2024
DOB NOWStructuralSigned-offADOR BUILDERS LLC05/20/2024
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS04/17/2024
DOB NOWGeneral ConstructionPermit IssuedADOR BUILDERS LLC02/14/2024
DOB NOWFoundationSigned-offADOR BUILDERS LLC02/14/2024
DOB NOWConstruction FenceSigned-offADOR BUILDERS LLC02/13/2024
DOB NOWConstruction FenceSigned-offADOR BUILDERS LLC12/19/2023
BISPLISSUEDSEICKEL & SONS PLUMB02/11/2005
BISBLISSUEDSEICKEL & SONS PLUMB02/11/2005
1 project · most recent 06/12/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/12/2025Signed-offADOR BUILDERS LLCAir Conditioning Systems, Heating Systems
Cooling
Daikin DAIKIN - 4MXS36MWVJU9 36,000 BTU · Heat Pump Outdoor ×6
DAIKIN - 3MXS24MWVJU9 25,500 BTU · Heat Pump Outdoor ×5
DAIKIN - RXTQ60TBVJUA 48,000 BTU · Vrf Outdoor ×1
Heating
Daikin DAIKIN - 4MXS36MWVJU9 42,000 BTU · Heat Pump Outdoor ×6
DAIKIN - 3MXS24MWVJU9 2,200 BTU · Heat Pump Outdoor ×3
DAIKIN - RXTQ60TBVJUA 54,000 BTU · Vrf Outdoor ×1
1 project · most recent 06/12/2025
Storm Water/Sanitary
FiledStatusContractorScope
06/12/2025Signed-offJVR PLBG AND HEATING INCStorm, Water/Sanitary
2 projects · most recent 04/12/2024
General Wiring
FiledStatusContractorScope
04/12/2024CompleteRICHARD NEU—
03/28/2024CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
1 project · most recent 06/12/2025
Concrete Masonry
FiledStatusContractorScope
06/12/2025Signed-offADOR BUILDERS LLCConcrete, Masonry
1 project · most recent 06/12/2025
Earthwork
FiledStatusContractorScope
06/12/2025Signed-offADOR BUILDERS LLCEarthwork
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/12/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/26/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/14/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
02/26/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
07/15/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
07/15/2025Lighting controlsALDO BRAVOenergy_progress
07/15/2025MeteringALDO BRAVOenergy_progress
07/15/2025Fenestration air leakageALDO BRAVOenergy_progress
07/15/2025Protection of exposed foundation insulationALDO BRAVOenergy_progress
07/15/2025Air barrier - visual inspectionALDO BRAVOenergy_progress
07/15/2025Interior lighting powerALDO BRAVOenergy_progress
07/15/2025Exterior lighting powerALDO BRAVOenergy_progress
07/15/2025Fenestration and door U-factor and product ratingsALDO BRAVOenergy_progress
07/15/2025Lighting in dwelling unitsALDO BRAVOenergy_progress
07/15/2025Maintenance informationALDO BRAVOenergy_progress
07/15/2025Insulation placement and R valuesALDO BRAVOenergy_progress
07/15/2025Fenestration areasALDO BRAVOenergy_progress
07/15/2025Energy Code Compliance InspectionsALDO BRAVOprogress
07/15/2025Fire-Resistance Rated ConstructionALDO BRAVOprogress
07/15/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/15/2025Construction Operations Influencing Adjacent StructuresShahrish Shuvospecial
06/10/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
06/10/2025Lighting in dwelling unitsALDO BRAVOenergy_progress
06/10/2025Maintenance informationALDO BRAVOenergy_progress
06/10/2025Fenestration areasALDO BRAVOenergy_progress
06/10/2025MeteringALDO BRAVOenergy_progress
06/10/2025Fenestration and door U-factor and product ratingsALDO BRAVOenergy_progress
06/10/2025Lighting controlsALDO BRAVOenergy_progress
06/10/2025Protection of exposed foundation insulationALDO BRAVOenergy_progress
Latest 25 of 93.
▾Documents — 160 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/26/2026B00920631-I1Request digital key ↗
08/26/2026B08050434-P5Request digital key ↗
08/26/2026B08050434-P6Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
11/29/2024301900129Open ↗
01/24/2024340908003Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
01/24/2024340908003Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B08050434-P4Open ↗
08/13/2026B08050434-I1Open ↗
08/13/2026B08050434-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B08050434-P1Open ↗
08/13/2026B08050434-P5Open ↗
08/13/2026B08050434-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08050434-I1Open ↗
▸Seals & Professional Certifications83
▸DOB NOWProgress Inspector Seal & Signature52
09/01/2026B08050434-S2Open ↗
09/01/2026B08050434-S2Open ↗
09/01/2026B08050434-S2Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/26/2026B00920631-I1Open ↗
08/26/2026B08050434-P6Open ↗
08/26/2026B08050434-P5Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026B08050434-S2Open ↗
09/01/2026B08050434-S2Open ↗
08/28/2026B08050434-S4Open ↗
Showing 3 of 14 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/24/2024340908003Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/24/2024340908003Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026B08050434-I1Open ↗
08/13/2026B08050434-P4Open ↗
08/13/2026B08050434-P6Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection5
▸BISBPP: STREET TREES SITE PLAN1
03/07/2024340908003Open ↗
▸BISSTREET TREE CHECKLIST1
03/07/2024340908003Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B08050434-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B08050434-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B08050434-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/26/2026B08050434-P6Open ↗
08/26/2026B08050434-P5Open ↗
08/26/2026B08050434-P4Open ↗
Showing 3 of 12 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B08050434-S2Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026B08050434-P3Open ↗
08/13/2026B08050434-S5Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B08050434-S5Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/30/2024340908003Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
03/07/2024340908003Open ↗
▸BISADDITIONAL INFORMATION1
03/07/2024340908003Open ↗
▸Other Documents19
▸DOB NOWSite Survey: Initial5
08/13/2026B08050434-P1Open ↗
08/13/2026B08050434-P6Open ↗
08/13/2026B08050434-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B08050434-P4Open ↗
08/13/2026B08050434-P6Open ↗
08/13/2026B08050434-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/26/2026B08050434-P6Open ↗
08/26/2026B08050434-P5Open ↗
08/26/2026B08050434-P4Open ↗
Showing 3 of 5 on file for this type
▸BISSupporting Document: Fee Exempt1
03/13/2024340908003Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/07/2024340908003Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B08050434-S5Open ↗
▸DOB NOWFinal Survey1
08/13/2026B08050434-I1Open ↗